SHIFT :I

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 4

01:00 114.56 412,416 4

02:00 114.56 412,416 4

03:00 114.56 412,416 4

04:00 114.56 412,416 4

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
175 0.55 -1.15 0.11 0

183 0.54 -1.16 0.11 0

181 0.57 -1.17 0.11 0

180 0.55 -1.18 0.12 0

180 0.57 -1.16 0.13 0

179 0.57 -1.17 0.14 0


180 0.55 -1.18 0.15 0

181 0.57 -1.18 0.16 0

179.88 0.56 -1.17 0.13

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

30

0 0 1 1 30

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
180 0.55 -1.25 0.14 0.00383

178 0.54 -1.25 0.14 0.00383

175 0.57 -1.25 0.14 0.00383

150 0.55 -1.25 0.15 0.00383

154 0.57 -1.26 0.15 0.00383

158 0.57 -1.27 0.14 0.00383

162 0.55 -1.28 0.15 0.00383

166 0.57 -1.29 0.14 0.00383


165.38 0.56 -1.26 0.14

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

20

0 0 0 0 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
175 0.55 -1.4 0.15 0.00383

182 0.54 -1.43 0.06 0.00383

187 0.57 -1.38 0.06 0.00383

190 0.55 -1.4 0.15 0.00383

196 0.57 -1.27 0.15 0.00383

205 0.57 -1.37 0.09 0.00383

200 0.55 -1.4 0.06 0.00383

196 0.57 -1.4 0.06 0.00383

191.38 0.56 -1.38 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30


0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0.00 132.48

0.00 0.13

12.22 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00
10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4

14:00 114.56 412,416 4

15:00 114.56 412,416 4


Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN B


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

16:00 1

17:00 1

18:00 1

19:00 1
20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN B
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START
START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1

04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA


DEBIT AIR BAKU DEBIT AIR TEKANAN AIR
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 3.5

01:00 114.56 412,416 3.5

02:00 114.56 412,416 3.5

03:00 114.56 412,416 3.5

04:00 114.56 412,416 3.5

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.69

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN B
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
190 0.37 -1.28 0.09 0.00383

187 0.37 -1.29 0.09 0.00383

183 0.37 -1.3 0.09 0.00383

180 0.35 -1.31 0.09 0.00383

179 0.36 -1.32 0.09 0.00383

178 0.37 -1.33 0.09 0.00383

176 0.38 -1.28 0.09 0.00383

174 0.39 -1.29 0.09 0.00383


180.88 0.37 -1.30 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
173 0.37 -1.36 0.08 0.00383

152 0.37 -1.45 0.08 0.00383

150 0.37 -1.54 0.08 0.00383

148 0.35 -1.63 0.08 0.00383

150 0.36 -1.56 0.08 0.00383

155 0.37 -1.54 0.08 0.00383

160 0.38 -1.56 0.08 0.00383

165 0.39 -1.45 0.08 0.00383

156.63 0.37 -1.51 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

20
1 1

20

1 1 0 0 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0
STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR AIR AIR
RESERVOIR SCM L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
170 0.37 -1.29 0.08 0.00383

181 0.37 -1.33 0.08 0.00383

195 0.37 -1.37 0.08 0.00383

200 0.35 -1.41 0.08 0.00383

215 0.36 -1.29 0.08 0.00383

215 0.37 -1.37 0.08 0.00383

212 0.38 -1.29 0.08 0.00383

210 0.39 -1.37 0.08 0.00383

199.75 0.37 -1.34 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30
110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL
STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)

GENSET
OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)

GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 4

01:00 114.56 412,416 4

02:00 114.56 412,416 4

03:00 114.56 412,416 4

04:00 114.56 412,416 4

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
210 0.37 -1.3 0.07 0.00383

208 0.37 -1.32 0.07 0.00383

206 0.37 -1.34 0.07 0.00383

205 0.35 -1.36 0.07 0.00383

204 0.36 -1.38 0.07 0.00383

203 0.37 -1.4 0.07 0.00383


202 0.38 -1.42 0.07 0.00383

200 0.39 -1.44 0.07 0.00383

204.75 0.37 -1.37 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
196 0.37 -1.33 0.07 0.00383

192 0.37 -1.37 0.07 0.00383

191 0.37 -1.36 0.07 0.00383

190 0.35 -1.35 0.07 0.00383

189 0.36 -1.33 0.08 0.00383

188 0.37 -1.37 0.09 0.00383

179 0.38 -1.38 0.07 0.00383

183 0.39 -1.38 0.07 0.00383


188.50 0.37 -1.36 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 1 9

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
185 0.37 -1.22 0.2 0.00383

195 0.37 -1.22 0.18 0.00383

205 0.37 -1.22 0.18 0.00383

208 0.35 -1.22 0.16 0.00383

200 0.36 -1.22 0.18 0.00383

197 0.37 -1.25 0.16 0.00383

194 0.38 -1.25 0.16 0.00383

177 0.39 -1.25 0.16 0.00383

195.13 0.37 -1.23 0.17

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

20

0 0 0 0 20

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30
13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START 152
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00
10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 3.8

22:00 114.56 412,416 3.8

23:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 3.93

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 2.8

01:00 114.56 412,416 2.8

02:00 114.56 412,416 2.8

03:00 114.56 412,416 2.8

04:00 114.56 412,416 4

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.40

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
175 0.37 -1.92 0.05 0.00383

177 0.37 -1.93 0.05 0.00383

170 0.37 -1.95 0.05 0.00383

170 0.35 -1.88 0.05 0.00383

170 0.36 -1.84 0.05 0.00383

169 0.37 -1.91 0.05 0.00383


168 0.38 -1.92 0.05 0.00383

167 0.39 -1.83 0.05 0.00383

170.75 0.37 -1.90 0.05

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

8 8

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
164 0.37 -1.15 0.08 0.00383

163 0.37 -1.17 0.08 0.00383

161 0.37 -1.19 0.08 0.00383

159 0.35 -1.21 0.08 0.00383

157 0.36 -1.23 0.08 0.00383

159 0.37 -1.25 0.08 0.00383

140 0.38 -1.27 0.08 0.00383

150 0.39 -1.29 0.08 0.00383


156.63 0.37 -1.22 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
154 0.37 -1.25 0.37 0

166 0.37 -1.22 0.37 0

178 0.37 -1.19 0.37 0

190 0.35 -1.16 0.35 0

210 0.36 -1.13 0.36 0

204 0.37 -1.1 0.37 0

202 0.38 -1.07 0.38 0

199 0.39 -1.04 0.39 0

187.88 0.37 -1.15 0.37

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30
13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00
10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0.00 0.00

0.00 0.00

0.00 0.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 4

01:00 114.56 412,416 4

02:00 114.56 412,416 4

03:00 114.56 412,416 4

04:00 114.56 412,416 4

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
185 0.37 -1.14 0.05 0

187 0.37 -1.21 0.05 0

187 0.37 -1.28 0.05 0

188 0.35 -1.35 0.05 0

189 0.36 -1.42 0.05 0

189 0.37 -1.49 0.05 0


187 0.38 -1.56 0.05 0

187 0.39 -1.63 0.05 0

187.38 0.37 -1.39 0.05

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
180 0.37 -1.54 0.12 0.00383

163 0.37 -1.57 0.12 0.00383

158 0.37 -1.56 0.12 0.00383

154 0.35 -1.58 0.15 0.00383

151 0.36 -1.59 0.15 0.00383

153 0.37 -1.60 0.15 0.00383

155 0.38 -1.61 0.15 0.00383

160 0.39 -1.62 0.15 0.00383


159.25 0.37 -1.58 0.14

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

17

0 1 0 1 17

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
165 0.37 -1.62 0.16 0.00383

170 0.37 -1.63 0.12 0.00383

173 0.37 -1.64 0.08 0.00383

176 0.35 -1.65 0.04 0.00383

179 0.36 -1.66 0.12 0.00383

178 0.37 -1.67 0.12 0.00383

175 0.38 -1.68 0.09 0.00383

168 0.39 -1.69 0.09 0.00383

173.00 0.37 -1.66 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30


0 0.0046 16.56 12.22 30

0 0.0046 16.56 12.22 30

0.00 132.48

0.00 0.13

12.22 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00
10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4

14:00 114.56 412,416 4

15:00 114.56 412,416 4


Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN B


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

16:00 1

17:00 1

18:00 1

19:00 1
20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 3.5

22:00 114.56 412,416 3.5

23:00 114.56 412,416 3.5

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.81

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN B
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1
START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1

04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA


DEBIT AIR BAKU DEBIT AIR TEKANAN AIR
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 3.2

01:00 114.56 412,416 3.2

02:00 114.56 412,416 3.2

03:00 114.56 412,416 3.2

04:00 114.56 412,416 3.8

05:00 114.56 412,416 3.8

06:00 114.56 412,416 3.8

07:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.50

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN B
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
162 0.45 -1.17 0.05 0.00383

157 0.49 -1.17 0.05 0.00383

153 0.47 -1.17 0.05 0.00383

151 0.47 -1.18 0.05 0.00383

150 0.49 -1.19 0.05 0.00383

149 0.45 -1.2 0.05 0.00383

148 0.49 -1.21 0.05 0.00383

147 0.49 -1.22 0.05 0.00383


152.13 0.48 -1.19 0.05

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
144 0.45 -1.35 0.08 0.00383

142 0.49 -1.35 0.08 0.00383

141 0.45 -1.35 0.08 0.00383

140 0.45 -1.35 0.08 0.00383

141 0.49 -1.35 0.08 0.00383

126 0.45 -1.38 0.08 0.00383

135 0.45 -1.42 0.08 0.00383

141 0.49 -1.43 0.08 0.00383

138.75 0.47 -1.37 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

15
15

0 0 0 0 15

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0
STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR AIR AIR
RESERVOIR SCM L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
148 0.45 -1.02 0.08 0.00383

158 0.49 -1.02 0.08 0.00383

168 0.45 -1.02 0.08 0.00383

178 0.45 -1.02 0.08 0.00383

188 0.49 -1.02 0.08 0.00383

185 0.45 -1.02 0.08 0.00383

181 0.45 -1.02 0.08 0.00383

179 0.49 -1.02 0.08 0.00383

173.13 0.47 -1.02 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30
110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 12.22 30

13.788 0 0 12.22 30

13.788 0 0 12.22 30

13.788 0 0 12.22 30

13.788 0 0 12.22 30

13.788 0 0 12.22 30

13.788 0 0 12.22 30

13.788 0 0 12.22 30

110.30 0.00

0.11 0.00

12.22 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL
STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 30 30

13.788 0 0 30 30

13.788 0 0 30 30

13.788 0 0 30 30

13.788 0 0 30 30

13.788 0 0 30 30

13.788 0 0 30 30

13.788 0 0 30 30

110.30 0.00

0.11 0.00

30.00 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)

GENSET
OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)

GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 3.5

09:00 114.56 412,416 3.5

10:00 114.56 412,416 3.5

11:00 114.56 412,416 3.5

12:00 114.56 412,416 3.5

13:00 114.56 412,416 3.5


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.63

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 3.5

01:00 114.56 412,416 3.5

02:00 114.56 412,416 3.5

03:00 114.56 412,416 3.5

04:00 114.56 412,416 3.8

05:00 114.56 412,416 3.8

06:00 114.56 412,416 3.8

07:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.65

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
177 0.45 -1.36 0.07 0

158 0.49 -1.36 0.07 0

153 0.45 -1.36 0.06 0

154 0.45 -1.36 0.08 0

160 0.49 -1.36 0.07 0

160 0.45 -1.37 0.07 0


160 0.45 -1.33 0.07 0

159 0.49 -1.33 0.07 0

160.13 0.47 -1.35 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
158 0.45 -1.38 0.07 0

156 0.49 -1.31 0.07 0

136 0.45 -1.86 0.07 0

139 0.45 -1.86 0.07 0

140 0.49 -1.86 0.07 0

142 0.45 -1.86 0.07 0

147 0.45 -1.86 0.07 0

150 0.49 -1.86 0.07 0


146.00 0.47 -1.73 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

20

1 1 0 0 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
159 0.45 -1.38 0.06 0.00383

168 0.49 -1.31 0.06 0.00383

175 0.45 -1.86 0.06 0.00383

179 0.45 -1.86 0.06 0.00383

181 0.49 -1.86 0.06 0.00383

178 0.45 -1.86 0.06 0.00383

175 0.45 -1.86 0.06 0.00383

167 0.49 -1.86 0.06 0.00383

172.75 0.47 -1.73 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30


0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0.00 110.30

0.00 0.11

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0 0.00383 13.788 10.02 30

0.00 110.30

0.00 0.11
10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL 2125.046

STAND AKHIR

START
GENSET
OFF
GENSET

-2125.046
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 3.8

09:00 114.56 412,416 3.8

10:00 114.56 412,416 3.8

11:00 114.56 412,416 3.8

12:00 114.56 412,416 3.8

13:00 114.56 412,416 3.8


14:00 114.56 412,416 3.8

15:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.80

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 3.8

17:00 114.56 412,416 3.8

18:00 114.56 412,416 3.8

19:00 114.56 412,416 3.8

20:00 114.56 412,416 3.8

21:00 114.56 412,416 3.8

22:00 114.56 412,416 3.8

23:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 3.80

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 3.5

01:00 114.56 412,416 3.5

02:00 114.56 412,416 3.5

03:00 114.56 412,416 3.5

04:00 114.56 412,416 3.8

05:00 114.56 412,416 3.8

06:00 114.56 412,416 3.8

07:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.65

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
163 0.45 -1.31 0.08 0.00383

159 0.47 -1.31 0.08 0.00383

157 0.49 -1.31 0.08 0.00383

154 0.51 -1.33 0.08 0.00383

151 0.44 -1.32 0.08 0.00383

150 0.46 -1.31 0.08 0.00383


148 0.47 -1.35 0.08 0.00383

145 0.49 -1.29 0.08 0.00383

153.38 0.47 -1.32 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
140 0.45 -1.01 0.09 0.00383

134 0.47 -1.01 0.09 0.00383

132 0.49 -1.01 0.09 0.00383

130 0.51 -1.01 0.09 0.00383

128 0.44 -1.01 0.09 0.00383

126 0.46 -1.32 0.09 0.00383

125 0.47 -1.28 0.09 0.00383

125 0.49 -1.29 0.09 0.00383


130.00 0.47 -1.12 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
150 0.45 -1.12 0.08 0.00383

167 0.47 -1.12 0.08 0.00383

165 0.49 -1.12 0.08 0.00383

176 0.51 -1.12 0.08 0.00383

182 0.44 -1.12 0.08 0.00383

184 0.46 -0.97 0.06 0.00383

183 0.47 -0.97 0.06 0.00383

180 0.49 -0.97 0.06 0.00383

173.38 0.47 -1.06 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30
13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00
10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 3.8

09:00 114.56 412,416 3.8

10:00 114.56 412,416 3.8

11:00 114.56 412,416 3.8

12:00 114.56 412,416 3.8

13:00 114.56 412,416 3.8


14:00 114.56 412,416 3.8

15:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.80

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 106.47 383,292 4

19:00 106.47 383,292 3.5

20:00 106.47 383,292 3.5

21:00 106.47 383,292 3.5

22:00 106.47 383,292 3.5

23:00 106.47 383,292 3.5

Liter 3,124,584.00
JUMLAH
M3 3,124.58
RANGE 3.69

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 106.47 383,292 3.5

01:00 106.47 383,292 3.5

02:00 106.47 383,292 3.5

03:00 106.47 383,292 3.5

04:00 106.47 383,292 4

05:00 106.47 383,292 4

06:00 106.47 383,292 4

07:00 106.47 383,292 4

Liter 3,066,336.00
JUMLAH
M3 3,066.34

RANGE 3.75

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

5 20

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
176 0.46 -0.97 0.05 0.009

173 0.46 -0.97 0.05 0.009

171 0.47 -0.97 0.05 0.009

168 0.48 -0.97 0.05 0.009

165 0.49 -0.97 0.05 0.009

162 0.41 -0.97 0.05 0.009


160 0.54 -0.97 0.05 0.009

159 0.41 -0.97 0.05 0.009

166.75 0.47 -0.97 0.05

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

20

0 0 0 0 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
157 0.46 -0.97 0.09 0.00383

152 0.46 -1.16 0.09 0.00383

131 0.47 -1.16 0.09 0.00383

130 0.48 -1.16 0.09 0.00383

129 0.49 -1.16 0.1 0.00383

129 0.41 -1.16 0.1 0.00383

129 0.54 -1.16 0.1 0.00383

131 0.41 -1.16 0.1 0.00383


136.00 0.47 -1.14 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

20

0 0 0 0 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
153 0.46 -0.93 0.08 0.00383

160 0.46 -0.93 0.08 0.00383

167 0.47 -0.93 0.08 0.00383

175 0.48 -0.87 0.08 0.00383

180 0.49 -0.87 0.08 0.00383

180 0.41 -0.87 0.08 0.00383

178 0.54 -0.93 0.08 0.00383

175 0.41 -0.89 0.08 0.00383

171.00 0.47 -0.90 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

18

0 0 1 1 18

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
32.4 0 0 10.47 30

32.4 0 0 10.47 30

32.4 0 0 10.47 30

32.4 0 0 10.47 30

32.4 0 0 10.47 30

32.4 0 0 10.47 30
32.4 0 0 10.47 30

32.4 0 0 10.47 30

259.20 0.00

0.26 0.00

10.47 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00
10.02 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

13.788 0 0 10.02 30

110.30 0.00

0.11 0.00

10.02 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 106.47 383,292 4

09:00 106.47 383,292 4

10:00 106.47 383,292 4

11:00 106.47 383,292 4

12:00 106.47 383,292 4

13:00 106.47 383,292 4


14:00 106.47 383,292 4

15:00 106.47 383,292 4

Liter 3,066,336.00
JUMLAH
M3 3,066.34

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 106.47 383,292 3.5

17:00 106.47 383,292 3.5

18:00 106.47 383,292 3.5

19:00 106.47 383,292 3.5

20:00 106.47 383,292 3.5

21:00 106.47 383,292 3.5

22:00 106.47 383,292 3.5

23:00 106.47 383,292 3.5

Liter 3,066,336.00
JUMLAH
M3 3,066.34
RANGE 3.50

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 106.47 383,292 3.5

01:00 106.47 383,292 3.5

02:00 106.47 383,292 3.5

03:00 106.47 383,292 3.5

04:00 106.47 383,292 3.5

05:00 106.47 383,292 3.5

06:00 106.47 383,292 3.5

07:00 106.47 383,292 3.5

Liter 3,066,336.00
JUMLAH
M3 3,066.34

RANGE 3.50

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
170 0.55 -0.96 0.1 0

168 0.56 -0.96 0.1 0

166 0.57 -0.96 0.08 0

166 0.59 -0.96 0.09 0

166 0.61 -0.96 0.09 0

166 0.63 -0.96 0.09 0


165 0.57 -0.96 0.09 0

165 0.59 -0.96 0.09 0

166.50 0.58 -0.96 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

22

0 0 0 0 22

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
161 0.55 -1.17 0.09 0

160 0.56 -1.12 0.09 0

159 0.57 -1.15 0.09 0

160 0.59 -1.17 0.09 0

160 0.61 -1.12 0.08 0

161 0.63 -1.15 0.07 0

161 0.57 -1.12 0.08 0

161 0.59 -1.15 0.09 0


160.38 0.58 -1.14 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

20

1 0 0 1 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
162 0.33 -1.58 0.21 0.00483

167 0.33 -1.58 0.21 0.00483

172 0.33 -1.58 0.21 0.00483

178 0.33 -1.58 0.21 0.00483

181 0.45 -1.59 0.21 0.00483

179 0.45 -1.6 0.21 0.00483

175 0.45 -1.61 0.21 0.00483

171 0.45 -1.62 0.21 0.00483

173.13 0.39 -1.59 0.21

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30


0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0.00 139.10

0.00 0.14

13.61 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0 0.00483 17.388 13.61 30

0.00 139.10

0.00 0.14
13.61 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 13.61 30

17.388 0 0 13.61 30

17.388 0 0 13.61 30

17.388 0 0 13.61 30

17.388 0 0 13.61 30

17.388 0 0 13.61 30

17.388 0 0 13.61 30

17.388 0 0 13.61 30

139.10 0.00

0.14 0.00

13.61 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 106.47 383,292 3.5

09:00 106.47 383,292 3.5

10:00 106.47 383,292 3.5

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,211,956.00
JUMLAH
M3 3,211.96

RANGE 3.81

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 131.31 472,716 4

01:00 131.31 472,716 4

02:00 131.31 472,716 4

03:00 131.31 472,716 4

04:00 131.31 472,716 4

05:00 131.31 472,716 4

06:00 131.31 472,716 4

07:00 131.31 472,716 4

Liter 3,781,728.00
JUMLAH
M3 3,781.73

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
167 0.34 -1.77 0.12 0.00483

166 0.56 -1.77 0.12 0.00483

165 0.44 -1.75 0.12 0.00483

170 0.34 -1.73 0.12 0.00483

175 0.34 -1.71 0.12 0.00483

180 0.34 -1.69 0.12 0.00483


185 0.57 -1.67 0.12 0.00483

188 0.59 -1.65 0.12 0.00483

174.50 0.44 -1.72 0.12

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
194 0.55 -1.57 0.12 0.00483

205 0.56 -1.45 0.12 0.00483

212 0.57 -1.46 0.12 0.00483

222 0.59 -1.47 0.12 0.00483

223 0.61 -1.48 0.12 0.00483

233 0.63 -1.49 0.13 0.00483

242 0.57 -1.5 0.13 0.00483

211 0.59 -1.51 0.12 0.00483


217.75 0.58 -1.49 0.12

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1 1 1

31

1 1 1 1 31

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
221 0.55 -0.95 0.15 0.00483

243 0.56 -0.9 0.15 0.00483

266 0.57 -0.92 0.15 0.00483

273 0.59 -0.95 0.15 0.00483

273 0.61 -0.95 0.07 0.00483

281 0.63 -0.93 0.07 0.00483

252 0.57 -1.1 0.07 0.00483

259 0.59 -1.1 0.07 0.00483

258.50 0.58 -0.98 0.11

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

20

0 0 0 0 20

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30
17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

13.00 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00
12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4

14:00 114.56 412,416 4

15:00 114.56 412,416 4


Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN B


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

16:00 1

17:00 1

18:00 1

19:00 1
20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN B
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START
START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1

04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA


DEBIT AIR BAKU DEBIT AIR TEKANAN AIR
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 90.91 327,276 4

01:00 90.91 327,276 4

02:00 90.91 327,276 4

03:00 90.91 327,276 4

04:00 90.91 327,276 4

05:00 90.91 327,276 4

06:00 90.91 327,276 4

07:00 90.91 327,276 4

Liter 2,618,208.00
JUMLAH
M3 2,618.21

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN B
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
256 0.35 -1.25 0.1 0.00483

254 0.37 -1.34 0.12 0.00483

252 0.35 -1.41 0.05 0.00483

252 0.37 -1.42 0.1 0.00483

253 0.35 -1.43 0.12 0.00483

253 0.37 -1.25 0.12 0.00483

254 0.35 -1.34 0.12 0.00483

255 0.34 -1.46 0.05 0.00483


253.63 0.36 -1.36 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
260 0.35 -1.12 0.05 0.00483

262 0.37 -1.12 0.05 0.00483

260 0.35 -1.12 0.05 0.00483

262 0.37 -1.12 0.05 0.00483

262 0.35 -1.4 0.06 0.00483

262 0.37 -1.41 0.06 0.00483

263 0.35 -1.37 0.06 0.00483

260 0.34 -1.38 0.06 0.00483

261.38 0.36 -1.26 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6
0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMP

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0
STROKE POMPA D
TURBIDITY TURBIDITY DP (Dosis Pembu
LEVEL AIR AIR AIR
RESERVOIR SCM L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
260 0.35 -1.17 0.06 0.004

250 0.37 -1.14 0.06 0.004

240 0.35 -1.17 0.06 0.004

230 0.37 -1.19 0.06 0.004

220 0.35 -1.17 0.06 0.004

210 0.37 -1.12 0.06 0.004

204 0.35 -1.17 0.06 0.004

200 0.34 -1.07 0.06 0.004

226.75 0.36 -1.15 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

15

0 0 0 0 15

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30
139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL
STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
14.4 0 0 10.47 30

14.4 0 0 10.47 30

14.4 0 0 10.47 30

14.4 0 0 10.47 30

14.4 0 0 10.47 30

14.4 0 0 10.47 30

14.4 0 0 10.47 30

14.4 0 0 10.47 30

115.20 0.00

0.12 0.00

10.47 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)

GENSET
OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)

GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 90.91 327,276 4

09:00 90.91 327,276 4

10:00 90.91 327,276 4

11:00 90.91 327,276 4

12:00 90.91 327,276 3.6

13:00 90.91 327,276 3.6


14:00 106.47 383,292 3.6

15:00 106.47 383,292 3.6

Liter 2,730,240.00
JUMLAH
M3 2,730.24

RANGE 3.80

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 106.47 383,292 3.5

17:00 110.49 397,764 3.5

18:00 110.49 397,764 3.5

19:00 114.56 412,416 3.5

20:00 114.56 412,416 3.5

21:00 114.56 412,416 3.5

22:00 114.56 412,416 3.5

23:00 114.56 412,416 3.5

Liter 3,240,900.00
JUMLAH
M3 3,240.90
RANGE 3.50

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 3.3

01:00 114.56 412,416 3.3

02:00 114.56 412,416 3.3

03:00 114.56 412,416 3.3

04:00 114.56 412,416 3.8

05:00 114.56 412,416 3.8

06:00 114.56 412,416 3.8

07:00 114.56 412,416 3.8

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 3.55

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
173 0.58 -1.01 0.21 0.00483

162 0.57 -1.01 0.21 0.00483

153 0.54 -1.01 0.21 0.00483

144 0.57 -1.01 0.21 0.00483

139 0.55 -1.01 0.21 0.00483

137 0.58 -1.01 0.21 0.00483


135 0.55 -1.01 0.18 0.00483

132 0.58 -1.01 0.21 0.00483

146.88 0.57 -1.01 0.21

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
129 0.58 -1.09 0.11 0.00483

128 0.57 -1.01 0.11 0.00483

126 0.54 -1.04 0.11 0.00483

125 0.57 -1.09 0.11 0.00483

106 0.55 -1.09 0.11 0.00483

120 0.58 -1.04 0.11 0.00483

124 0.55 -1.05 0.11 0.00483

127 0.58 -1.09 0.11 0.00483


123.13 0.57 -1.06 0.11

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

19

0 0 1 1 19

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
132 0.24 -1.22 0.1 0.00483

140 0.28 -1.27 0.1 0.00483

148 0.27 -1.22 0.1 0.00483

156 0.24 -1.20 0.1 0.00483

162 0.26 -1.18 0.1 0.00483

156 0.24 -1.20 0.1 0.00483

150 0.24 -1.18 0.1 0.00483

145 0.24 -1.14 0.1 0.00483

148.63 0.25 -1.20 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30
17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00
12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 106.47 383,292 3.5

09:00 106.47 383,292 2.8

10:00 106.47 383,292 2.8

11:00 118.67 427,212 2.8

12:00 118.67 427,212 3.8

13:00 118.67 427,212 3.8


14:00 118.67 427,212 3.8

15:00 118.67 427,212 3.8

Liter 3,285,936.00
JUMLAH
M3 3,285.94

RANGE 3.39

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

5 10

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 4

01:00 118.67 427,212 4

02:00 118.67 427,212 4

03:00 118.67 427,212 4

04:00 118.67 427,212 4

05:00 118.67 427,212 4

06:00 118.67 427,212 4

07:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
140 0.38 -1.05 0.24 0.00483

128 0.38 -1.04 0.25 0.00483

128 0.37 -1.05 0.24 0.00483

140 0.39 -1.05 0.25 0.00483

150 0.38 -1.05 0.24 0.00483

155 0.38 -1.05 0.25 0.00483


163 0.38 -1.05 0.24 0.00483

166 0.38 -1.05 0.25 0.00483

146.25 0.38 -1.05 0.25

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
173 0.48 -1.15 0.22 0.00483

175 0.45 -1.13 0.22 0.00483

178 0.47 -1.22 0.22 0.00483

180 0.49 -1.25 0.22 0.00483

155 0.41 -1.25 0.22 0.00483

170 0.37 -1.26 0.22 0.00483

171 0.47 -1.28 0.22 0.00483

176 0.38 -1.24 0.22 0.00483


172.25 0.44 -1.22 0.22

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

25

0 0 0 0 25

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
188 0.48 -1.51 0.13 0.00483

190 0.45 -1.51 0.13 0.00483

200 0.47 -1.51 0.13 0.00483

205 0.49 -1.51 0.13 0.00483

210 0.41 -1.51 0.13 0.00483

209 0.37 -1.51 0.13 0.00483

209 0.47 -1.51 0.13 0.00483

208 0.38 -1.51 0.13 0.00483

202.38 0.44 -1.51 0.13

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30
17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00
12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 4

01:00 118.67 427,212 4

02:00 118.67 427,212 4

03:00 118.67 427,212 4

04:00 118.67 427,212 4

05:00 118.67 427,212 4

06:00 118.67 427,212 4

07:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
188 0.47 -1.25 0.33 0.00483

184 0.46 -1.09 0.33 0.00483

185 0.45 -1.03 0.33 0.00483

185 0.45 -1.01 0.33 0.00483

185 0.43 -1.14 0.33 0.00483

185 0.47 -1.17 0.33 0.00483


187 0.47 -1.21 0.33 0.00483

188 0.47 -1.2 0.33 0.00483

185.88 0.46 -1.14 0.33

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
189 0.47 -1.42 0.07 0.00483

187 0.46 -1.42 0.07 0.00483

170 0.45 -1.42 0.07 0.00483

177 0.45 -1.44 0.07 0.00483

181 0.43 -1.43 0.07 0.00483

185 0.47 -1.44 0.07 0.00483

192 0.47 -1.44 0.07 0.00483

196 0.47 -1.44 0.07 0.00483


184.63 0.46 -1.43 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
200 0.26 -1.38 0.07 0.00483

208 0.26 -1.38 0.07 0.00483

216 0.26 -1.38 0.07 0.00483

226 0.27 -1.38 0.07 0.00483

230 0.28 -1.35 0.07 0.00483

232 0.28 -1.35 0.07 0.00483

229 0.28 -1.35 0.07 0.00483

225 0.28 -1.35 0.07 0.00483

220.75 0.27 -1.37 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30
17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL 2150.806

STAND AKHIR

START
GENSET
OFF
GENSET

-2150.806

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00
12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 4

01:00 118.67 427,212 4

02:00 118.67 427,212 4

03:00 118.67 427,212 4

04:00 118.67 427,212 4

05:00 118.67 427,212 4

06:00 118.67 427,212 4

07:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
200 0.36 -1.41 0.07 0.00483

204 0.36 -1.7 0.07 0.00483

203 0.36 -1.79 0.07 0.00483

203 0.39 -1.73 0.07 0.00483

205 0.36 -1.41 0.07 0.00483

207 0.38 -1.75 0.07 0.00483


209 0.37 -1.41 0.07 0.00483

211 0.36 -1.41 0.07 0.00483

205.25 0.37 -1.58 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
218 0.56 -1.55 0.10 0.00483

217 0.53 -1.7 0.10 0.00483

216 0.5 -1.79 0.10 0.00483

215 0.47 -1.73 0.10 0.00483

223 0.44 -1.75 0.10 0.00483

228 0.41 -1.75 0.10 0.00483

235 0.53 -1.79 0.10 0.00483

242 0.53 -1.79 0.10 0.00483


224.25 0.50 -1.73 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
220 0.51 -1.4 0.09 0.00483

235 0.49 -1.38 0.09 0.00483

240 0.47 -1.4 0.09 0.00483

248 0.48 -1.39 0.09 0.00483

250 0.49 -1.38 0.09 0.00483

255 0.49 -1.38 0.09 0.00483

253 0.47 -1.4 0.09 0.00483

249 0.5 -1.4 0.09 0.00483

243.75 0.49 -1.39 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

30

0 0 1 1 30

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30
17.388 12.64 30

17.388 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00
12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 106.47 383,292 4

17:00 94.72 340,992 4.2

18:00 87.15 313,740 4.2

19:00 87.15 313,740 4.2

20:00 87.15 313,740 4.2

21:00 87.15 313,740 4.2

22:00 87.15 313,740 4.2

23:00 87.15 313,740 4.2

Liter 2,606,724.00
JUMLAH
M3 2,606.72
RANGE 4.18

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 87.15 313,740 4.2

01:00 87.15 313,740 4.2

02:00 87.15 313,740 4.2

03:00 87.15 313,740 4.2

04:00 87.15 313,740 4.2

05:00 87.15 313,740 4.2

06:00 87.15 313,740 4.2

07:00 87.15 313,740 4.2

Liter 2,509,920.00
JUMLAH
M3 2,509.92

RANGE 4.20

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
247 0.51 -1.36 0.11 0.00483

248 0.49 -1.36 0.11 0.00483

223 0.47 -1.36 0.11 0.00483

226 0.48 -1.66 0.11 0.00483

228 0.49 -1.64 0.11 0.00483

240 0.49 -1.67 0.11 0.00483


252 0.47 -1.67 0.11 0.00483

269 0.5 -1.63 0.11 0.00483

241.63 0.49 -1.54 0.11

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
277 0.27 -1.1 0.07 0.00383

282 0.23 -1.19 0.07 0.00383

281 0.19 -1.04 0.07 0.00383

277 0.23 -1.05 0.07 0.00383

273 0.23 -1.06 0.07 0.00383

269 0.23 -1.07 0.08 0.00383

262 0.23 -1.08 0.08 0.00383

260 0.23 -1.09 0.08 0.00383


272.63 0.23 -1.09 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
274 0.49 -1.04 0.05 0.00483

277 0.49 -1.01 0.05 0.00483

280 0.47 -1.01 0.05 0.00483

282 0.48 -1.04 0.05 0.00483

280 0.49 -1.04 0.05 0.00483

274 0.49 -1.04 0.05 0.00483

251 0.47 -0.96 0.05 0.00483

225 0.5 -1.01 0.05 0.00483

267.88 0.49 -1.02 0.05

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30
17.388 12.64 30

17.388 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

110.30 0.00

0.11 0.00
10.80 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

17.388 0 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 87.15 313,740 4

09:00 87.15 313,740 4

10:00 102.5 369,000 4

11:00 102.5 369,000 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,074,328.00
JUMLAH
M3 3,074.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 3.5

01:00 118.67 427,212 3.5

02:00 118.67 427,212 3.5

03:00 118.67 427,212 3.5

04:00 118.67 427,212 3.5

05:00 118.67 427,212 4

06:00 118.67 427,212 4

07:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 3.69

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
220 0.24 -0.9 0.04 0.00483

192 0.24 -1.22 0.04 0.00483

185 0.24 -1.22 0.04 0.00483

185 0.24 -1.22 0.04 0.00483

186 0.24 -1.22 0.04 0.00483

183 0.25 -1.22 0.04 0.00483


180 0.25 -1.22 0.04 0.00483

178 0.25 -1.22 0.04 0.00483

188.63 0.24 -1.18 0.04

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
181 0.26 -1.31 0.04 0.00483

180 0.27 -1.31 0.04 0.00483

179 0.26 -1.31 0.04 0.00483

179 0.27 -1.31 0.04 0.00483

178 0.27 -1.32 0.04 0.00483

157 0.28 -1.33 0.04 0.00483

162 0.26 -1.34 0.04 0.00483

160 0.26 -1.35 0.04 0.00483


172.00 0.27 -1.32 0.04

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

15

1 1

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
170 0.23 -0.95 0.06 0.00483

185 0.23 -0.96 0.06 0.00483

200 0.23 -0.97 0.06 0.00483

209 0.23 -0.98 0.06 0.00483

209 0.23 -0.97 0.06 0.00483

209 0.23 -0.98 0.06 0.00483

209 0.23 -0.95 0.06 0.00483

209 0.23 -0.95 0.06 0.00483

200.00 0.23 -0.96 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 16.62 30

17.388 0 0 16.62 30

17.388 0 0 16.62 30

17.388 0 0 16.62 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30
17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00

14.42 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00
12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00

12.21 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 3.5

15:00 118.67 427,212 3.5

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 3.88

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

45

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1

STOP

0 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 4

01:00 118.67 427,212 4

02:00 118.67 427,212 4

03:00 118.67 427,212 4

04:00 118.67 427,212 4

05:00 118.67 427,212 4

06:00 118.67 427,212 4

07:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
206 0.47 -1.22 0.07 0.00483

203 0.49 -1.22 0.07 0.00483

200 0.38 -1.22 0.12 0.00483

194 0.48 -1.22 0.15 0.00483

190 0.48 -1.22 0.16 0.00483

189 0.49 -1.22 0.16 0.00483


188 0.47 -1.22 0.16 0.00483

179 0.5 -1.22 0.16 0.00483

193.63 0.47 -1.22 0.13

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

45

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
190 0.24 -1.94 0.07 0.00483

161 0.24 -1.94 0.07 0.00483

160 0.24 -1.94 0.07 0.00483

158 0.24 -1.94 0.07 0.00483

158 0.24 -1.95 0.07 0.00483

160 0.24 -1.97 0.07 0.00483

162 0.24 -1.93 0.07 0.00483

166 0.24 -1.94 0.07 0.00483


164.38 0.24 -1.94 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

29

0 0 0 1 29

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
190 0.47 -1.2 0.08 0.0083

161 0.45 -1.15 0.08 0.00383

160 0.38 -1.15 0.08 0.00383

158 0.48 -1.12 0.07 0.00383

158 0.48 -1.1 0.07 0.00383

160 0.49 -0.87 0.07 0.00383

162 0.47 -0.66 0.07 0.00383

166 0.38 -0.68 0.07 0.00383

164.38 0.45 -0.99 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

20

0 0 1 1 20

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30
17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00

12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00
12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
29.88 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

13.788 0 0 10.8 30

126.40 0.00

0.13 0.00

10.80 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

2200 LARUTAN

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 3.2

01:00 118.67 427,212 3.2

02:00 118.67 427,212 3.2

03:00 118.67 427,212 3.2

04:00 118.67 427,212 3.2

05:00 118.67 427,212 3.2

06:00 118.67 427,212 3.2

07:00 118.67 427,212 3.2

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 3.20

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
174 0.47 -1.39 0.07 0.00483

189 0.45 -1.39 0.06 0.00483

203 0.38 -1.39 0.06 0.00483

214 0.48 -1.39 0.06 0.00483

212 0.48 -1.39 0.06 0.00483

210 0.49 -1.17 0.06 0.00483


207 0.47 -1.17 0.06 0.00483

201 0.38 -1.16 0.07 0.00483

201.25 0.45 -1.31 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
146 0.47 -1.48 0.07 0.00483

139 0.45 -1.48 0.07 0.00483

135 0.38 -1.48 0.07 0.00483

107 0.48 -1.48 0.07 0.00483

106 0.48 -1.48 0.07 0.00483

103 0.49 -1.45 0.07 0.00483

100 0.47 -1.45 0.07 0.00483

104 0.38 -1.45 0.07 0.00483


117.50 0.45 -1.47 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

15

0 0 0 1 15

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
105 0.26 -1.32 0.1 0.00483

109 0.26 -1.34 0.1 0.00483

114 0.26 -1.36 0.1 0.00483

117 0.26 -1.38 0.1 0.00483

120 0.26 -1.4 0.1 0.00483

115 0.26 -1.42 0.1 0.00483

100 0.26 -1.44 0.1 0.00483

95 0.26 -1.16 0.1 0.00483

109.38 0.26 -1.35 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30
17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00

12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00
12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00

12.21 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 1.8

09:00 118.67 427,212 1.8

10:00 118.67 427,212 1.8

11:00 118.67 427,212 1.8

12:00 118.67 427,212 1.8

13:00 118.67 427,212 1.8


14:00 118.67 427,212 3.5

15:00 118.67 427,212 3.5

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 2.23

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1

STOP

1 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 3.8

01:00 118.67 427,212 3.8

02:00 118.67 427,212 3.8

03:00 118.67 427,212 3.8

04:00 118.67 427,212 3.8

05:00 118.67 427,212 3.8

06:00 118.67 427,212 3.8

07:00 118.67 427,212 3.8

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 3.80

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
90 0.47 -1.19 0.07 0.00483

95 0.45 -1.19 0.06 0.00483

100 0.38 -1.19 0.06 0.00483

113 0.34 -1.15 0.08 0.00483

125 0.35 -1.19 0.06 0.00483

140 0.37 -1.17 0.06 0.00483


134 0.47 -1.19 0.06 0.00483

138 0.38 -1.19 0.06 0.00483

116.88 0.40 -1.18 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
140 0.4 -1.2 0.09 0.00483

139 0.45 -1.22 0.09 0.00483

121 0.36 -1.24 0.09 0.00483

135 0.34 -1.24 0.09 0.00483

141 0.35 -1.24 0.09 0.00483

146 0.37 -1.24 0.09 0.00483

150 0.47 -1.34 0.07 0.00483

155 0.38 -1.35 0.08 0.00483


140.88 0.39 -1.26 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

18

0 0 1 0 18

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
162 0.47 -1.19 0.07 0.00383

175 0.45 -1.19 0.06 0.00383

190 0.38 -1.19 0.06 0.00383

200 0.34 -1.15 0.08 0.00383

200 0.35 -1.19 0.06 0.00383

200 0.37 -1.17 0.06 0.00383

200 0.47 -1.19 0.06 0.00383

205 0.38 -1.19 0.06 0.00383

191.50 0.40 -1.18 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30
17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00

12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00
12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
13.788 0 0 12.21 30

13.788 0 0 12.21 30

13.788 0 0 12.21 30

13.788 0 0 12.21 30

13.788 0 0 12.21 30

13.788 0 0 12.21 30

13.788 0 0 12.21 30

13.788 0 0 12.21 30

110.30 0.00

0.11 0.00

12.21 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1

STOP

0 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 118.67 427,212 4

01:00 118.67 427,212 4

02:00 118.67 427,212 4

03:00 118.67 427,212 4

04:00 118.67 427,212 4

05:00 118.67 427,212 4

06:00 118.67 427,212 4

07:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
210 0.37 -1.29 0.15 0.00483

209 0.35 -1.29 0.15 0.00483

208 0.36 -1.3 0.15 0.00483

208 0.38 -1.26 0.15 0.00483

208 0.39 -1.31 0.15 0.00483

200 0.37 -1.33 0.15 0.00483


235 0.38 -1.32 0.15 0.00483

245 0.38 -1.29 0.15 0.00483

215.38 0.37 -1.30 0.15

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
242 0.35 -1.39 0.1 0.00483

243 0.35 -1.39 0.1 0.00483

243 0.36 -1.34 0.1 0.00483

243 0.27 -1.37 0.1 0.00483

248 0.25 -1.34 0.1 0.00483

253 0.29 -1.37 0.1 0.00483

239 0.29 -1.39 0.1 0.00483

244 0.29 -1.39 0.1 0.00483


244.38 0.31 -1.37 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

20

0 0 0 1 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
215 0.35 -1.42 0.1 0.00483

223 0.35 -1.42 0.1 0.00483

226 0.36 -1.42 0.1 0.00483

229 0.27 -1.42 0.1 0.00483

230 0.25 -1.42 0.1 0.00483

205 0.29 -1.47 0.1 0.00483

206 0.29 -1.47 0.1 0.00483

190 0.29 -1.46 0.1 0.00483

215.50 0.31 -1.44 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

25

1 0 1 0 25

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30
17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.00

12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START 149
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00
12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

139.10 0.00

0.14 0.00

12.21 0.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 4

17:00 118.67 427,212 4

18:00 118.67 427,212 4

19:00 118.67 427,212 4

20:00 118.67 427,212 4

21:00 118.67 427,212 4

22:00 118.67 427,212 4

23:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 122.84 442,224 3.5

01:00 118.67 427,212 3.5

02:00 118.67 427,212 3.5

03:00 118.67 427,212 3.5

04:00 118.67 427,212 4

05:00 118.67 427,212 4

06:00 118.67 427,212 4

07:00 118.67 427,212 4

Liter 3,432,708.00
JUMLAH
M3 3,432.71

RANGE 3.75

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
205 0.35 -1.42 0.35 0

205 0.35 -1.43 0.35 0

205 0.36 -1.45 0.36 0

205 0.27 -1.47 0.27 0

205 0.25 -1.45 0.25 0

205 0.29 -1.46 0.29 0


204 0.29 -1.42 0.29 0

204 0.29 -1.42 0.29 0

204.75 0.31 -1.44 0.31

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
198 0.29 -1.66 0.29 0

195 0.28 -1.66 0.28 0

170 0.29 -1.66 0.29 0

174 0.27 -1.66 0.27 0

177 0.25 -1.25 0.25 0

179 0.29 -1.22 0.29 0

180 0.29 -1.22 0.29 0

183 0.29 -1.32 0.29 0


182.00 0.28 -1.46 0.28

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

25

0 0 1 1 25

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
192 0.29 -1.6 0.29 0

201 0.28 -1.25 0.28 0

210 0.29 -1.22 0.29 0

219 0.27 -1.6 0.27 0

220 0.25 -1.25 0.25 0

224 0.29 -1.22 0.29 0

217 0.29 -1.22 0.29 0

213 0.29 -1.32 0.29 0

212.00 0.28 -1.34 0.28

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

35

0 0 0 0 35

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00 0.00

0.00 0.00

0.00 0.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0.00 0.00

0.00 0.00
0.00 0.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0.00 0.00

0.00 0.00

0.00 0.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

08:00 118.67 427,212 4

09:00 118.67 427,212 4

10:00 118.67 427,212 4

11:00 118.67 427,212 4

12:00 118.67 427,212 4

13:00 118.67 427,212 4


14:00 118.67 427,212 4

15:00 118.67 427,212 4

Liter 3,417,696.00
JUMLAH
M3 3,417.70

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 118.67 427,212 1.8

17:00 118.67 427,212 3.2

18:00 122.84 442,224 3.2

19:00 122.84 442,224 3.2

20:00 122.84 442,224 3.2

21:00 122.84 442,224 3.2

22:00 122.84 442,224 2.2

23:00 122.84 442,224 2.2

Liter 3,507,768.00
JUMLAH
M3 3,507.77
RANGE 2.78

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 122.84 442,224 2.4

01:00 122.84 442,224 2.4

02:00 122.84 442,224 2.4

03:00 122.84 442,224 2.4

04:00 122.84 442,224 2.4

05:00 122.84 442,224 3.5

06:00 122.84 442,224 3.5

07:00 122.84 442,224 3.5

Liter 3,537,792.00
JUMLAH
M3 3,537.79

RANGE 2.81

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


LEVEL AIR TURBIDITY TURBIDITY DP (Dosis Pembubuh
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
174 0.34 -1.38 0.13 0.00483

