PT.

MITRA MINERAL PERKASA


JOBSITE BCPM
RENCANA KERJA HARIAN
UNIT READY FOR USE
Excavator XE 215C = 25 Unit XE215C
Motor Grader = 2 Unit GR215
Excavator XE 370CA = 16 Unit XE370CA
Vibro XS203 = 1 Unit XS203
Date : Tuesday, 12 September 2023
Excavator XE 490DK = 0 Unit XE490DK
Rock Breaker = 2 Unit
Dozer TY230 = 2 Unit TY230
Water Truck = 2 Unit
Shift : Night Shift
DT Hanvan G7 = 43 Unit DTFuel Truck NXG525 = 2 Unit
ADT XDA40 = 3 Unit ADT
Service Truck = 1 Unit
EWH : 6.79 Hour
8 8
Pit & Loading Point Material Dumping point Loading Support Dumping Productivity Shift Capacity # Hauler Unit
Pit Moskow Tengah Low Ni ETO Mataram 3-017 226 MT/Hr 1536 MT 6 1-030, 1-041, 1-044, 1-045, 1-047, 1-059
Before UA After UA

Pit Moskow Utara High Ni EFO 3-018 194 MT/Hr 1317 MT 12 1-003, 1-005, 1-014, 1-019, 1-026, 1-027, 1-032, 1-043, 1-
Before UA After UA 050, 1-055, 1-083, 1-085

Pit Moskow Tengah OB WD Ares Tengah 3-006 2-014 426 MT/Hr 2892 MT 4 1-001, 1-006, 1-022, 1-084
Before UA After UA

Pit Moskow Tengah OB WD Ares Tengah 3-007 2-001 426 MT/Hr 2892 MT 4 1-002, 1-018, 1-034, 1-058
Before UA After UA

Pit Moskow Utara OB WD Anggrek Ban 3-004 3-005 284 MT/Hr 1928 MT 2 ADT 0-003, ADT 0-004
Before UA After UA

ETO Salwa Barging Tongkang 3-019 R2-004, 2-019 150 MT/Hr 1017 MT 6 1-008, 1-011, 1-017, 1-029, 1-037, 1-039
Bg. Marcopolo

ETO Ares Barging Tongkang 3-005 2-009, 2-011 150 MT/Hr 1017 MT 6 1-021, 1-031, 1-036, 1-042, 1-046, 1-048
Bg. Batman Before UA After UA

Segmen E Quarry All Area 3-003 2-020 (RB), 2-010 3 1-007, 1-009, 1-012

WD Ares Maintenance WD 2-003, 2-005, 4-004


Pembuatan Tanggul

Rostov Quarry All Area 3-008 3-002 (RB) 2 ADT 0-001, ADT 0-002

Maintenance Sedpond 2-014


Jumlah DT: 43 Unit
Jumlah ADT: 3 Unit
>>> POSISI UNIT EWH Plan by Weekly >>> BREAKDOWN
2-004, 2-011, 2-016, 2-019, 2-021, 2- = Jetty 1-024, 1-038, 1-040, 2-018, 10-002, 4-003, 5-002, 5-004
022, 2-023, 2-024, 3-021, R2-001, R2-
56.60%
002, R2-003, R2-004, 9-001, 9-002

2-007, 2-008, 2-010, 2-015, 3-004, 3- UA


Pit Moskow
018, 4-004 =
Utara Shift Capacity

2-006, 2-012, 2-013, 2-017, 3-001, 3- = Pit Moskow


009, 3-017, 4-002, R3-001 Tengah
7712 MT 2853 MT 2033 MT

3-010, 3-020 = EFO OB ORE Barging >>> PENDINGAN


2-001, 2-002, 2-003, 2-005, 2-014, 4- = WD Ares 1-004, 1-010, 1-016, 1-020, 1-025, 1-028, 1-033, 1-035, 1-049, 1-
001, 6-002 = ETO Mataram 055, 1-059, 1-062
2-009, 2-020 (RB), 3-002 (RB), 3- = Segmen E
005, 3-008
5-001, S 5-001, 6-001 = Mobile BD 2-018, 10-002, 4-003, 5-002, 5-004
= MHR 1-024, 1-038, 1-040
2-018, 3-011, 4-003, 5-002, 5-004 = Workshop
Pend 2-009, 3-018, 4-002, 6-001, R2-003

>>> Other Information


Fleet produksi High Ni dialihkan saat Bg. Anwari sudah ready