Information

Inspection floor #

Jobsite name

Location 

Conducted on 

Prepared by

Description

Field Inspection of Curtain Wall

Following are the normal procedures for field inspection of the curtain wall installation.
These procedures are carried out by the Superintendent, Project Manager, Field crew
lead man, Glazing crew, or Insulation crew

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 1/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

-Embeds are inspected by Project Superintendent during the initial framing of the slabs
to make sure that the layout is per the embed drawings furnished by JAMCo. Any
questions are addressed and corrected.

-The aluminum tee's and steel anchors are installed per the layout required to match the
shop drawings. Any questions are addressed and corrected

-The steel anchors are tack welded in place per the layout. The mulls are installed and
held into place by temporary drill flex. After checking to make sure everything is correct
per the layout, and any adjustments made, the welding of the steel anchors is
completed. Inspection of the welds is ongoing during the installation process.

-The curtain wall is adjusted to its proper elevation, and bolts installed to secure the
mulls to the anchors. Inspection of the installation is on-going by the lead man,
superintendent, and project manager.

-The prep crew installs the gasket, setting blocks, weep baffles, and are instructed to
make sure bolts, anchors, and welds are installed properly. Any questions are brought
to the attention of the lead man and superintendent. Corrections are made if necessary.

-The galvanizing crew is instructed to make sure that all anchors and bolts are installed
before setting the glass. Verify dril-flex screws are removed before installing glass at
wind load clip area. Any questions are brought to attention of the lead man, and
superintendent.

-The installation crew is told to look at each anchor to make sure bolts are installed
before covering up the wall.

Any time during the installation there are questions that the superintendent feels that
our in house engineers need to be involved, they are contacted. If JAMCo's PE needs to
be involved they are contacted. Corrections are made per engineers directions.

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 2/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Embeds to be checked

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Halfen type embeds are hot dip galvanized per specifications

Yes No N/A

Plate embeds are primed, painted, or galvanized per specification

Yes No N/A

Contractors field installation crew has latest set of JAMCo embed drawings dated
___________

Yes No N/A

Heavy duty embeds are are installed where required per JAMCo embed drawings.

Yes No N/A

Embeds checked off grid and elevation per JAMCo drawings

Yes No N/A

Adequate quantity of embeds available for next floors concrete pour

Yes No N/A

Date checked 

Add signature 

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 3/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Steel and T-Anchors to be checked

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Wind load or dead load anchors installed per the shop drawings & on correct floor

Yes No N/A

Verify back of aluminum anchors have isolator tape or coating to concrete slab

Yes No N/A

Verify steel anchors have isolator coating to insure dissimilar metals do not come in
contact

Yes No N/A

Check T-bolts (4.6 or 8.8) as required and installed in proper location per shop drawings

Yes No N/A

Verify proper toque of wiznuts on T-bolts

Yes No N/A

Check all nuts tightened on all anchors

Yes No N/A

Steel anchors need to be prime painted or galvanized per specifications or exposure

Yes No N/A

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 4/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Weld length and depth per structural calculations

Yes No N/A

Clean and paint welds ASAP

Yes No N/A

Date checked 

Add signature 

Curtain wall to be checked

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Bolted connection to anchor checked -- size, type, strength, and quantity. Per shop
drawings.

Yes No N/A

Bolted connection to anchor checked; nylon washer, isolators, slip pads, nut type are
torqued tight. Per shop drawings

Yes No N/A

Remove temporary Dril-Flex screws at wind load clips after clip is bolted.

Yes No N/A

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 5/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Check horizontals for fastener type and proper installation

Yes No N/A

2nd check all nuts tightened on all anchors.

Yes No N/A

Date checked 

Add signature 

Glazing to be checked

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Prior to internal seals, insure installers have proper solvent, clean rags, and training on
silicone installation procedures.

Yes No N/A

Check sealant for shelf life date prior to use.

Yes No N/A

Check gasket corners are siliconed into curtain wall, and gaskets have molded
corners/silicone seal

Yes No N/A

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 6/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Check the horizontal is free of debris

Yes No N/A

Field test (spot check) horizontal splices & end dams

Yes No N/A

Check internal seals, gasket installation, setting blocks (size and placement), weep
baffles, edge blocks.

Yes No N/A

Glazing crew to check that glass is in good condition prior to installation.

Yes No N/A

If glass has capacity tubes, caulk end of tube as directed by Viracon's written
instructions prior to setting glass.

Yes No N/A

Perform structural and weather seal silicone pull test and log results

Yes No N/A

Date checked 

Add signature 

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 7/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Insulation to be checked

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Have copy and read all of correct UL design

Yes No N/A

Check proper thickness of insulation is being used

Yes No N/A

Check that fasteners are not to long, and will not come in contact with gaskets or glass

Yes No N/A

Check that strapping is adequate per UL design

Yes No N/A

Check that insulation is being cut and installed tight to the upper and lower horizontals.

Yes No N/A

Check that mullion wraps are proper width and installed tight to top and bottom where
required

Yes No N/A

Check that aluminum is cleaned with solvent prior to foil tape installation

Yes No N/A

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 8/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Check that all tape is sealed to foil face of insulation and foil backing is free from
holes/damage

Yes No N/A

Date checked 

Add signature 

Field Interior Trim to be checked

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Check that trim is fastened and isolated per shop drawings

Yes No N/A

Check that trim is fitted properly and without damage

Yes No N/A

Send contractor JAMCo inspection letter

Yes No N/A

Date checked 

Add signature 

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 9/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Feld Sealants and pull test by JAMCo and MFG

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Check sealant MFG pre-construction testing results for primer to be used if any

Yes No N/A

Hold pre-construction sealant installation meeting with sealant installer. Check that
sealant installer is using the proper primer, solvents, silicone, and color

Yes No N/A

Meet with MFG rep and assist in field pull tests

Yes No N/A

Repair test sites to like new condition

Yes No N/A

Obtain written test reports from MFG and file in this book

Yes No N/A

Date checked 

Add signature 

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 10/11
8/29/23, 7:01 PM Field Inspection and Quality Control Log - SafetyCulture

Water test by JAMCo and contractor

Floor Number

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Perform water test AS SOON AS POSSIBLE

Yes No N/A

Prepare and review testing procedures, specifications, and type & quantity of test
included in JAMCo bid

Yes No N/A

Include final test reports in this log

Yes No N/A

Date checked 

Add signature 

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's
solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice.
You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should
independently determine whether the template is suitable for your circumstances.

https://public-library.safetyculture.io/products/field-inspection-and-quality-control-logAyzEe 11/11

You might also like