Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

10 Maintenance 10.

3 Maintenance

Table 10.6 Maintenance log sheet


Maintenance log sheet
Month Year
Daily maintenance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Check probe/mixer/wash well
Check DI water tank and
2
tube connection
Check waste connection and
3
waste tank connection
4 Check probe wash solution
5 Clean electrode tubes
6 Check sample/reagent syringe
Weekly maintenance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Clean probe exterior
2 Clean mixer
Monthly maintenance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Clean wash wells
2 Clean sample injection port
3 Pump calibration
4 Air bubble detector calibration
Three-month maintenance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Clean DI water tank
Six-month maintenance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Replace lamp
As-required/As-needed maintenance 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Lamp background test
2 Clean analyzer panels
3 Bar code maintenance
Clean sample/reagent
4
compartment
5 Clean probe interior
6 Clean rotors
7 Replace probe
8 Replace mixer

9 Special wash probe


10 Replace ISE electrode

BS-230 Operator’s Manual 10-11


10.3 Maintenance log 10 Maintenance
sheet

Maintenance log sheet


Month Year
11 Store electrodes
12 Remove reagent pack
13 Clean ISE waste tube
14 Replace syringe
15 Remove air bubbles in syringe

10-12 BS-230 Operator’s Manual


10.3 Maintenance log 10 Maintenance
sheet

10-12 BS-230 Operator’s Manual

You might also like