Professional Documents
Culture Documents
17.04.23 - BPLD LẮP DỰNG THANG LỒNG
17.04.23 - BPLD LẮP DỰNG THANG LỒNG
09
08
07
06
05
04
03
02
CONTROL BOX
CONTROL BOX
4T 4T
CONTROL BOX
01
NAGOYA MACHINERY Co.
NAGOYA MACHINERY Co. 4T
NAGOYA MACHINERY Co.
REV. DATE PROCESS
CLIENT:
SUNNY BRIDGE COMPANY LIMITED
APPROVED
DATE
MAIN CONTRACTOR:
APPROVED
DATE
PROJECT:
SUNNY HOSE VIETNAM
NEW FACTORY PROJECT
LOCATION:
DESIGN CONTRACT DRAWING
STAGE
DRAWING TITLE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
SCALE: DRAWING NO: