Group Quiz Seismic N Wind
Group Quiz Seismic N Wind
Group Leader: Manalang Culanag Sersenia Degamo Ajido Roque Darunday Galupo Bantiyan Dionisio Santiago Demo
Distance, km = 10.5 4.6 4.7 4.8 6.1 6.2 6.3 6.4 10.2 10.3 10.4 6.5
Basic wind speed, km/h = 280 290 285 280 275 290 285 280 275 290 285 254
Truss overhang, m = 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4
A, m = 4.3 4.8 4.8 4.7 4.7 4.6 4.6 4.5 4.5 4.4 4.4 4.3
B, m = 4.2 4.7 4.6 4.6 4.5 4.5 4.4 4.4 4.3 4.3 4.2 4.2
C, m = 2.5 3.1 3.1 2.9 2.9 2.8 2.8 2.7 2.7 2.6 2.6 3.3
Maxpurlin spacing, m = 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
Height of truss, m = 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8
Ground to bot. of truss, m = 9.4 9.4 9.4 9.4 9.4 9.4 9.4 9.4 9.4 9.4 9.4 9.4
GI Roofing, KPa = 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
Ceiling = 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32 0.32
Purlin = 3.463 3.463 3.463 3.463 3.463 3.463 3.463 3.463 3.463 3.463 3.463 3.463
Purlins, truss fy = 248 MPa
Concrete = 3000psi GI Roofing 0.14 KPa (assume Deck, metal 18 gage)
Rebars = Gr40 GI Roofing 0.12 KPa (assume Deck, metal 20 gage)
40mm Gypsum Board 0.32 KPa (.008 per mm thickness)
1/4" Mar. plywood 0.0381 KPa (.006 per mm thickness)
Purlin 3.417 Kg/m (LC100x50x15x2.0mm) 2"x4"x2.0mm C-Purlin
Purlin 2.36 Kg/m (LC100x50x15x1.2mm) 2"x4"x1.2mm C-Purlin
Purlin 3.463 Kg/m (Tube 2"x4"x1.5mm Tube)
Project : 3 Storey Commercial Building