Integrated Bus Terminal

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

D:\Jenelle\Switodesigns\SD_Download\1 (2).jpg D:\Jenelle\Switodesigns\SD_Download\2 (1).

jpg

COMMERCI A L BUILDING EXTERIO R PERSPECTIVE BUS TERMINAL BUILDING EXTERIOR PERSPECTIVE

S
S

SE
SW
SE
SW
W E
W E

NW

NE
NW

B U S L O A D I N G D O C K
NE

035
15.

1 2 3 4 5 6 7

E M P L O Y E E ' S P A R K I N G A R E A

B US TER M I NA L BU I LD I NG

P A S S A G E
Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
C O M M E R C I A L B U I L D I N G
Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
14.000
Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
P A R K I N G A R E A

BUS EXI T BUS ENTRY

S I T E D E V E L O P M E N T P L A N L O C A T I O N M A P

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG E X T ER I OR PE R SP E CT I V E
D:\Jenelle\Switodesigns\SD_Download\Logo_MILG (2).png D:\Jenelle\Switodesigns\switodesjpg.JPG
INTEGRATED BUS TERMINAL S ITE DEVELOPMENT PLA N A
AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO L O C A T I O N M A P
01 10
ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER T A B L E O F C O N T E N T S
LOCATION:
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
67.867
5.000 3.300 20.000 2.000 17.610 19.956

LOCATION:
PROJECT TITLE:

INTEGRATED BUS TERMINAL


PROPOSED PICONG
14.000

BUS EXIT

BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO


PREPARED BY:
P
Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
A
1

Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
ARCHITECT CONSULTANT
R
P

K
A
2

AR. GLORYROSE DY METILLA


S

I
A
G
B

N
U

Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
B U S

S I T E
G
S

CHECKED BY:
T E R M I N A L
L

A
O

B U I L D I N G

ABIBAZAR W. SALI
R
A

E
5
D
I

PROJECT DEVELOPMENT OFFICER V


N

PROJECT DEVELOPMENT MANAGEMENT DIVISION


Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
6

C O M M E R C I A L
G
D

B U I L D I N G
7
O
C

OIC DIRECTOR II
K

RECOMMEND APPROVAL:
D E V E L O P M E N T

FAUSIAH R. ABDULA
E M P L O Y E E ' S

S C A L E :

OPERATION MANAGEMENT SERVICE


P A R K I N G

Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
A R E A

Ramírez.
Suárez
Hugo
Arq.
de
Ramos.P.
Espitia
Francisco
Arq.
de
Arguelles.P.
Romero
A.
Adrian
Arq.
de
Hernández.P.
Guerrero
Enrique
Arq.
de
P.
1 : 2 0 0
P L A N

MINISTER
15.

APPROVED BY:
035

BUS ENTRY

ATTY. NAGUIB G. SINARIMBO


MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
S I T E
SHEET CONTENT :

5.000 3.300 20.000 8.500 31.067


67.867
D E V E L O P M E N T
P L A N

02
A
10
SHEET NO.:
44.000
6.500 6.500 7.400 3.200 7.400 6.500 6.500

COMMERCIAL
8.500

8.500
S P A C E 4
4.537

L A N D S C A P E

COMMERCIAL C O U R T Y A R D COMMERCIAL

13.500
S P A C E 1 S P A C E 3
5.286

14.6

90
14.6

19.000
90

3.000
3.748

COMMERCIAL PASALUBONG
S P A C E 2 C E N T E R

TICKETING
BOOTH

5.500
5.429

00
2.0
BUILDING ENTRANCE

10. 15
815 8
10.

11.278

G ROUND FLO O R COMMERCI A L BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG GROUND FLOOR PLAN COMMERCIAL BUILDING

INTEGRATED BUS TERMINAL A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 03 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
39.600
0.900
4.200 4.200 4.200 4.200 4.200 4.200 4.200 4.200 1.700 3.400

C O N C O U R S E
7.300

7.300
W A I T I N G A R E A
17.600

17.600
DISPATCH WOMEN'S
5.150

5.150
O F F I C E BAGGAGE RESTROOM
COUNTER
CHARGING
S T A T I O N
10.300

10.300
2.000
1.850
EMPLOYEE'S
LOCKER ROOM /
RESTROOM 2.000 A D M I N
O F F I C E
5.150

5.150
SHO. TOI. M E N ' S
STORAGE SLEEPING RESTROOM
R O O M Q U A R T E R
SHO. TOI.
1.875

5.000 2.275 2.025 2.000 2.200 4.200 4.200 4.211 8.298 5.200

39.600

G ROUND FLOO R BUS TERMI N AL BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG GROUND FLOOR PLAN BUS TERMINAL BUILDING