159 0.34 -1.38 0.13 0.00483

142 0.34 -1.38 0.13 0.00483

124 0.37 -1.38 0.13 0.00483

90 0.34 -1.38 0.13 0.00483

90 0.31 -1.38 0.13 0.00483


95 0.28 -1.38 0.13 0.00483

100 0.25 -1.38 0.13 0.00483

121.75 0.32 -1.38 0.13

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

20

0 0 1 0 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
87 0.38 -1.35 0.08 0.00483

66 0.38 -1.23 0.08 0.00483

95 0.36 -1.22 0.08 0.00483

91 0.36 -1.21 0.08 0.00483

88 0.36 -1.2 0.08 0.00483

86 0.33 -1.19 0.08 0.00483

85 0.37 -1.04 0.08 0.00483

85 0.38 -1.01 0.1 0.00483


85.38 0.37 -1.18 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

20

1 1 0 0 20

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
114 0.38 -0.95 0.09 0.00483

120 0.37 -0.95 0.09 0.00483

127 0.38 -0.9 0.09 0.00483

136 0.36 -0.84 0.09 0.00483

141 0.36 -0.81 0.06 0.00483

137 0.33 -0.79 0.06 0.00483

131 0.37 -0.75 0.06 0.00483

128 0.38 -0.75 0.06 0.00483

129.25 0.37 -0.84 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0

17.388 0 0 12.21 0
17.388 0 0 12.21 0

17.388 0 0 12.21 0

139.10 0.00

0.14 0.00

12.21 0.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00
12.21 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

17.388 0 0 12.21 30

139.10 0.00

0.14 0.00

12.21 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 122.84 442,224 4

09:00 122.84 442,224 4

10:00 122.84 442,224 4

11:00 122.84 442,224 4

12:00 122.84 442,224 4

13:00 122.84 442,224 4


14:00 122.84 442,224 4

15:00 122.84 442,224 4

Liter 3,537,792.00
JUMLAH
M3 3,537.79

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 122.84 442,224 4

17:00 122.84 442,224 4

18:00 122.84 442,224 4

19:00 122.84 442,224 4

20:00 122.84 442,224 4

21:00 122.84 442,224 4

22:00 122.84 442,224 4

23:00 122.84 442,224 4

Liter 3,537,792.00
JUMLAH
M3 3,537.79
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 122.84 442,224 1.8

01:00 122.84 442,224 1.8

02:00 122.84 442,224 1.8

03:00 122.84 442,224 4

04:00 122.84 442,224 4

05:00 122.84 442,224 4

06:00 122.84 442,224 4

07:00 122.84 442,224 4

Liter 3,537,792.00
JUMLAH
M3 3,537.79

RANGE 3.18

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
112 0.35 -0.73 0.04 0.00483

105 0.35 -0.7 0.04 0.00483

99 0.35 -0.71 0.04 0.00483

92 0.35 -0.73 0.04 0.00483

85 0.35 -0.72 0.08 0.00483

82 0.35 -0.77 0.09 0.00483


80 0.35 -0.81 0.07 0.00483

77 0.35 -0.73 0.08 0.00483

91.50 0.35 -0.74 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
80 0.23 -1.32 0.08 0.00483

82 0.27 -1.32 0.08 0.00483

91 0.23 -1.32 0.08 0.00483

101 0.23 -1.32 0.08 0.00483

112 0.27 -1.42 0.11 0.00483

123 0.27 -1.42 0.11 0.00483

135 0.27 -1.42 0.11 0.00483

170 0.23 -1.42 0.11 0.00483


111.75 0.25 -1.37 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
142 0.34 -1.4 0.11 0.00483

170 0.34 -1.37 0.11 0.00483

201 0.34 -1.37 0.11 0.00483

234 0.27 -1.37 0.11 0.00483

242 0.27 -1.34 0.11 0.00483

251 0.27 -1.31 0.12 0.00483

250 0.27 -1.28 0.11 0.00483

248 0.27 -1.25 0.13 0.00483

217.25 0.30 -1.34 0.11

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

28

0 0 0 0 28

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30
17.388 0 0 11.79 30

17.388 0 0 11.79 30

139.10 0.00

0.14 0.00

11.79 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

17.388 0 0 11.79 30

139.10 0.00

0.14 0.00
11.79 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 11.79 30

17.388 11.79 30

17.388 11.79 30

17.388 11.79 30

17.388 11.79 30

17.388 11.79 30

17.388 11.79 30

17.388 11.79 30

139.10 0.00

0.14 0.00

11.79 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 122.84 442,224 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,329,136.00
JUMLAH
M3 3,329.14

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 106.47 383,292 3.5

17:00 106.47 383,292 3.5

18:00 106.47 383,292 3.5

19:00 106.47 383,292 3.5

20:00 106.47 383,292 3.5

21:00 106.47 383,292 3.5

22:00 106.47 383,292 3.5

23:00 106.47 383,292 3.5

Liter 3,066,336.00
JUMLAH
M3 3,066.34
RANGE 3.50

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 4.1

01:00 114.56 412,416 4.1

02:00 102.5 369,000 4

03:00 102.5 369,000 4

04:00 102.5 369,000 4

05:00 102.5 369,000 4

06:00 102.5 369,000 4

07:00 102.5 369,000 4

Liter 3,038,832.00
JUMLAH
M3 3,038.83

RANGE 4.03

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
250 0.23 -1.1 0.14 0.00483

249 0.27 -1.19 0.09 0.00483

248 0.31 -1.2 0.09 0.00483

246 0.23 -1.22 0.09 0.00483

245 0.27 -1.23 0.08 0.00483

244 0.23 -1.02 0.08 0.00483


242 0.23 -1.02 0.08 0.00483

240 0.27 -1.01 0.08 0.00483

245.50 0.26 -1.12 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
150 0.24 -0.98 0.07 0.00483

150 0.24 -1.01 0.08 0.00483

149 0.24 -1.03 0.08 0.00483

148 0.24 -1.04 0.08 0.00483

120 0.24 -1.06 0.09 0.00483

130 0.24 -1.01 0.08 0.00483

140 0.24 -1.06 0.09 0.00483

150 0.24 -1.06 0.08 0.00483


142.13 0.24 -1.03 0.08

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

28

1 1 0 0 28

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
243 0.27 -1.16 0.09 0.00483

244 0.27 -1.16 0.08 0.00483

242 0.28 -1.16 0.07 0.00483

240 0.27 -1.17 0.07 0.00483

239 0.28 -1.12 0.07 0.00483

224 0.28 -1.14 0.07 0.00483

211 0.28 -1.19 0.07 0.00483

197 0.27 -1.19 0.07 0.00483

230.00 0.28 -1.16 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 11.79 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30
17.388 12.64 30

17.388 12.64 30

139.10 0.00

0.14 0.00

12.53 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

139.10 0.00

0.14 0.00
12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

17.388 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 106.47 383,292 3.9

09:00 106.47 383,292 3.9

10:00 106.47 383,292 3.9

11:00 106.47 383,292 3.9

12:00 106.47 383,292 3.9

13:00 106.47 383,292 3.9


14:00 106.47 383,292 3.9

15:00 106.47 383,292 3.9

Liter 3,066,336.00
JUMLAH
M3 3,066.34

RANGE 3.90

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 106.47 383,292 4

17:00 106.47 383,292 4

18:00 106.47 383,292 4

19:00 106.47 383,292 4

20:00 106.47 383,292 4

21:00 106.47 383,292 4

22:00 106.47 383,292 2.5

23:00 106.47 383,292 2.5

Liter 3,066,336.00
JUMLAH
M3 3,066.34
RANGE 3.63

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 106.47 383,292 4

01:00 106.47 383,292 4

02:00 106.47 383,292 4

03:00 106.47 383,292 4

04:00 106.47 383,292 4

05:00 106.47 383,292 4

06:00 106.47 383,292 4

07:00 106.47 383,292 4

Liter 3,066,336.00
JUMLAH
M3 3,066.34

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
200 0.23 -1.18 0.13 0.00483

175 0.23 -1.18 0.13 0.00483

176 0.23 -1.18 0.13 0.00483

178 0.23 -1.18 0.13 0.00483

178 0.23 -1.18 0.13 0.00483

179 0.23 -1.18 0.13 0.00483


180 0.23 -1.19 0.13 0.00483

180 0.23 -1.17 0.13 0.00483

180.75 0.23 -1.18 0.13

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
185 0.27 -1.19 0.13 0.00483

160 0.27 -1.19 0.13 0.00483

170 0.27 -1.19 0.13 0.00483

179 0.26 -1.19 0.13 0.00483

187 0.26 -1.19 0.13 0.00483

190 0.26 -1.18 0.13 0.00483

199 0.26 -1.17 0.13 0.00483

205 0.26 -1.19 0.13 0.00483


184.38 0.26 -1.19 0.13

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

25

0 0 1 1 25

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
213 0.35 -1.12 0.07 0.00483

220 0.36 -1.35 0.07 0.00483

227 0.38 -1.32 0.07 0.00483

234 0.35 -1.12 0.07 0.00483

241 0.34 -1.12 0.07 0.00483

241 0.36 -1.12 0.07 0.00483

241 0.38 -1.12 0.07 0.00483

240 0.45 -1.37 0.07 0.00483

232.13 0.37 -1.21 0.07

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

0 0 1 1 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30
17.388 0 12.64 30

17.388 0 12.64 30

139.10 0.00

0.14 0.00

12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

17.388 0 12.64 30

139.10 0.00

0.14 0.00
12.64 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 13.6 30

17.388 0 13.6 30

17.388 0 13.6 30

17.388 0 13.6 30

17.388 0 13.6 30

17.388 0 13.6 30

17.388 0 13.6 30

17.388 0 13.6 30

139.10 0.00

0.14 0.00

13.60 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 106.47 383,292 4.1

09:00 110.49 397,764 4.1

10:00 110.49 397,764 4.1

11:00 110.49 397,764 4.1

12:00 114.56 412,416 4.1

13:00 114.56 412,416 4.1


14:00 114.56 412,416 4.1

15:00 114.56 412,416 4.1

Liter 3,226,248.00
JUMLAH
M3 3,226.25

RANGE 4.10

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START 1 1

STOP

1 1

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 4

01:00 114.56 412,416 4

02:00 114.56 412,416 4

03:00 114.56 412,416 4

04:00 114.56 412,416 4

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
241 0.27 -1.27 0.12 0.00483

218 0.38 -1.22 0.12 0.00483

220 0.27 -1.27 0.12 0.00483

219 0.28 -1.17 0.12 0.00483

223 0.27 -1.25 0.12 0.00483

225 0.27 -1.17 0.12 0.00483


226 0.25 -1.17 0.12 0.00483

229 0.27 -1.27 0.12 0.00483

225.13 0.28 -1.22 0.12

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
230 0.38 -1.12 0.18 0.00383

205 0.37 -1.12 0.18 0.00383

200 0.39 -1.12 0.18 0.00383

203 0.36 -1.27 0.18 0.00383

206 0.36 -1.27 0.18 0.00383

208 0.35 -1.12 0.19 0.00383

218 0.4 -1.12 0.18 0.00383

221 0.45 -1.12 0.18 0.00383


211.38 0.38 -1.16 0.18

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

25

0 0 0 0 25

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
222 0.28 -1.35 0.28 0

231 0.21 -1.36 0.21 0

240 0.21 -1.36 0.21 0

244 0.21 -1.27 0.21 0

246 0.28 -1.23 0.28 0

248 0.28 -1.37 0.28 0

249 0.28 -1.27 0.28 0

249 0.21 -1.27 0.21 0

241.13 0.25 -1.31 0.25

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 13.6 30

17.388 13.6 30

17.388 13.6 30

17.388 13.6 30

17.388 13.6 30

17.388 13.6 30
17.388 13.6 30

17.388 13.6 30

139.10 0.00

0.14 0.00

13.60 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
13.788 0 13.6 30

13.788 0 13.6 30

13.788 0 13.6 30

13.788 0 13.6 30

13.788 0 13.6 30

13.788 0 13.6 30

13.788 0 13.6 30

13.788 0 13.6 30

110.30 0.00

0.11 0.00
13.60 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0.00 0.00

0.00 0.00

0.00 0.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 4

01:00 114.56 412,416 4

02:00 114.56 412,416 4

03:00 114.56 412,416 4

04:00 114.56 412,416 4

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
248 0.39 -1.22 0.08 0.00483

246 0.37 -1.37 0.12 0.00483

244 0.39 -1.38 0.12 0.00483

242 0.36 -1.38 0.13 0.00483

240 0.39 -1.22 0.08 0.00483

241 0.46 -1.22 0.08 0.00483


242 0.46 -1.22 0.12 0.00483

243 0.45 -1.36 0.06 0.00483

243.25 0.41 -1.30 0.10

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
244 0.36 -1.09 0.09 0.00483

219 0.37 -1.09 0.09 0.00483

216 0.39 -1.07 0.09 0.00483

214 0.36 -1.09 0.08 0.00483

217 0.34 -1.09 0.09 0.00483

218 0.41 -1.07 0.09 0.00483

220 0.46 -1.09 0.08 0.00483

222 0.45 -1.09 0.08 0.00483


221.25 0.39 -1.09 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

1 1

25

0 0 1 1 25

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
228 0.28 -1.06 0.05 0.00483

237 0.46 -1.06 0.05 0.00483

239 0.56 -1.06 0.05 0.00483

240 0.58 -1.06 0.05 0.00483

244 0.28 -1.05 0.05 0.00483

239 0.28 -1.05 0.05 0.00483

237 0.28 -1.05 0.05 0.00483

235 0.45 -1.05 0.05 0.00483

237.38 0.40 -1.06 0.05

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30
17.388 0 0 13.6 30

17.388 0 0 13.6 30

139.10 0.00

0.14 0.00

13.60 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

139.10 0.00

0.14 0.00
13.60 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

139.10 0.00

0.14 0.00

13.60 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
SHIFT :I
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

08:00 1

09:00 1

10:00 1

11:00 1

12:00 1

13:00 1

14:00 1

15:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk) (L/dtk) Kg/Cm²

08:00 114.56 412,416 4

09:00 114.56 412,416 4

10:00 114.56 412,416 4

11:00 114.56 412,416 4

12:00 114.56 412,416 4

13:00 114.56 412,416 4


14:00 114.56 412,416 4

15:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : II
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °


16:00 1

17:00 1

18:00 1

19:00 1

20:00 1

21:00 1

22:00 1

23:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


JAM DEBIT AIR BAKU DISTRBUSI DISTRIBUSI
(L/dtk)
(L/dtk) Kg/Cm²

16:00 114.56 412,416 4

17:00 114.56 412,416 4

18:00 114.56 412,416 4

19:00 114.56 412,416 4

20:00 114.56 412,416 4

21:00 114.56 412,416 4

22:00 114.56 412,416 4

23:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33
RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI JAM PELAKSANAAN BACK


( Detik/Menit/Jam ) PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)

SHIFT : III
U

JAM MOTOR POMPA 1

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE °

00:00 1

01:00 1

02:00 1

03:00 1
04:00 1

05:00 1

06:00 1

07:00 1

8
JUMLAH

2. DEBIT AIR BAKU, DEBIT DISTRIBUSI & KONSENTRASI KIMA

DEBIT AIR TEKANAN AIR


DEBIT AIR BAKU
JAM (L/dtk) DISTRBUSI DISTRIBUSI
(L/dtk) Kg/Cm²

00:00 114.56 412,416 4

01:00 114.56 412,416 4

02:00 114.56 412,416 4

03:00 114.56 412,416 4

04:00 114.56 412,416 4

05:00 114.56 412,416 4

06:00 114.56 412,416 4

07:00 114.56 412,416 4

Liter 3,299,328.00
JUMLAH
M3 3,299.33

RANGE 4.00

3. PERIODE DRAIN LUMPUR IPA & KWH METER

DURASI
( Detik/Menit/Jam ) JAM PELAKSANAAN BACK
PELAKSANAAN
BACK WASH
PELAKSANAAN
BACK WASH
FLOKULATOR SEDIMENTASI FILTER 1 FILTER 2

START

STOP

0 0

4. STOK KIMIA & PEMAKAIAN SOLAR GENSET

ACH SODIUM PEMAKAIAN SOLAR


(Liter) (Liter) (Cm)
UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
(Cm) BAKU DISTRIBUSI POMPA DOSING
(NTU) (NTU) 1
227 0.35 -1.8 0.05 0.00483

221 0.47 -1.7 0.05 0.00483

220 0.38 -1.6 0.05 0.00483

219 0.37 -1.5 0.05 0.00483

217 0.34 -1.4 0.05 0.00483

213 0.41 -1.3 0.07 0.00483


212 0.46 -1.2 0.06 0.00483

210 0.45 -1.1 0.07 0.00483

217.38 0.40 -1.45 0.06

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
RESERVOIR AIR SCM AIR L/s
BAKU DISTRIBUSI POMPA DOSING
(Cm)
(NTU) (NTU) 1
207 0.28 -1.87 0.19 0.00483

202 0.28 -1.87 0.19 0.00483

177 0.28 -1.87 0.19 0.00483

173 0.28 -1.87 0.2 0.00483

171 0.26 -1.88 0.2 0.00483

170 0.26 -1.88 0.2 0.00483

169 0.26 -1.88 0.2 0.00483

168 0.45 -1.88 0.1 0.00483


179.63 0.29 -1.88 0.18

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)

UNIT MOTOR POMPA

MOTOR POMPA 2 MOTOR POMPA 3

SPEED (Hz) AMPERE (A) VOLTAGE (V) OPEN VALVE ° SPEED (Hz)

1
1

8 0

STROKE POMPA DOS


TURBIDITY TURBIDITY DP (Dosis Pembubuh
LEVEL AIR
AIR AIR L/s
RESERVOIR BAKU SCM DISTRIBUSI
(Cm) POMPA DOSING
(NTU) (NTU) 1
175 0.48 -0.1 0.09 0.00483

178 0.38 -0.95 0.19 0.00483

180 0.36 -0.89 0.07 0.00483

184 0.37 -0.62 0.07 0.00483

186 0.39 -0.89 0.07 0.00483

180 0.42 -0.89 0.07 0.00483

178 0.46 -0.67 0.07 0.00483

177 0.45 -0.64 0.07 0.00483

179.75 0.41 -0.71 0.09

JAM PELAKSANAAN BACK WASH


KEHILANGAN AIR
m³ / Cm
KEHILANGAN AIR
m³ / Cm
FILTER 3 FILTER 4 FILTER 5 FILTER 6

0 0 0 0 0

PEMAKAIAN SOLAR
(Cm)
OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °

STROKE POMPA DOSING


DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm) %
1 2
17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30
17.388 0 0 13.6 30

17.388 0 0 13.6 30

139.10 0.00

0.14 0.00

13.60 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH [ACH]
POMPA DOSING POMPA DOSING (ppm)
%
1 2
17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

139.10 0.00

0.14 0.00
13.60 30.00

PEMAKAIAN KWH

URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

OVERLOAD
MOTOR SUMBER LISTRIK
MOTOR POMPA 3 POMPA / (PLN /GENSET)
TRIP
AMPERE (A) VOLTAGE (V) OPEN VALVE °
STROKE POMPA DOSING
DP (Dosis Pembubuhan) KONSENTRASI
L/s DO ACH
(ppm) [ACH]
POMPA DOSING POMPA DOSING %
1 2
17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

17.388 0 0 13.6 30

139.10 0.00

0.14 0.00

13.60 30.00

PEMAKAIAN KWH
URAIAN PLN GENSET

STAND AWAL

STAND AKHIR

START
GENSET
OFF
GENSET

0
OVER FLOW

SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET

OVER FLOW
SISA POS
CHLOR BEBAS CHLORINASI
(mg/L) (ppm)
GENSET
JAM OPERASIONAL MOTOR POMPA IPA MULYAMEKAR SADANG
MINGGU I

MOTOR POMPA I MOTOR POMPA II MOTOR POMPA III OVER LOAD


TGL MOTOR
POMPA (JAM)
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III JUMLAH
1 8 8 8 24 8 8 8 24 0 0 0 0
2 8 8 8 24 8 8 8 24 0 0 0 0
3 8 8 8 24 8 8 8 24 0 0 0 0
4 8 8 8 24 8 8 8 24 0 8 0 8
5 8 8 8 24 8 8 8 24 0 0 0 0
6 8 8 8 24 8 8 8 24 0 0 0 0
7 8 8 8 24 8 8 8 24 0 0 0 0
KET. TOTAL 168 TOTAL 168 TOTAL 8
PRESSURE AIR DIRSTRIBUSI INDIKATOR KUALITAS AIR
TURBIDITY METER AIR BAKU
KG/Cm2 SCM
(NTU) DISTRIBUSI (NTU)

TGL SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III

1 4.00 4.00 4.00 4.00 0.13 0.14 0.10 0.56 0.56 0.56 -1.17 -1.26 -1.38
2 4.00 4.00 3.69 3.90 0.09 0.08 0.08 0.37 0.37 0.37 -1.30 -1.51 -1.34
3 4.00 4.00 4.00 4.00 0.07 0.07 0.17 0.37 0.37 0.37 -1.37 -1.36 -1.23
4 4.00 3.93 3.40 3.78 0.05 0.08 0.37 0.37 0.37 0.37 -1.90 -1.22 -1.15
5 4.00 4.00 4.00 4.00 0.05 0.14 0.10 0.37 0.37 0.37 -1.39 -1.58 -1.66
6 4.00 3.81 3.50 3.77 0.05 0.08 0.08 0.48 0.47 0.47 -1.19 -1.37 -1.02
7 3.63 4.00 3.65 3.76 0.07 0.07 0.06 0.47 0.47 0.47 -1.35 -1.73 -1.73
0.07 0.10 0.14 0.43 0.42 0.42 -1.38 -1.43 -1.36
TGL 3.89 0.10 0.42 -1.39

PEMAKAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE
ALUMUNIUM CHLOROHYDRATE
DOSIS PEMBUBUHAN
TGL DOSIS OPTIMUM
DOSING 1 DOSING 2
SHIFT I SHIFT II SHIFT III m3 SHIFT I SHIFT II SHIFT III m3 SHIFT I SHIFT II SHIFT III RATA -RATA
1 0.000 0.110 0.110 0.221 0.132 0.000 0.000 0.132 12.22 10.02 10.02 10.75
2 0.110 0.110 0.110 0.331 0.000 0.000 0.000 0.000 10.02 10.02 10.02 10.02
3 0.110 0.110 0.110 0.331 0.000 0.000 0.000 0.000 10.02 10.02 10.02 10.02
4 0.110 0.110 0.000 0.221 0.000 0.000 0.000 0.000 10.02 10.02 0.00 6.68
5 0.000 0.110 0.110 0.221 0.132 0.000 0.000 0.132 12.22 10.02 10.02 10.75
6 0.110 0.110 0.110 0.331 0.000 0.000 0.000 0.000 10.02 12.22 30.00 17.41
7 0.000 0.000 0.110 0.110 0.110 0.110 0.000 0.221 10.02 10.02 10.02 10.02

TOTAL 1.765 TOTAL 0.486 TOTAL RATA- RATA 10.81

SODIUM HYPOCLORORITE KONSENTRASI ALUMUNIUM KONSENTRASI SODIUM


JUMLAH
POS CHLORINASI SISA CHLOR BEBAS CHLOROHYDRATE HYPOCLORORITE
TGL
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III ACH SODIUM
1 30.00 30.00 30.00 30.00
2 30.00 30.00 30.00 30.00
3 30.00 30.00 30.00 30.00
4 30.00 30.00 0.00 20.00
5 30.00 30.00 30.00 30.00
6 30.00 30.00 30.00 30.00
7 30.00 30.00 30.00 30.00
RATA-
RATA - RATA
RATA 28.57
PENGADAAN KIMIA
ALUMUNIUM CHLOROHYDRATE SODIUM HYPOCLORORITE JUMLAH
TGL
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III ACH SODIUM
1 0 0
2 0 0
3 0 0
4 0 0
5 0 0
6 0 0
7 0 0
TOTAL 0 0
PARAMETER AIR DAN LEVEL RESERVOIR

AIR BAKU M3 AIR DISTRIBUSI M3 LEVEL RESERVOIR


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III RATA -RATA

1 3,299.33 3,299.33 3,299.33 9,897.98 179.88 165.38 191.38 178.88


2 3,299.33 3,299.33 3,299.33 9,897.98 180.88 156.63 199.75 179.08
3 3,299.33 3,299.33 3,299.33 9,897.98 204.75 188.50 195.13 196.13
4 3,299.33 3,299.33 3,299.33 9,897.98 170.75 156.63 187.88 171.75
5 3,299.33 3,299.33 3,299.33 9,897.98 187.38 159.25 173.00 173.21
6 3,299.33 3,299.33 3,299.33 9,897.98 152.13 138.75 173.13 154.67
7 3,299.33 3,299.33 3,299.33 9,897.98 160.13 146.00 172.75 159.63

TOTAL 69,285.89 TOTAL TOTAL RATA- RATA 173

PENCUCIAN FILTER CEPAT / BACKWASH DRAIN OTOMATIS LUMPUR IPA SEDIMEN & FLOKULATOR

JUMLAH DEBIT PELAKSANAAN DRAIN DURASI


JUMLAH FILTER DURASI DEBIT
LITER WAKTU DEBIT AIR KEHILANGAN
TGL WAKTU AIR JUMLAH PIPA DRAIN 15 DRAIN L/D AIR M3
(MENIT) L/D
(DETIK)
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III
1 2 2 0 274,944 274,944 0 1 1 15 12.45 5,602.50
2 0 2 0 0 274,944 0 1 15 12.45 2,801.25
3 0 1 2 0 137,472 274,944 1 1 15 12.45 5,602.50
4 0 0 0 20 114.56 0 0 0 1 1 15 12.45 5,602.50
5 0 2 0 0 274,944 0 1 1 1 15 12.45 8,403.75
6 0 2 0 0 274,944 0 1 1 15 12.45 5,602.50
7 0 2 0 0 274,944 0 1 1 15 12.45 5,602.50
2 11 2 274,944 1,512,192 274,944 5 6 3
TOTAL 15 300 115 2,062 14 210 87.15 39

PEMAKAIAN POWER PLN DAN GENSET


POWER GENSET
POWER PLN
TGL STAND STAND JAM PEMAKAIAN GENSET
TOTAL START
STAND AWAL KWH STAND AKHIR KWH JUMLAH AWAL AKHIR
KWH GENSET
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III KWH KWH KWH START OFF JUMLAH
1 0.00
2 0.00
3 0.00
4 0.00 0
5 0.00
6 0.00
7 0.00
STOK SOLAR
HASIL PERHITUNGAN
LEVEL SOLAR PARAMETER TANK SOLAR
(M3) SATUAN
TGL JUMLAH
(LITER)
KONVERSI SHIFT I SHIFT II SHIFT III LEBAR PANJANG SHIFT I SHIFT II SHIFT III

22 100.00 1.77 3.46 0.00 0.00 0.00 0.00 0.00


23 0.00 0.00 0.00 0.00 0.00
24 0.00 0.00 0.00 0.00 0.00
25 0.00 0.00 0.00 0.00 0.00
26 0.00 0.00 0.00 0.00 0.00
27 0.00 0.00 0.00 0.00 0.00
28 0.00 0.00 0.00 0.00 0.00
JAM OPERASIONAL MOTOR POMPA IPA MULYAME
MINGGU II

MOTOR POMPA I MOTOR POMPA II


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III
8 8 8 8 24 8 8 8
9 8 8 8 24 8 8 8
10 8 8 8 24 8 8 8
11 8 8 8 24 8 8 8
12 8 8 8 24 8 8 8
13 8 8 8 24 8 8 8
14 8 8 8 24 8 8 8
KET. TOTAL 168 TOTAL
PRESSURE AIR DIRSTRIBUSI
TURBIDITY METER
KG/Cm2
(NTU) DISTRIBUSI

TGL SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II

8 3.80 3.80 3.65 3.75 0.08 0.09


9 3.80 3.69 3.75 3.75 0.05 0.10
10 4.00 3.50 3.50 3.67 0.09 0.09
11 3.81 4.00 4.00 3.94 0.12 0.12
12 4.00 4.00 4.00 4.00 0.10 0.06
13 3.80 3.50 3.55 3.62 0.21 0.11
14 3.39 4.00 4.00 3.80 0.25 0.22
0.13 0.11
TOTAL 3.79 0.12

PEMAKAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE
DOSIS PEMBUBUHAN
TGL
DOSING 1 DOSING 2
SHIFT I SHIFT II SHIFT III m3 SHIFT I SHIFT II SHIFT III
8 0.110 0.110 0.110 0.331 0.000 0.000 0.000
9 0.259 0.110 0.110 0.480 0.000 0.000 0.000
10 0.000 0.000 0.139 0.139 0.139 0.139 0.000
11 0.139 0.139 0.139 0.417 0.000 0.000 0.000
12 0.139 0.139 0.115 0.393 0.000 0.000 0.000
13 0.139 0.139 0.139 0.417 0.000 0.000 0.000
14 0.139 0.139 0.139 0.417 0.000 0.000 0.000

TOTAL 2.595 TOTAL


SODIUM HYPOCLORORITE KONSENTRASI ALUMUNIU
POS CHLORINASI SISA CHLOR BEBAS CHLOROHYDRATE
TGL
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I
8 30.00
9 30.00
10 30.00
11 30.00
12 30.00
13 30.00
14 30.00
RATA-
R
RATA
PENGADAAN KIMIA
ALUMUNIUM CHLOROHYDRATE SODIUM
TGL
SHIFT I SHIFT II SHIFT III SHIFT I
8
9
10
11
12
13
14
TOTAL
PARAMETER AIR DAN LEVEL RESERVOIR

AIR BAKU M3 AIR DISTRIBUSI M3


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III

8 3,299.33 3,299.33 3,299.33 9,897.98


9 3,299.33 3,124.58 3,066.34 9,490.25
10 3,066.34 3,066.34 3,066.34 9,199.01
11 3,211.96 3,299.33 3,781.73 10,293.01
12 3,299.33 3,299.33 2,618.21 9,216.86
13 2,730.24 3,240.90 3,299.33 9,270.47
14 3,285.94 3,417.70 3,417.70 10,121.33

TOTAL 67,488.91 TOTAL

PENCUCIAN FILTER CEPAT / BACKWASH

JUMLAH FILTER DURASI JUMLAH DEBIT / LITER


DEBIT AIR
TGL WAKTU
L/D
(MENIT)
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II
8 0 0 0 0 0
9 0 2 2 0 302,438
10 2 2 0 302,438 302,438
11 0 4 2 22 114.56 0 604,877
12 0 0 0 0 0
13 0 2 0 0 302,438
14 0 2 0 0 302,438
2 12 4 302,438 1,814,630
TOTAL 18 396 114.56 2,722

PEMAKAIAN POWER PLN DAN GENSET

POWER PLN
TGL
STAND AWAL KWH STAND AKHIR KWH TOTAL
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III KWH
8 0.00
9 0.00
10 0.00
11 0.00 0
12 0.00
13 0.00
14 0.00
STOK SOLAR

