Attach-14 Work Procedure For Welder Training and Qualification
Attach-14 Work Procedure For Welder Training and Qualification
17125
WUHUAN
Talcher Fertilizers Project
ENGINEERING 17125-PC10-WD-002
CO.,LTD
WORK PROCEDURE 1 of 9 Rev. 0
0 For Bidding
REV. DESCRIPTION DEGND CHEKD APPRD DATE
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN
ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
CONTENTS
1. Purpose ............................................................................................................................................................... 3
2. References ...........................................................................................................................................................3
3. Scope ...................................................................................................................................................................3
4. Definition ............................................................................................................................................................3
5. Responsibilities ...................................................................................................................................................4
6. The Welder Training and Qualification Acceptance Flow Diagram ..................................................................5
7. Management ....................................................................................................................................................... 6
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
1. Purpose
This procedure establishes the standard work process for the qualification and training of all
sub-contractor and all site welders & welding operators required by WUHUAN on Project.
2. References
ASME BPVC IX
Welding Work Management procedure
3. Scope
This procedure is applicable to the site qualification and training of all welders and welding
operators for Sub-contractors and/or WUHUAN's construction team on the project associated.
Any deviation from this procedure shall be documented and submitted to WUHUAN and
Owner in writing.
The application scope of this procedure includes steel structure construction, field equipment
construction and pipe construction.
4. Definition
All Welders shall take part in and pass the welder qualification examination in site before any
welding work starting.
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
5. Responsibilities
Owner QA/QC has the right of supervision on quality work and welder training and
qualification at all stage.
5.1 WUHUAN QA/QC Manager
The QA/QC Manager is responsible to ensure the program is applied and implemented and
that all welders are qualified as per the Code requirements.
Organizes the welder qualification examination, and witness the whole process.
The WUHUAN welding engineer is also responsible for guidance the work of the
Subcontractor's welding engineers.
Maintain an up-to-date file of the welder qualification log(s) and reject rates.
Report and renew welder qualification examination status in weekly welding summary
report.
The WUHUAN welding engineer is responsible for witnessing all welder qualification
examination &testing on site in accordance with the approved welder qualification
examination procedure and relevant standards as required. All the welder qualification
examination &testing on site shall meet the approved applicable WPS.
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
WUHUAN and Sub-contractor are responsible for maintaining and issuing welder
qualification records and certification in accordance with ASME BPVC IX
Responsible for the welder in-house training.
5.4 NDE Company
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
Subcontractor
Preparing welder
testing plan
Reject
Check welder
qualification
WUHUAN
Accepted
Organizing
welder testing WUHUAN
Welder
training
WUHUAN
OWNER
NDT
Reject
Accepted
Issue Accepted
Welder Card
7. Management
7.1 General
When the welders have been properly trained for their intended work on xxxxx
PROJECT and have certificates, each welder and/or welding operator shall pass a welder
qualification examination &testing on site before being permitted to perform any welding
works on site. The qualified welder will not be allowed to perform any welding outside
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
the qualification (the process, base metal, thickness/diameter range, position, filling metal
qualified during the test).
After successful examination& testing, welders will be required to attend a training class
given by the Sub-contractor's welding engineer to explain the project welding
requirements.
Welders are subject to performance review at all times by the WUHUAN and OWNER
engineer. Whenever deemed appropriate or necessary due to unacceptable repair rates(the
unacceptable repair rates is ≥10%), the welder must be requalified by WUHUAN.
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
All welders shall be provided with suitable and safe hand tools (grinders, brushes, hand
hammer, etc), and personnel protective equipment (PPE) for performing welding
operations.
7.4 Welder Qualification Testing Process
When the welder candidate(s) have demonstrated the ability during training to perform
sound welds and/or have passed the relevant Labor Bureau tests, the Sub-contractor shall
submit a list with the qualification certificate of the proposed test candidates to
WUHUAN and Owner on-site at least 24 hours prior to testing.
Sub-contractor is responsible for the welder qualification testing program. WUHUAN
and Owner welding engineer shall witness and monitor the welder qualification testing
on-site.
When the welder successfully passes the appropriate qualification test, he/she is required
to attend a training class given by the Sub-contractor's welding engineer to explain the
welding work requirements.
A welder has two times chance for welding qualification test. If a welder is considered
acceptable for re-testing, he/she shall undergo a further agreed training period prior to a
re-test. Following re-training the welder is only allowed one time to re-test, if the welder
falls he/she shall not be allowed to work .
Following successful qualification testing, WUHUAN shall issue each welder a personal
ID Card, which shall bear a recent photograph of the welder and the welders unique ID
number, together with the list of the relevant approved qualifications range. The welder
shall carry this ID card at all times when working on xxxxx PROJECT.
The unique welder identification number given to each welder shall not be re-issued to
any other welder during the life of xxxxx Project.
Prior to the commencement of any work on site, all welders, welding operators and/or
tack welders shall be qualified to the applicable approved WUHUAN welder
qualification standards.
On process piping welding, the first two production of butt welds of each newly qualified
welder shall be radiographed test.
Welding process, base material(s), thickness range and diameter, position(s), filler metal
must been approved and meet the WPS’s requirement.
7.5 Records
WUHUAN is responsible for issuing all Accepted Welder Card of xxxxx project.
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD
WUHUAN Talcher Fertilizers Project WUHUAN Job. No.17125
Sub-contractor and/or WUHUAN's construction team shall maintain test record lists on a
daily basis for all welder qualifications, weekly qualification maintenance logs, welder’s
weld reject records and any other records associated with the testing and qualification of
welders.
Sub-contractor shall submit a copy of the welder qualification status log, including reject
rates, to WUHUAN, and Owner on a weekly basis via email.
7.6 Others
Limits of Qualified Positions and Diameters according to ASME BPV Code Sec. IX
Acceptance Criteria for Visual Inspection according to ASME BPV Code Sec. IX
Alternate Base Materials for Welder Qualification according to ASME BPV Code Sec.
IX
Acceptance Criteria for Visual Inspection according to ASME BPV Code Sec. IX
MUST NOT BE COPIED, TRANSMITTED TO OTHERS OR USED WITHOUT PERMISSION OF WUHUAN ENGINEERING CO. LTD