INTEGRATED BUS TERMINAL A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 04 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
39.600
0.900
4.200 4.200 4.200 4.200 4.200 4.200 4.200 4.200 1.690 3.410

1.650

C O N C O U R S E
7.300

7.300
5.650

W A I T I N G A R E A
17.600

17.600
DISPATCH WOMEN'S
5.150

5.150
O F F I C E BAGGAGE RESTROOM
COUNTER
CHARGING
P A S S A G E

P A S S A G E
S T A T I O N
10.300

10.300
2.000
1.800

EMPLOYEE'S
LOCKER ROOM /
RESTROOM A D M I N
O F F I C E
5.150

5.150
SHO. TOI. M E N ' S
STORAGE SLEEPING RESTROOM
R O O M Q U A R T E R
SHO. TOI.
1.875 2.000

UP UP UP

UP

5.000 2.275 2.025 2.000 2.200 8.400 4.300 820.000 5.200

39.600

GROUND FLOOR TERMINAL BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG GROUND FLOOR PLAN TERMINAL BUILDING

INTEGRATED BUS TERMINAL A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 04 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
3.000 6.500 6.500 7.400 3.200 7.400 6.500 6.500
0.500
6.700
3.700
3.000
0.20

FRONT ELEVATION COMMERCIAL BUILDING


S C A L E : 1 : 1 0 0

5.429 3.748 5.286 4.537 8.500


3.000
0.500
6.700
3.700
3.000
0.20

RIGHT SI D E ELEVATIO N COMMERCIA L BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG E L E V A T I O N

INTEGRATED BUS TERMINAL FRONT ELEVATION COMMERCIAL BUILDING A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO RIGHT SIDE ELEVATI O N COMMERCIAL BUILDING
05 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
8.500 4.537 5.286 3.748 5.429
3.000
0.500
6.700
3.700
3.000
0.20

LEFT SIDE E LEVATION COMMERCIAL B U ILDING


S C A L E : 1 : 1 0 0

6.500 6.500 7.400 3.200 7.400 6.500 6.500


3.000
0.500
6.700
3.700
3.000
0.20

REA R ELEVATION C OMMERCIAL B UILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG E L E V A T I O N

INTEGRATED BUS TERMINAL LEFT SIDE ELEVATION COMMERCIAL BUILDING A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO REAR ELEVATION COMMERCIAL BUILDING
06 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
0.900
3.410 1.690 4.200 4.200 4.200 4.200 4.200 4.200 4.200 4.200

3.500
6.500
0.30 2.700

FRONT ELEVATION BUS TERMINAL BUILDING


S C A L E : 1 : 1 0 0

1.650 5.650 5.150 5.150


3.500
6.500
0.30 2.700

RIGHT SIDE ELEVATION BUS TERMINAL BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG E L E V A T I O N

INTEGRATED BUS TERMINAL FRONT ELEVATION BUS TERMINAL BUILDING A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO RIGHT SIDE ELEVATIO N BUS TERMINAL BUILDING
07 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
5.150 5.150 5.650 1.650
3.500
6.500
0.30 2.700

LEFT SIDE ELEV A TION BUS TE R MINAL BUILD I NG


S C A L E : 1 : 1 0 0

0.900
4.200 4.200 4.200 4.200 4.200 4.200 4.200 4.200 1.690 3.410
3.500
6.500
0.30 2.700

REAR ELEVATION BUS TERMINAL BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG E L E V A T I O N

INTEGRATED BUS TERMINAL LEFT SIDE E LEVATION BUS TERMINAL BUILDING A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO REAR ELEVATION BUS TERMINAL BUILDING
08 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
6.500 6.500 7.400 3.200 7.400 6.500 6.500
3.000
0.500
6.700
3.700
3.000
0.20

SECTION TH R U 'X' COMME R CIAL BUILDI N G


S C A L E : 1 : 1 0 0

8.500 4.537 5.286 3.748 5.429


3.000
0.500
6.700
3.700
3.000
0.20

SECTION THRU 'Y' COMMERCIAL BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG S E C T I O N
INTEGRATED BUS TERMINAL SECTION THRU 'X' COMMERCIAL BUILDING A
AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO SECTION THRU 'Y' COMMERCIAL BUILDING
09 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
0.900
4.200 4.200 4.200 4.200 4.200 4.200 4.200 4.200 1.690 3.410

