Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

Reporting format DATE -

Electrician Daily Report


Date

Job Responsibilities:
1. Electrician (Maintenance) is responsible for ensuring the
proper functioning and maintenance of electrical systems
and equipment in the pad manufacturing company. They
play a crucial role in keeping the production process
running smoothly and efficiently. Their primary duties
include:
2. Conducting regular inspections and preventive
maintenance of electrical systems and machinery.
3. Diagnosing electrical issues, troubleshooting problems,
and repairing electrical components and equipment.
4. Installing new electrical systems, machinery, and
equipment as required.
5. Maintaining electrical tools and equipment in good
working condition.
6. Adhering to safety regulations and ensuring electrical
systems meet compliance standards.
7. Assisting in planning and executing electrical
maintenance schedules.
8. Collaborating with other maintenance team members and
production personnel to address electrical issues
promptly.
Reporting format DATE -

Key Performance Indicators (KPIs) - Electrician (Maintenance)

1. Downtime Reduction: Measure the percentage of reduction in production downtime caused


by electrical failures.

2. Preventive Maintenance Completion Rate: Track the percentage of scheduled preventive


maintenance tasks completed on time.

3. Mean Time to Repair (MTTR): Calculate the average time taken to repair electrical
breakdowns and aim to reduce it.

4. Safety Incidents: Monitor and aim to minimize the number of safety incidents related to
electrical systems.

5. Energy Consumption Optimization: Measure and seek opportunities to optimize energy


usage and reduce electricity consumption.

6. Equipment Reliability: Track the reliability and uptime of critical electrical equipment.

7. Compliance with Regulations: Ensure adherence to electrical safety and compliance


standards, and monitor any regulatory violations.
Reporting format DATE -

SR.NO Points Description


1 Task

2 Cause

3 Solution

4 Breakdown time

5 Wip
Reporting format DATE -

6 Action plan of
wip

7 Machine name

8 Station name
9 Ampere check
machine 1,2,3,4

10 Reading meter
start of day

11 End of day
Task

Pending

Target date &time


Reporting format DATE -

Wip date &time

Completed
COMPLITION TIME

Machine no

Station no

Prepared by:

Check by:

Remark:
Reporting format DATE -

You might also like