LEVEL SOLAR PARAMETER TANK SOLAR


TGL
KONVERSI SHIFT I SHIFT II SHIFT III LEBAR PANJANG

22 100.00 1.77 3.46


23
24
25
26
27
28
OR POMPA IPA MULYAMEKAR SADANG
MINGGU II

OMPA II MOTOR POMPA III OVER LOAD


MOTOR
JUMLAH SHIFT I SHIFT II SHIFT III JUMLAH POMPA (JAM)
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
168 TOTAL 0
INDIKATOR KUALITAS AIR
IDITY METER AIR BAKU
SCM
U) DISTRIBUSI (NTU)

SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III

0.07 0.47 0.47 0.47 -1.32 -1.12 -1.06


0.08 0.47 0.47 0.47 -0.97 -1.14 -0.90
0.21 0.58 0.58 0.39 -0.96 -1.14 -1.59
0.11 0.44 0.58 0.58 -1.72 -1.49 -0.98
0.06 0.36 0.36 0.36 -1.36 -1.26 -1.15
0.10 0.57 0.57 0.25 -1.01 -1.06 -1.20
0.13 0.38 0.44 0.44 -1.05 -1.22 -1.51
0.11 0.47 0.50 0.42 -1.20 -1.20 -1.20
0.46 -1.20

MAKAIAN KIMIA

ALUMUNIUM CHLOROHYDRATE

G2 DOSIS OPTIMUM
m3 SHIFT I SHIFT II SHIFT III RATA-RATA
0.000 10.02 10.02 10.02 10.02
0.000 10.47 10.02 10.02 10.17
0.278 13.61 13.61 13.61 13.61
0.000 13.00 12.64 12.64 12.76
0.000 12.64 12.64 10.47 11.92
0.000 12.64 12.64 12.64 12.64
0.000 12.64 12.64 12.64 12.64

0.278 TOTAL RATA- RATA 11.97


KONSENTRASI ALUMUNIUM KONSENTRASI SODIUM
JUMLAH
CHLOROHYDRATE HYPOCLORORITE
SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III ACH SODIUM
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00

RATA - RATA
30.00
NGADAAN KIMIA
SODIUM HYPOCLORORITE JUMLAH
SHIFT I SHIFT II SHIFT III ACH SODIUM
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
AIR DAN LEVEL RESERVOIR

BUSI M3 LEVEL RESERVOIR

JUMLAH SHIFT I SHIFT II SHIFT III RATA -RATA

153.38 130.00 173.38 152.25


166.75 136.00 171.00 157.92
166.50 160.38 173.13 166.67
174.50 217.75 258.50 216.92
253.63 261.38 226.75 247.25
146.88 123.13 148.63 139.54
146.25 172.25 202.38 173.63

TOTAL 179

DRAIN OTOMATIS LUMPUR IPA SEDIMEN & FLOKULATOR

PELAKSANAAN DRAIN DURASI


H DEBIT / LITER
WAKTU DEBIT AIR KEHILANGAN
JUMLAH PIPA 15
DRAIN L/D AIR M3
SHIFT III SHIFT I SHIFT II SHIFT III (DETIK)
0 1 1 15 12.45 5,602.50
302,438 1 15 12.45 2,801.25
0 1 1 15 12.45 5,602.50
302,438 1 1 15 12.45 5,602.50
0 1 1 15 12.45 5,602.50
0 1 15 12.45 2,801.25
0 15 12.45 0.00
604,877 5 5 0
10 150 87.15 28

POWER PLN DAN GENSET


POWER GENSET
STAND STAND JAM PEMAKAIAN GENSET
TOTAL START
AWAL AKHIR
KWH GENSET
KWH KWH START OFF JUMLAH

STOK SOLAR
HASIL PERHITUNGAN
(M3) SATUAN
JUMLAH
(LITER)
SHIFT I SHIFT II SHIFT III

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
JAM OPERASIONAL MOTOR POMPA IPA MULYAME
MINGGU III

MOTOR POMPA I MOTOR POMPA II


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III
15 8 8 8 24 8 8 8
16 8 8 8 24 8 8 8
17 8 8 8 24 8 8 8
18 8 8 8 24 8 8 8
19 8 8 8 24 8 8 8
20 8 8 8 24 8 8 8
21 8 8 8 24 8 8 8
KET. TOTAL 168 TOTAL
PRESSURE AIR DIRSTRIBUSI
TURBIDITY METER
KG/Cm2
(NTU) DISTRIBUSI

TGL SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II

15 4.00 4.00 4.00 4.00 0.33 0.07


16 4.00 4.00 4.00 4.00 0.07 0.10
17 4.00 4.18 4.20 4.13 0.11 0.07
18 4.00 4.00 3.69 3.90 0.04 0.04
19 3.88 4.00 4.00 3.96 0.13 0.07
20 4.00 4.00 3.20 3.73 0.06 0.07
21 2.23 4.00 3.80 3.34 0.06 0.09
0.12 0.07
TOTAL 3.86 0.09

PEMAKAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE
DOSIS PEMBUBUHAN
TGL
DOSING 1 DOSING 2
SHIFT I SHIFT II SHIFT III m3 SHIFT I SHIFT II SHIFT III
15 0.139 0.139 0.139 0.417 0.000 0.000 0.000
16 0.139 0.139 0.139 0.417 0.000 0.000 0.000
17 0.139 0.110 0.139 0.389 0.000 0.000 0.000
18 0.139 0.139 0.139 0.417 0.000 0.000 0.000
19 0.139 0.139 0.126 0.405 0.000 0.000 0.000
20 0.139 0.139 0.139 0.417 0.000 0.000 0.000
21 0.139 0.139 0.110 0.389 0.000 0.000 0.000

TOTAL 2.851 TOTAL


SODIUM HYPOCLORORITE KONSENTRASI ALUMUNI
POS CHLORINASI SISA CHLOR BEBAS CHLOROHYDRATE

TGL SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I

15 30.00
16 30.00
17 30.00
18 30.00
19 30.00
20 30.00
21 30.00
RATA-
R
RATA
PENGADAAN KIMIA
ALUMUNIUM CHLOROHYDRATE SODIUM
TGL
SHIFT I SHIFT II SHIFT III SHIFT I
15
16
17
18
19
20
21
TOTAL
PARAMETER AIR DAN LEVEL RESERVOIR

AIR BAKU M3 AIR DISTRIBUSI M3


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III

15 3,417.70 3,417.70 3,417.70 10,253.09


16 3,417.70 3,417.70 3,417.70 10,253.09
17 3,417.70 2,606.72 2,509.92 8,534.34
18 3,074.33 3,417.70 3,417.70 9,909.72
19 3,417.70 3,417.70 3,417.70 10,253.09
20 3,417.70 3,417.70 3,417.70 10,253.09
21 3,417.70 3,417.70 3,417.70 10,253.09

TOTAL 69,709.50 TOTAL

PENCUCIAN FILTER CEPAT / BACKWASH

JUMLAH FILTER DURASI JUMLAH DEBIT


DEBIT AIR
TGL WAKTU
L/D
(MENIT)
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II
15 0 0 0 0 0
16 0 0 2 0 0
17 0 0 0 0 0
18 0 2 0 22 114.56 0 302,438
19 0 2 2 0 302,438
20 0 1 0 0 151,219
21 0 2 0 0 302,438
0 7 4 0 1,058,534
TOTAL 11 242 115 1,663

PEMAKAIAN POWER PLN DAN GENSET

POWER PLN
TGL
STAND AWAL KWH STAND AKHIR KWH TOTAL
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III KWH
15 2,150.81
16 0.00
17 0.00
18 0.00 -2,151
19 0.00
20 0.00
21 0.00
STOK SOLAR

LEVEL SOLAR PARAMETER TANK SOLAR


TGL
KONVERSI SHIFT I SHIFT II SHIFT III LEBAR PANJANG

22 100.00 1.77 3.46


23
24
25
26
27
28
OR POMPA IPA MULYAMEKAR SADANG
MINGGU III

OMPA II MOTOR POMPA III OVER LOAD


MOTOR
JUMLAH SHIFT I SHIFT II SHIFT III JUMLAH POMPA (JAM)
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
168 TOTAL 0
INDIKATOR KUALITAS AIR
IDITY METER AIR BAKU
SCM
) DISTRIBUSI (NTU)

SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III

0.07 0.46 0.46 0.27 -1.14 -1.43 -1.37


0.09 0.37 0.50 0.49 -1.58 -1.73 -1.39
0.05 0.49 0.23 0.49 -1.54 -1.09 -1.02
0.06 0.24 0.27 0.23 -1.18 -1.32 -0.96
0.07 0.47 0.24 0.45 -1.22 -1.94 -0.99
0.10 0.45 0.45 0.26 -1.31 -1.47 -1.35
0.06 0.40 0.39 0.40 -1.18 -1.26 -1.18
0.07 0.41 0.36 0.37 -1.31 -1.46 -1.18
0.38 -1.32

MAKAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE

DOSIS OPTIMUM
G2
m3 SHIFT I SHIFT II SHIFT III RATA - RATA
0.000 12.64 12.64 12.64 12.64
0.000 12.64 12.64 12.64 12.64
0.000 12.64 10.80 12.64 12.03
0.000 14.42 12.21 12.21 12.95
0.000 12.21 12.21 10.80 11.74
0.000 12.21 12.21 12.21 12.21
0.000 12.21 12.21 12.21 12.21

0.000 TOTAL RATA- RATA 12.34


KONSENTRASI ALUMUNIUM KONSENTRASI SODIUM
CHLOROHYDRATE HYPOCLORORITE JUMLAH

SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III


ACH SODIUM
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00

RATA - RATA
30.00
NGADAAN KIMIA
SODIUM HYPOCLORORITE JUMLAH
SHIFT I SHIFT II SHIFT III ACH SODIUM
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
AIR DAN LEVEL RESERVOIR

BUSI M3 LEVEL RESERVOIR

JUMLAH SHIFT I SHIFT II SHIFT III RATA -RATA

185.88 184.63 220.75 197.08


205.25 224.25 243.75 224.42
241.63 272.63 267.88 260.71
188.63 172.00 200.00 186.88
193.63 164.38 164.38 174.13
201.25 117.50 109.38 142.71
116.88 140.88 191.50 149.75

0.00 TOTAL 191

DRAIN OTOMATIS LUMPUR IPA SEDIMEN & FLOKULATOR


PELAKSANAAN DRAIN DURASI
MLAH DEBIT WAKTU DEBIT AIR KEHILANGAN
JUMLAH PIPA 15
DRAIN L/D AIR M3
SHIFT III SHIFT I SHIFT II SHIFT III (DETIK)
0 1 1 15 12.45 5,602.50
302,438 1 1 15 12.45 5,602.50
0 1 15 12.45 2,801.25
0 1 1 15 12.45 5,602.50
302,438 1 15 12.45 2,801.25
0 1 1 1 15 12.45 8,403.75
0 0 1 15 12.45 2,801.25
604,877 6 5 1
12 180 87.15 34

POWER PLN DAN GENSET


POWER GENSET

STAND STAND JAM PEMAKAIAN GENSET


TOTAL START
AWAL AKHIR
KWH GENSET
KWH KWH
START OFF JUMLAH

STOK SOLAR
HASIL PERHITUNGAN
(M3) SATUAN
JUMLAH
(LITER)
SHIFT I SHIFT II SHIFT III

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
JAM OPERASIONAL MOTOR POMPA IPA MULYAMEKA
MINGGU IV

MOTOR POMPA I MOTOR POMPA II


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III
22 8 8 8 24 8 8 8
23 8 8 8 24 8 8 8
24 8 8 8 24 8 8 8
25 8 8 8 24 8 8 8
26 8 8 8 24 8 8 8
27 8 8 8 24 8 8 8
28 8 8 8 24 8 8 8
KET. TOTAL 168 TOTAL
PRESSURE AIR DIRSTRIBUSI IN
TURBIDITY METER
KG/Cm2
(NTU) DISTRIBUSI

TGL SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II

22 4.00 4.00 4.00 4.00 0.15 0.10


23 4.00 4.00 3.75 3.92 0.31 0.28
24 4.00 2.78 2.81 3.20 0.13 0.08
25 4.00 4.00 3.18 3.73 0.06 0.10
26 4.00 3.50 4.03 3.84 0.09 0.08
27 3.90 3.63 4.00 3.84 0.13 0.13
28 4.10 4.00 4.00 4.03 0.12 0.18
0.14 0.14
TOTAL 3.79 0.14

PEMAKAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE
DOSIS PEMBUBUHAN
TGL
DOSING 1 DOSING 2
SHIFT I SHIFT II SHIFT III m3 SHIFT I SHIFT II SHIFT III
22 0.000 0.139 0.139 0.278 0.000 0.000 0.000
23 0.000 0.000 0.000 0.000 0.000 0.000 0.000
24 0.139 0.139 0.139 0.417 0.000 0.000 0.000
25 0.139 0.139 0.139 0.417 0.000 0.000 0.000
26 0.139 0.139 0.139 0.417 0.000 0.000 0.000
27 0.139 0.139 0.139 0.417 0.000 0.000 0.000
28 0.139 0.110 0.139 0.389 0.000 0.000 0.000

TOTAL 2.336 TOTAL


SODIUM HYPOCLORORITE KONSENTRASI ALUMUNI
POS CHLORINASI SISA CHLOR BEBAS CHLOROHYDRATE

TGL SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I

22 30.00
23 0.00
24 0.00
25 30.00
26 30.00
27 30.00
28 30.00
RATA-
R
RATA
PENGADAAN KIMIA
ALUMUNIUM CHLOROHYDRATE SODIUM
TGL
SHIFT I SHIFT II SHIFT III SHIFT I
22
23
24
25
26
27
28
TOTAL
PARAMETER AIR DAN LEVEL RESERVOIR

AIR BAKU M3 AIR DISTRIBUSI M3


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III

22 3,417.70 3,417.70 3,417.70 10,253.09


23 3,417.70 3,417.70 3,432.71 10,268.10
24 3,417.70 3,507.77 3,537.79 10,463.26
25 3,537.79 3,537.79 3,537.79 10,613.38
26 3,329.14 3,066.34 3,038.83 9,434.30
27 3,066.34 3,066.34 3,066.34 9,199.01
28 3,226.25 3,299.33 3,299.33 9,824.90

TOTAL 70,056.04 TOTAL

PENCUCIAN FILTER CEPAT / BACKWASH

JUMLAH FILTER DURASI JUMLAH DEBIT


DEBIT AIR
TGL WAKTU
L/D
(MENIT)
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II
22 0 2 2 0 302,438
23 0 2 0 0 302,438
24 1 2 0 151,219 302,438
25 0 0 2 22 114.56 0 0
26 0 2 0 0 302,438
27 0 2 2 0 302,438
28 0 2 0 0 302,438
1 12 6 151,219 1,814,630
TOTAL 19 418 115 2,873

PEMAKAIAN POWER PLN DAN GENSET

POWER PLN
TGL
STAND AWAL KWH STAND AKHIR KWH TOTAL
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III KWH
22 0.00
23 0.00
24 0.00
25 0.00 0
26 0.00
27 0.00
28 0.00
STOK SOLAR

LEVEL SOLAR PARAMETER TANK SOLAR


TGL
KONVERSI SHIFT I SHIFT II SHIFT III LEBAR PANJANG

22 100.00 1.77 3.46


23
24
25
26
27
28
POMPA IPA MULYAMEKAR SADANG
INGGU IV

OMPA II MOTOR POMPA III OVER LOAD


MOTOR
JUMLAH SHIFT I SHIFT II SHIFT III JUMLAH POMPA (JAM)
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
24 0 0 0 0
168 TOTAL 0
INDIKATOR KUALITAS AIR
IDITY METER AIR BAKU
SCM
) DISTRIBUSI (NTU)

SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III

0.10 0.37 0.31 0.31 -1.30 -1.37 -1.44


0.28 0.31 0.28 0.28 -1.44 -1.46 -1.34
0.08 0.32 0.37 0.37 -1.38 -1.18 -0.84
0.11 0.35 0.25 0.30 -0.74 -1.37 -1.34
0.07 0.26 0.24 0.28 -1.12 -1.03 -1.16
0.07 0.23 0.26 0.37 -1.18 -1.19 -1.21
0.25 0.28 0.38 0.25 -1.22 -1.16 -1.31
0.14 0.30 0.30 0.31 -1.20 -1.25 -1.23
0.30 -1.23

KAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE

DOSIS OPTIMUM
G2
m3 SHIFT I SHIFT II SHIFT III RATA - RATA
0.000 12.21 12.21 12.21 12.21
0.000 0.00 0.00 0.00 0.00
0.000 12.21 12.21 12.21 12.21
0.000 11.79 11.79 11.79 11.79
0.000 12.53 12.64 12.64 12.60
0.000 12.64 12.64 13.60 12.96
0.000 13.60 13.60 0.00 9.07

0.000 TOTAL RATA- RATA 10.12


KONSENTRASI ALUMUNIUM KONSENTRASI SODIUM
CHLOROHYDRATE HYPOCLORORITE JUMLAH

SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III


ACH SODIUM
30.00 0.00 30.00
0.00 0.00 0.00
30.00 30.00 15.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 30.00 30.00
30.00 0.00 30.00

RATA - RATA
23.57
ADAAN KIMIA
SODIUM HYPOCLORORITE JUMLAH
SHIFT I SHIFT II SHIFT III ACH SODIUM
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
R DAN LEVEL RESERVOIR

BUSI M3 LEVEL RESERVOIR

JUMLAH SHIFT I SHIFT II SHIFT III RATA -RATA

215.38 244.38 215.50 225.08


204.75 182.00 212.00 199.58
121.75 85.38 129.25 112.13
91.50 111.75 217.25 140.17
245.50 142.13 230.00 205.88
180.75 184.38 232.13 199.08
225.13 211.38 241.13 225.88

0.00 TOTAL 187

DRAIN OTOMATIS LUMPUR IPA SEDIMEN & FLOKULATOR


PELAKSANAAN DRAIN DURASI
MLAH DEBIT WAKTU DEBIT AIR KEHILANG
JUMLAH PIPA 15
DRAIN L/D AN AIR M3
SHIFT III SHIFT I SHIFT II SHIFT III (DETIK)
302,438 1 1 15 12.45 5,602.50
0 1 15 12.45 2,801.25
0 1 15 12.45 2,801.25
302,438 1 1 15 12.45 5,602.50
0 1 1 15 12.45 5,602.50
302,438 15 12.45 0.00
0 15 12.45 0.00
907,315 5 3 0
8 120 87.15 22

OWER PLN DAN GENSET


POWER GENSET

STAND STAND JAM PEMAKAIAN GENSET


TOTAL START
AWAL AKHIR
KWH GENSET
KWH KWH
START OFF JUMLAH

OK SOLAR
HASIL PERHITUNGAN
(M3) SATUAN
JUMLAH
(LITER)
SHIFT I SHIFT II SHIFT III

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
JAM OPERASIONAL MOTOR POMPA IPA MULYAME
MINGGU V

MOTOR POMPA I MOTOR POMPA II


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III
29 8 8 8 24 8 8 8
30 8 8 8 24 8 8 8
KET. TOTAL 48 TOTAL
PRESSURE AIR DIRSTRIBUSI
TURBIDITY METER
KG/Cm2
(NTU) DISTRIBUSI

TGL SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II

29 4.00 4.00 4.00 4.00 0.10 0.09


30 4.00 4.00 4.00 4.00 0.06 0.18
0.08 0.14
TOTAL 4.00 0.09

PEMAKAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE
DOSIS PEMBUBUHAN
TGL
DOSING 1 DOSING 2
SHIFT I SHIFT II SHIFT III m3 SHIFT I SHIFT II SHIFT III
29 0.139 0.139 0.139 0.417 0.000 0.000 0.000
30 0.139 0.139 0.139 0.417 0.000 0.000 0.000

TOTAL 0.835 TOTAL

SODIUM HYPOCLORORITE KONSENTRASI ALUMUNI


POS CHLORINASI SISA CHLOR BEBAS CHLOROHYDRATE

TGL SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I

29 30.00
30 30.00
RATA -
R
RATA
PENGADAAN KIMIA
ALUMUNIUM CHLOROHYDRATE SODIUM
TGL
SHIFT I SHIFT II SHIFT III SHIFT I
29
30
TOTAL
PARAMETER AIR DAN LEVEL RESERVOIR

AIR BAKU M3 AIR DISTRIBUSI M3


TGL
SHIFT I SHIFT II SHIFT III JUMLAH SHIFT I SHIFT II SHIFT III

29 3,299.33 3,299.33 3,299.33 9,897.98


30 3,299.33 3,299.33 3,299.33 9,897.98

TOTAL 19,795.97 TOTAL

PENCUCIAN FILTER CEPAT / BACKWASH

JUMLAH FILTER DURASI JUMLAH DEBIT


DEBIT AIR
TGL WAKTU
L/D
(MENIT)
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II
29 0 2 0 0 302,438
22 114.56
30 0 0 0 0 0
0 2 0 0 302,438
TOTAL 2 44 115 302

PEMAKAIAN POWER PLN DAN GENSET

POWER PLN
TGL
STAND AWAL KWH STAND AKHIR KWH TOTAL
SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III KWH
29 0.00
30 #REF!
STOK SOLAR

LEVEL SOLAR PARAMETER TANK SOLAR


TGL
KONVERSI SHIFT I SHIFT II SHIFT III LEBAR PANJANG

29 100.00 1.77 3.46


30
OR POMPA IPA MULYAMEKAR SADANG
MINGGU V

OMPA II MOTOR POMPA III OVER LOAD


MOTOR
JUMLAH SHIFT I SHIFT II SHIFT III JUMLAH POMPA (JAM)
24 0 0 0 0
24 0 0 0 0
48 TOTAL 0
INDIKATOR KUALITAS AIR
IDITY METER AIR BAKU
SCM
) DISTRIBUSI (NTU)

SHIFT III SHIFT I SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III

0.05 0.41 0.39 0.40 -1.30 -1.09 -1.06


0.09 0.40 0.29 0.41 -1.45 -1.88 -0.71
0.07 0.41 0.34 0.41 -1.37 -1.48 -0.88
0.38 -1.24

MAKAIAN KIMIA
ALUMUNIUM CHLOROHYDRATE

DOSIS OPTIMUM
G2
m3 SHIFT I SHIFT II SHIFT III RATA - RATA
0.000 13.60 13.60 13.60 13.60
0.000 13.60 13.60 #REF! #REF!

0.000 TOTAL RATA- RATA #REF!

KONSENTRASI ALUMUNIUM KONSENTRASI SODIUM


CHLOROHYDRATE HYPOCLORORITE JUMLAH

SHIFT II SHIFT III SHIFT I SHIFT II SHIFT III


ACH SODIUM
30.00 30.00 30.00
30.00 30.00 30.00

RATA - RATA
30.00
NGADAAN KIMIA
SODIUM HYPOCLORORITE JUMLAH
SHIFT I SHIFT II SHIFT III ACH SODIUM
0 0
0 0
0 0
AIR DAN LEVEL RESERVOIR

BUSI M3 LEVEL RESERVOIR

JUMLAH SHIFT I SHIFT II SHIFT III RATA -RATA

243.25 221.25 237.38 233.96


217.38 179.63 179.75 192.25

0.00 TOTAL 213

DRAIN OTOMATIS LUMPUR IPA SEDIMEN & FLOKULATOR

PELAKSANAAN DRAIN
DURASI
MLAH DEBIT WAKTU DEBIT AIR KEHILANGAN
JUMLAH PIPA 15 DRAIN L/D AIR M3
(DETIK)
SHIFT III SHIFT I SHIFT II SHIFT III
0 1 1 1 15 12.45 8,403.75
0 15 12.45 0.00
0 1 1 1
3 45 24.90 8

POWER PLN DAN GENSET


POWER GENSET

STAND STAND JAM PEMAKAIAN GENSET


TOTAL START
AWAL AKHIR
KWH GENSET
KWH KWH
START OFF JUMLAH

STOK SOLAR
HASIL PERHITUNGAN
(M3) JUMLAH SATUAN
(M3) (LITER)
SHIFT I SHIFT II SHIFT III

0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
LAPORAN MINGGUAN BULAN APRIL 2022
MINGGU KE I

KINERJA IPA MULYA MEKAR :

JAM OPERASI DEBIT AIR BAKU PRODUKSI AIR


SUMBER AIR
( Jam ) ( m3 ) ( m3 )
Motor Pompa I IPA Mulya Mekar 168
Motor Pompa II IPA Mulya Mekar 168 69,286 69,286
Motor Pompa III IPA Mulya Mekar 8
Jumlah Produksi Air IPA Mulyamekar 69,286

DURASI / WAKTU DEBIT AIR KEHILANGAN AIR


KEHILANGAN PROD AIR
( Jam ) ( L / dtk ) ( m3 )
Pencucian Filter Cepat (Backwash) 5.00 114.56 2,062
Drain NTU & SCM 168 0.016 9.68
Drain Pembuangan Lumpur Sedimentasi & Flokulasi 0.058 12.45 39
Pencucian Bak RWR
Pengurasan IPA
Kebutuhan Instalasi 80
Kebutuhan Lain - Lain 70
Jumlah Kehilangan Air IPA Mulyamekar 2,261
Jumlah Total Kehilangan Air 2,261
TOTAL AIR YANG DIDISTRIBUSIKAN 67,025

Kinerja IPA Mulya Mekar


Uraian Nilai Parameter Satuan
Level reservoir (rata-rata) 173 Cm
Pressure air distribusi (rata-rata) 3.9 Kg/Cm2
Jumlah pencucian filter (back wash) 15 Unit
Kekeruhan air distribusi 0.10 NTU
kekeruhan air baku 0.42 NTU
SCM meter -1.39 SCM

Dosis Pembubuhan ACH ( Alumunium Chlorohydrate ) 2.25 m3

Dosis Optimum 10.81 ppm


Pos Chlorinasi 0.00 ppm
Sisa Chlor Bebas 0.00 mg/L
Konsentrasi ACH ( Alumunium Chlorohydrate ) 29 %
Konsentrasi Sodium Hypoclororite 0.00 %

LAPORAN MINGGUAN BULAN APRIL 2022


MINGGU KE I
TINGKAT EFISIENSI :
PEMAKAIAN STAND AWAL STAND AKHIR PEMAKAIAN
TENAGA LISTRIK ( KwH ) ( KwH ) ( KwH )
IPA Mulya Mekar
Listrik PLN 0
Listrik Genset
PEMAKAIAN GENSET :
PEMANASAN MESIN GENSET JAM BEROPRASI
Starting genset : 148 1 X Start 0.25 JAM
PEMAKAIAN BAHAN KIMIA & SOLAR

SATUAN SATUAN
PEMAKAIAN BAHAN KIMIA (Kg) (Liter)

Alumunium chlorohydrate (ACH)


Pengadaan
sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok murni
sodium hypoclororite
Pembuatan Alumunium chlorohydrate (ACH)
pengenceran sodium hypoclororite
Pengenceran Alumunium chlorohydrate (ACH) 2,250
terpakai sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok pengenceran
sodium hypoclororite

SOLAR
PEMAKAIAN BAHAN BAKAR
( Liter ) / Cm
Terpakai 0
Stok 0

Purwakarta, 07 April 2022

Mengetahui : Dibuat Oleh :


Kepala Bagian Produksi & Sumber Air Kasie WTP Mulya Mekar

VITA AGUSTIANTI. S.Si DEDE KARTIKA


NIK : 12206 NIK : 12229
LAPORAN MINGGUAN BULAN APRIL 2022
MINGGU KE II

KINERJA IPA MULYA MEKAR :

JAM OPERASI DEBIT AIR BAKU PRODUKSI AIR


SUMBER AIR
( Jam ) ( m3 ) ( m3 )
Motor Pompa I IPA Mulya Mekar 168
Motor Pompa II IPA Mulya Mekar 168 67,489 67,489
Motor Pompa III IPA Mulya Mekar 0
Jumlah Produksi Air IPA Mulyamekar 67,489

DURASI / WAKTU DEBIT AIR KEHILANGAN AIR


KEHILANGAN PROD AIR
( Jam ) ( L / dtk ) ( m3 )
Pencucian Filter Cepat (Backwash) 6.60 114.56 2,722
Drain NTU & SCM 168 0.016 9.68
Drain Pembuangan Lumpur Sedimentasi & Flokulasi 0.042 12.45 28
Pencucian Bak RWR
Pengurasan IPA
Kebutuhan Instalasi 80
Kebutuhan Lain - Lain 70
Jumlah Kehilangan Air IPA Mulyamekar 2,910
Jumlah Total Kehilangan Air 2,910
TOTAL AIR YANG DIDISTRIBUSIKAN 64,579

Kinerja IPA Mulya Mekar


Uraian Nilai Parameter Satuan
Level reservoir (rata-rata) 179 Cm
Pressure air distribusi (rata-rata) 3.8 Kg/Cm2
Jumlah pencucian filter (back wash) 18 Unit
Kekeruhan air distribusi 0.12 NTU
kekeruhan air baku 0.46 NTU
SCM meter -1.20 SCM

Dosis Pembubuhan ACH ( Alumunium Chlorohydrate ) 2.87 m3

Dosis Optimum 11.97 ppm


Pos Chlorinasi 0.00 ppm
Sisa Chlor Bebas 0.00 mg/L
Konsentrasi ACH ( Alumunium Chlorohydrate ) 30.00 %
Konsentrasi Sodium Hypoclororite 0.00 %

LAPORAN MINGGUAN BULAN APRIL 2022


MINGGU KE II
TINGKAT EFISIENSI :
PEMAKAIAN STAND AWAL STAND AKHIR PEMAKAIAN
TENAGA LISTRIK ( KwH ) ( KwH ) ( KwH )
IPA Mulya Mekar
Listrik PLN 0
Listrik Genset
PEMAKAIAN GENSET :
PEMANASAN MESIN GENSET JAM BEROPRASI
Starting genset : 149 1 X Start 0.25 JAM
PEMAKAIAN BAHAN KIMIA & SOLAR

SATUAN SATUAN
PEMAKAIAN BAHAN KIMIA (Kg) (Liter)

Alumunium chlorohydrate (ACH)


Pengadaan
sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok murni
sodium hypoclororite
Pembuatan Alumunium chlorohydrate (ACH)
pengenceran sodium hypoclororite
Pengenceran Alumunium chlorohydrate (ACH) 2,873
terpakai sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok pengenceran
sodium hypoclororite

SOLAR
PEMAKAIAN BAHAN BAKAR
( Liter ) / Cm
Terpakai 0
Stok 0

Purwakarta, 14 April 2022

Mengetahui : Dibuat Oleh :


Kepala Bagian Produksi & Sumber Air Kasie WTP Mulya Mekar

VITA AGUSTIANTI. S.Si DEDE KARTIKA


NIK : 12206 NIK : 12229
LAPORAN MINGGUAN BULAN APRIL 2022
MINGGU KE III

KINERJA IPA MULYA MEKAR :

JAM OPERASI DEBIT AIR BAKU PRODUKSI AIR


SUMBER AIR
( Jam ) ( m3 ) ( m3 )
Motor Pompa I IPA Mulya Mekar 168
Motor Pompa II IPA Mulya Mekar 168 69,710 69,710
Motor Pompa III IPA Mulya Mekar 0
Jumlah Produksi Air IPA Mulyamekar 69,710