3.500
6.500
0.30 2.700

SECTION THRU 'X' BUS TERMINAL BUILDING


S C A L E : 1 : 1 0 0

1.650 5.650 5.150 5.150


3.500
6.500
0.30 2.700

SECTIO N THRU 'Y' B U S TERMINAL BUILDING


S C A L E : 1 : 1 0 0

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG S E C T I O N

INTEGRATED BUS TERMINAL SECTION THRU 'X' BUS TERMINAL BUILDING A


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO SECTION THRU 'Y' BUS TERMINAL BUILDING
10 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
44.000

6.500 6.500 7.400 3.200 7.400 6.500 6.500

8.500
4.537
27.500
5.286
3.748
5.429

F O U N D A T I O N P L A N

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG COMMERCIAL BUILDING

INTEGRATED BUS TERMINAL GROUND FLOOR FRAMING PLAN S


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 03 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
39.600

0.900 4.200 4.200 4.200 4.200 4.200 4.200 4.200 4.200 1.690 3.410

1.650
5.650

PLANTED COLUMN
17.600
5.150
5.150

UP UP

TERMINAL BUILDING
F O U N D A T I O N P L A N

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG TERMINAL BUILDING

INTEGRATED BUS TERMINAL GROUND FLOOR FRAMING PLAN S


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 02 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
44.000

6.500 6.500 7.400 3.200 7.400 6.500 6.500

8.500
4.537
27.500

5.286
3.748
5.429

COMMERCIAL BUILDING
R O O F D E C K F R A M I N G P L A N

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG COMMERCIAL BUILDING

INTEGRATED BUS TERMINAL ROOF DECK FRAMING PLAN S


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 03 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
39.600

0.900 4.200 4.200 4.200 4.200 4.200 4.200 4.200 4.200 1.690 3.410

1.650
5.650
17.600

5.150
5.150

TERMINAL BUILDING
R O O F D E C K F R A M I N G P L A N

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG TERMINAL BUILDING

INTEGRATED BUS TERMINAL ROOF DECK FRAMING PLAN S


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 04 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
SLAB SCHEDULE SCHEDULE OF BEAMS COLUMN SCHEDULE
REINFORCEMENTS (NO. OF PIECES)
REINFORCEMENTS DIMENSION
MAIN
SPACING TERMINAL BUILDING/
BEAM REBAR LEFT SUPPORT MID-SPAN RIGHT SUPPORT
BxD OF REMARKS
PARALLEL TO SHORT SPAN PARALLEL TO LONG SPAN
MARK (mm x mm)
DIAMETER
(mm) TOP BOTTOM TOP BOTTOM TOP BOTTOM STIRRUPS COMMERCIAL BUILDING
THICKNESS REMARKS BARS BARS BARS BARS BARS BARS
MARK
(mm) TOP BARS @ SUPPORTS TOP BARS @ SUPPORTS
BOTTOM BARS BOTTOM BARS COMMERCIAL BUILDING GROUND FLOOR BEAMS
DISCONTINUOUS CONTINUOUS @ MID-SPANS DISCONTINUOUS CONTINUOUS @ MID-SPANS
EDGE EDGE EDGE EDGE CBB-1 300 x 500 20 4 2 2 5 5 2 2 @ 50; REST @ 250 INVERTED
CBB-2 300 x 500 20 8 2 4 8 8 2 2 @ 50; REST @ 250 INVERTED
CBB-3 300 x 500 20 4 2 2 5 5 2 2 @ 50; REST @ 250
S-1 CBB-4 300 x 600 20 4 2 8 2 8 2 2 @ 50; REST @ 250
CBB-5 300 x 500 20 4 2 2 5 6 2 2 @ 50; REST @ 250 C-1
CBB-6 200 x 500 16 4 2 2 5 6 2 2 @ 50; REST @ 250
S-2 CBB-7 300 x 600 20 4 2 2 3 5 2 2 @ 50; REST @ 250
CBB-8 300 x 500 20 4 2 2 3 4 2 2 @ 50; REST @ 250
CBB-9 300 x 600 20 4 2 2 3 5 2 2 @ 50; REST @ 250
CBB-10 300 x 500 20 8 2 4 8 8 2 2 @ 50; REST @ 250
S-3 CBB-11 200 x 500 16 2 2 2 5 2 2 2 @ 50; REST @ 250
CBB-12 200 x 500 16 2 2 2 5 2 2 2 @ 50; REST @ 250
CBB-13 300 x 500 20 5 2 2 3 4 2 2 @ 50; REST @ 250
S-4 CBB-14 200 x 500 20 4 2 2 4 5 2 2 @ 50; REST @ 250