DURASI / WAKTU DEBIT AIR KEHILANGAN AIR


KEHILANGAN PROD AIR
( Jam ) ( L / dtk ) ( m3 )
Pencucian Filter Cepat (Backwash) 4.03 114.56 1,663
Drain NTU & SCM 168 0.016 9.68
Drain Pembuangan Lumpur Sedimentasi & Flokulasi 0.050 12.45 34
Pencucian Bak RWR
Pengurasan IPA
Kebutuhan Instalasi 80
Kebutuhan Lain - Lain 70
Jumlah Kehilangan Air IPA Mulyamekar 1,857
Jumlah Total Kehilangan Air 1,857
TOTAL AIR YANG DIDISTRIBUSIKAN 67,853

Kinerja IPA Mulya Mekar


Uraian Nilai Parameter Satuan
Level reservoir (rata-rata) 191 Cm
Pressure air distribusi (rata-rata) 3.9 Kg/Cm2
Jumlah pencucian filter (back wash) 11 Unit
Kekeruhan air distribusi 0.09 NTU
kekeruhan air baku 0.38 NTU
SCM meter -1.32 SCM

Dosis Pembubuhan ACH ( Alumunium Chlorohydrate ) 2.85 m3

Dosis Optimum 12.34 ppm


Pos Chlorinasi 0.00 ppm
Sisa Chlor Bebas 0 mg/L
Konsentrasi Alumunium Chlorohydrate 30.00 %
Konsentrasi Sodium Hypoclororite 0.00 %

LAPORAN MINGGUAN BULAN APRIL 2022


MINGGU KE III
TINGKAT EFISIENSI :
PEMAKAIAN STAND AWAL STAND AKHIR PEMAKAIAN
TENAGA LISTRIK ( KwH ) ( KwH ) ( KwH )
IPA Mulya Mekar
Listrik PLN 0.000 0
Listrik Genset
PEMAKAIAN GENSET :
PEMANASAN MESIN GENSET JAM BEROPRASI
Starting genset : 150 1 X Start 0.25 JAM
PEMAKAIAN BAHAN KIMIA & SOLAR

SATUAN SATUAN
PEMAKAIAN BAHAN KIMIA (Kg) (Liter)

Alumunium chlorohydrate (ACH)


Pengadaan
sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok murni
sodium hypoclororite
Pembuatan Alumunium chlorohydrate (ACH)
pengenceran sodium hypoclororite
Pengenceran Alumunium chlorohydrate (ACH) 2,851
terpakai sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok pengenceran
sodium hypoclororite

SOLAR
PEMAKAIAN BAHAN BAKAR
( Liter ) / Cm
Terpakai 0
Stok 0

Purwakarta, 21 April 2022

Mengetahui : Dibuat Oleh :


Kepala Bagian Produksi & Sumber Air Kasie WTP Mulya Mekar

VITA AGUSTIANTI. S.Si DEDE KARTIKA


NIK : 12206 NIK : 12229
LAPORAN MINGGUAN BULAN APRIL 2022
MINGGU KE IV

KINERJA IPA MULYA MEKAR :

JAM OPERASI DEBIT AIR BAKU PRODUKSI AIR


SUMBER AIR
( Jam ) ( m3 ) ( m3 )
Motor Pompa I IPA Mulya Mekar 168
Motor Pompa II IPA Mulya Mekar 168 70,056 70,056
Motor Pompa III IPA Mulya Mekar 0
Jumlah Produksi Air IPA Mulyamekar 70,056

DURASI / WAKTU DEBIT AIR KEHILANGAN AIR


KEHILANGAN PROD AIR
( Jam ) ( L / dtk ) ( m3 )
Pencucian Filter Cepat (Backwash) 6.97 114.56 2,873
Drain NTU & SCM 168 0.016 9.68
Drain Pembuangan Lumpur Sedimentasi & Flokulasi 0.033 12.45 22
Pencucian Bak RWR
Pengurasan IPA
Kebutuhan Instalasi 80
Kebutuhan Lain - Lain 70
Jumlah Kehilangan Air IPA Mulyamekar 3,055
Jumlah Total Kehilangan Air 3,055
TOTAL AIR YANG DIDISTRIBUSIKAN 67,001

Kinerja IPA Mulya Mekar


Uraian Nilai Parameter Satuan
Level reservoir (rata-rata) 187 Cm
Pressure air distribusi (rata-rata) 3.8 Kg/Cm2
Jumlah pencucian filter (back wash) 19 Unit
Kekeruhan air distribusi 0.14 NTU
kekeruhan air baku 0.30 NTU
SCM meter -1.23 SCM

Dosis Pembubuhan ACH ( Alumunium Chlorohydrate ) 2.34 m3

Dosis Optimum 10.12 ppm


Pos Chlorinasi 0.00 ppm
Sisa Chlor Bebas 0 mg/L
Konsentrasi Alumunium Chlorohydrate 23.57 %
Konsentrasi Sodium Hypoclororite 0.00 %

LAPORAN MINGGUAN BULAN APRIL 2022


MINGGU KE IV
TINGKAT EFISIENSI :
PEMAKAIAN STAND AWAL STAND AKHIR PEMAKAIAN
TENAGA LISTRIK ( KwH ) ( KwH ) ( KwH )
IPA Mulya Mekar
Listrik PLN 0
Listrik Genset
PEMAKAIAN GENSET :
PEMANASAN MESIN GENSET JAM BEROPRASI
Starting genset : 151 1 X Start 0.25 JAM
PEMAKAIAN BAHAN KIMIA & SOLAR

SATUAN SATUAN
PEMAKAIAN BAHAN KIMIA (Kg) (Liter)

Alumunium chlorohydrate (ACH)


Pengadaan
sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok murni
sodium hypoclororite
Pembuatan Alumunium chlorohydrate (ACH)
pengenceran sodium hypoclororite
Pengenceran Alumunium chlorohydrate (ACH) 2,336
terpakai sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok pengenceran
sodium hypoclororite

SOLAR
PEMAKAIAN BAHAN BAKAR
( Liter ) / Cm
Terpakai 0
Stok 0

Purwakarta, 28 April 2022

Mengetahui : Dibuat Oleh :


Kepala Bagian Produksi & Sumber Air Kasie WTP Mulya Mekar

VITA AGUSTIANTI. S.Si DEDE KARTIKA


NIK : 12206 NIK : 12229
LAPORAN MINGGUAN BULAN APRIL 2022
MINGGU KE V

KINERJA IPA MULYA MEKAR :

JAM OPERASI DEBIT AIR BAKU PRODUKSI AIR


SUMBER AIR
( Jam ) ( m3 ) ( m3 )
Motor Pompa I IPA Mulya Mekar 48
Motor Pompa II IPA Mulya Mekar 48 19,796 19,796
Motor Pompa III IPA Mulya Mekar 0
Jumlah Produksi Air IPA Mulyamekar 19,796

DURASI / WAKTU DEBIT AIR KEHILANGAN AIR


KEHILANGAN PROD AIR
( Jam ) ( L / dtk ) ( m3 )
Pencucian Filter Cepat (Backwash) 0.73 114.56 302
Drain NTU & SCM 72 0.016 4.15
Drain Pembuangan Lumpur Sedimentasi & Flokulasi 0.013 12.45 8
Pencucian Bak RWR
Pengurasan IPA
Kebutuhan Instalasi 80
Kebutuhan Lain - Lain 70
Jumlah Kehilangan Air IPA Mulyamekar 465
Jumlah Total Kehilangan Air 465
TOTAL AIR YANG DIDISTRIBUSIKAN 19,331

Kinerja IPA Mulya Mekar


Uraian Nilai Parameter Satuan
Level reservoir (rata-rata) 213 Cm
Pressure air distribusi (rata-rata) 4.0 Kg/Cm2
Jumlah pencucian filter (back wash) 2 Unit
Kekeruhan air distribusi 0.09 NTU
kekeruhan air baku 0.38 NTU
SCM meter -1.24 SCM

Dosis Pembubuhan ACH ( Alumunium Chlorohydrate ) 0.83 m3

Dosis Optimum #REF! ppm


Pos Chlorinasi 0.00 ppm
Sisa Chlor Bebas 0 mg/L
Konsentrasi Alumunium Chlorohydrate 30.00 %
Konsentrasi Sodium Hypoclororite 0.00 %

LAPORAN MINGGUAN BULAN APRIL 2022


MINGGU KE V
TINGKAT EFISIENSI :
PEMAKAIAN STAND AWAL STAND AKHIR PEMAKAIAN
TENAGA LISTRIK ( KwH ) ( KwH ) ( KwH )
IPA Mulya Mekar
Listrik PLN 0
Listrik Genset
PEMAKAIAN GENSET :
PEMANASAN MESIN GENSET JAM BEROPRASI
Starting genset : 151 1 X Start 0 JAM
PEMAKAIAN BAHAN KIMIA & SOLAR

SATUAN SATUAN
PEMAKAIAN BAHAN KIMIA (Kg) (Liter)

Alumunium chlorohydrate (ACH)


Pengadaan
sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok murni
sodium hypoclororite
Pembuatan Alumunium chlorohydrate (ACH)
pengenceran sodium hypoclororite
Pengenceran Alumunium chlorohydrate (ACH) 835
terpakai sodium hypoclororite
Alumunium chlorohydrate (ACH)
Stok pengenceran
sodium hypoclororite

SOLAR
PEMAKAIAN BAHAN BAKAR
( Liter ) / Cm
Terpakai 0
Stok 0

Purwakarta, 30 April 2022

Mengetahui : Dibuat Oleh :


Kepala Bagian Produksi & Sumber Air Kasie WTP Mulya Mekar

VITA AGUSTIANTI. S.Si DEDE KARTIKA


NIK : 12206 NIK : 12229
LAPORAN KINERJA IPA BULAN APRIL 2022
KETERANGAN :
LOKASI : IPA MULYA MEKAR
Minggu V rekap data hanya tanggal 29 s/d 31

No URAIAN DATA
1 KINERJA MOTOR POMPA DISTRIBUSI

POMPA DISTRIBUSI MINGGU


JUMLAH JAM BEROPRASI
JAM OPERASI I II III IV V
Motor pompa I 168 168 168 168 48 720 JAM
Motor pompa II 168 168 168 168 48 720 JAM
Motor pompa III 8 0 0 0 0 8 JAM
TOTAL JAM MOTOR POMPA BEROPRASI 1,448 JAM

2 KEHILANGAN PRODUKSI AIR

KEHILANGAN MINGGU
JUMLAH SATUAN
PRODUKSI AIR I II III IV V
Pencucian filter cepat (Back wash) 2062 2722 1663 2873 302 9,623 M3
Drain pembuangan lumpur IPA 39.22 28.01 33.62 22.41 8.40 131.66 M3
Drain turbidity meter & SCM 9.68 9.68 9.68 9.68 4.15 42.85 M3
Pencucian bak RWR - -
Pengurasan IPA - -
Kebutuhan instalasi 80 80 80 80 80 400 M3
Kebutuhan lain - lain 70 70 70 70 70 350 M3
TOTAL KEHILANGAN AIR 10,548 M3

3 VOLUME AIR DISTRIBUSI

MINGGU
URAIAN JUMLAH SATUAN
I II III IV V
Produksi Air 69,286 67,489 69,710 70,056 19,796 296,336 M3
Kehilangan produksi air 2,261 2,910 1,857 3,055 465 10,548 M3
Air yang didistribusikan 67,025 64,579 67,853 67,001 19,331 285,789 M3
TOTAL AIR DISTRIBUSI 285,789 M3

4 KINERJA INSTALASI PENGOLAHAN AIR (IPA)

MINGGU
URAIAN JUMLAH SATUAN
I II III IV V
Level reservoir (rata-rata) 173 179 191 187 213 - Cm
Aktivitas backwash filter IPA 15 18 11 19 2 65 Unit
Pressure air distribusi (rata-rata) 3.9 3.8 3.9 3.8 4.0 - Kg/Cm2
Kekeruhan air distribusi 0.10 0.12 0.09 0.14 0.09 - NTU
kekeruhan air baku 0.42 0.46 0.38 0.30 0.38 - NTU
SCM meter -1.39 -1.20 -1.32 -1.23 -1.24 - SCM
Dosis pembubuhan alumunium chlorohydrate (ACH) 2.25 2.87 2.85 2.34 0.83 11.15 M3
Dosis optimum alumunium chlorohydrate (ACH) 12.16 11.71 11.78 11.57 12.67 - ppm
Pos chlorinasi 0 0 0 0 0 - ppm
Sisa chlor bebas 0 0 0 0 0 - mg/L
Konsentrasi alumunium chlorohydrate (ACH) 28.57 30.00 30.00 23.57 30.00 - %
Konsentrasi sodium hypoclororite 0 0 0 0 0 - %
5 PEMAKAIAN KIMIA UNTUK PRODUKSI

MINGGU
URAIAN JUMLAH SATUAN
I II III IV V
Alumunium chlorohydrate (ACH) Liter
Pengadaan
sodium hypoclororite Liter

Pengenceran Alumunium chlorohydrate (ACH) 2,250 2,873 2,851 2,336 835 11,145 Liter
terpakai sodium hypoclororite Liter
6 PEMAKAIAN POWER UNTUK OPRASIONAL
MINGGU
URAIAN JUMLAH SATUAN
I II III IV V
PLN 0 0 0 0 0 0 KWh
GENSET 0 0 0 0 0 0 KWh
Starting genset 148 149 150 151 151 749.00 1 X Start
Jam pemakaian genset 0.25 0.25 0.25 0.25 0.00 1.00 JAM
Level solar 0 0 0 0 0 0 Liter

Purwakarta, 30 April 2022

Dibuat Oleh :
Mengetahui : Kasie IPA Mulya Mekar
Kepala Bagian Produksi & Sumber Air

VITA AGUSTIANTI. S.Si DEDE KARTIKA


NIK : 12206 NIK : 12229
GRAFIK KINERJA IPA MULYAMEKAR BULAN APRIL 2022
KETERANGAN :
LOKASI : IPA MULYA MEKAR
Minggu V rekap data hanya tanggal 29 s/d 31

180 KINERJA MOTOR POMPA DISTRIBUSI AIR DEBIT DISTRIBUSI AIR


168 168 168 168 168 168 168 168 80,000

160
70,000 67,025 67,853 67,001
64,579

DEBIT DISTRIBUSI AIR / M3


140
60,000
120
JAM BEROPRASI

50,000
100

80 40,000

60 30,000
48 48
40 19,331
20,000

20
8 10,000
0 0 0 0
0
I II III IV V
0
POMPA I POMPA II POMPA III I II III IV V

SKALA KEKERUHAN AIR BAKU (NTU) SKALA KEKERUHAN AIR DISTRIBUSI (NTU)
0.50 0.16
0.46
0.45 0.42 0.14
0.14
0.40 0.38 0.38
0.12 0.12
0.35
0.10

SCALE Ntu
0.30
0.30 0.10 0.09
SCALE NTU

0.09
0.25 0.08

0.20
0.06
0.15
0.04
0.10

0.05 0.02

0.00
I II III IV V 0.00
I II III IV V

PARAMETER SCM RATA-RATA PRESSURE AIR DISTRIBUSI


-1.10
I II III IV V
Kg/Cm2
4.2

-1.15

-1.20
-1.20
-1.23
-1.24
kG/CM2
scale scm

-1.25 4.0

4.0
-1.30 -1.32 3.9

-1.35 3.9
3.8
-1.39
-1.40 3.8
3.8

-1.45

3.6
I II III IV V
-1.45

3.6
I II III IV V

DOSIS PEMBUBUHAN ACH RATA-RATA LEVEL RESERVOIR


3.50 250

3.00 2.87 2.85


200 191 187 213
179
2.50 173
2.34
2.25

150
2.00

CM
M3

1.50
100

1.00
0.83

50
0.50

0.00
0
I II III IV V I II III IV V

Purwakarta, 30 April 2022

Mengetahui : Dibuat Oleh :


Kepala Bagian Produksi & Sumber Air Kasie IPA Mulya Mekar

VITA AGUSTIANTI. S.Si DEDE KARTIKA


NIK : 12206 NIK : 12229