TERMINAL BUILDING GROUND FLOOR BEAMS

S-5
TBB-1 400 x 500 25 5 2 7 3 10 3 2 @ 50; REST @ 250
TBB-2 200 x 500 16 4 2 4 2 4 2 2 @ 50; REST @ 250
TBB-3 300 x 500 20 8 2 4 8 8 2 2 @ 50; REST @ 250 INVERTED
S-6 TBB-4 300 x 500 20 5 2 2 5 4 2 2 @ 50; REST @ 250 INVERTED
TBB-5 300 x 500 20 4 2 2 5 5 2 2 @ 50; REST @ 250
TBB-6 200 x 500 20 5 2 2 4 5 2 2 @ 50; REST @ 250 C-2
S-7 RCWB = REINFORCED CONCRETE WALL BELOW
MC = MID-SPAN CAMBER

S-8

500 mm
L
S-9 300mm

S - 10

500mm
C-3

footing tie-beam detail, ftb-1

schedule of footings
C-4

THICKNESS (mm) SIZE (mm) BOTTOM REINFORCEMENTS D


(mm)
MARK BAR ' S ' BAR ' L ' (VERIFY) REMARKS
T1 T2 WIDTH LENGTH RECKONED FROM
(PARALLEL TO SHORT) (PARALLEL TO LONG) (EXISTING GRADE)

F-1 350 550 2200 2200 16 - 16mm ∅ 16 - 16mm ∅ VERIFY CENTER FOOTING

F-2 300 300 1100 1100 6 - 16mm ∅ 6 - 16mm ∅ VERIFY CENTER FOOTING

F-3 300 500 1600 1600 12 - 16mm ∅ 12 - 16mm ∅ VERIFY CENTER FOOTING

F-4 300 500 1500 1500 12 - 16mm ∅ 12 - 16mm ∅ VERIFY CENTER FOOTING

C-5
NOTES: 1. NO FOOTING SHOULD REST ON BACKFILLED MATERIALS.
2. IN CASE THE SOIL CONDITION AT THE FOUNDING LEVEL OF THE FOOTING CAN'T BE ASCERTAINED, THE CONSTRUCTOR
MUST CONSULT A SOIL EXPERT OR A GEOTECHNICAL ENGINEER AND EXPLORE THE SUBSURFACE CONDITION.
MAY BE ADJUSTED TO ACCOMMODATE THE DEPTH REQUIREMENTS OF THE CISTERN.

ANY DISCREPANCY MUST


3. FOUNDING LEVEL OF FOOTINGS LOCATED AT THE CISTERN AREA AFTER APPROVAL BY THE STRUCTURAL ENGINEER,
rcw-1 detail ANY DISCREPANCY MUST
BE VERIFIED WITH THE BE VERIFIED WITH THE
ARCHITECT AND ENGINEER ARCHITECT AND ENGINEER

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG S L A B S C H E D U L E
F O O T I N G S C H E D U L E
INTEGRATED BUS TERMINAL B E A M S C H E D U L E S
AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO C O L U M N S C H E D U L E 05 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER F T B 1 D E T A I L
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT R C W - 1 D E T A I L
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO
ROOF PLAN ROOF FRAMING PLAN

STEEL TRUSS 1 DIAGRAM


STEEL TRUSS 2 DIAGRAM
ANY DISCREPANCY MUST
BE VERIFIED WITH THE
ARCHITECT AND ENGINEER

PROJECT TITLE: PREPARED BY: CHECKED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET CONTENT : SHEET NO.:

PROPOSED PICONG R O O F D E T A I L S

INTEGRATED BUS TERMINAL S


AR. GLORYROSE DY METILLA ABIBAZAR W. SALI FAUSIAH R. ABDULA ATTY. NAGUIB G. SINARIMBO 06 10
LOCATION: ARCHITECT CONSULTANT PROJECT DEVELOPMENT OFFICER V OIC DIRECTOR II MINISTER
PROJECT DEVELOPMENT MANAGEMENT DIVISION OPERATION MANAGEMENT SERVICE MINISTRY OF THE INTERIOR AND LOCAL GOVERNMENT
BANGSAMORO AUTONOMOUS REGION IN MUSLIM MINDANAO

You might also like