ROAD CONSTRUCTION DEPARTMENT

PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Fld 2 Fld 3 Fld 4 Fld 5 Fld 6 Fld 7 Fld 8 Fld 9 Fld 10 Fld 11 Fld 12 Fld 13 Fld 14 Fld 15 Fld 16 Fld 17 Fld 18 Fld 19 Fld 20 Fld 21 Fld 22 Fld 23 Fld 24 Fld 25 Fld 26 Fld 27 Fld 28 Fld 29
1 Begusarai W/S OF VISHWAKARMA CHOWK OF CRF P 16.30 2702.10 1846(S) BROADWAY 2566.439 04.12.19 03.09.2021 + 1395.79 936.49 25.11.21 2512.97 2332.27 12.83 E/W -16.30 15.60 15.60 14.43 14.43 15.50 1.165 0.00 DEC'2021 1. Construction Work With Electric
CHERIYA BARIYARPUR BLOCK TO Dt- 21.02.19 LINKS PVT. LTD. 90 DAYS DUE 03.08.2020 GSB -14.095 15.60 15.60 14.43 14.43 15.50 1.165 Pole Shifting Work Completed.
BAKHADDA CHOWK VIA GUABARI, TO COVID19 WMM 14.095 2. The Proposal of Descoping For Two
NARAYANPIPAR, CHHOURAHI = 03.12.2021 DBM -14.095 Nos of Culvert Is Sent To S.E Vide Lt.
BLOCK HQ. ROAD (UNDER CRF) JOB BC-16.30 No-757 (Anu) Dt-23.07.2021 & 700m
NO. CRF-BR-2018-19/108 PQC -1.215 Length not Available for Construction.
CD -2NO Hence Final Length 15.60 Km.

2 Begusarai W/S OFNH-31 TO KATARMALA VIA CRF P 15.45 2760.68 1846(S) M/S VEENA 2528.339 02.12.19 01.10.21 + 90 1631.46 672.53 08.09.2021 2418.41 2303.99 12.64893 E/W -14.835 14.84 14.84 10.90 10.90 10.90 3.90 5 DEC'2021 1. Construction Work With Electric
NURJUMMAPUR, DANDARI BLOCK . Dt- 21.02.19 SINGH DAYS DUE 03.08.20 GSB -14.835 14.84 14.84 10.90 10.90 10.90 3.90 5 Pole Shifting Work Completed.
ROAD (UNDER CRF) FOR THE YEAR TO COVID19 WMM 10.90 2. The Proposal of Descoping For Four
18-19 JOB NO. CRF-BR-2018-19/109 = 31.12.2021 DBM -10.90 Nos of Culvert Is Sent To S.E Vide Lt.
BC-10.90 No-766 (Anu) Dt-24.07.2021 & 55m
PQC -3.95 Length for PQC not Constructed due to
CD -9NO Land Dispute.

3 Begusarai STRENGTHENING OF DURGA HIGH NABARD P 16.30 2126.03 5016(S) M/S VEENA 1871.02876 25.05.21 24.11.22 0.00 854.15 24.11.21 752.00 954.17 0.00 E/W -16.30 13.80 13.40 13.40 1.70 0.00 2.50 4 NOV'2022 WORK IN PROGRESS & WILL BE
SCHOOL CHOWK (SH-55) NEAR Dt- 02.09.20 SINGH GSB -16.30 13.80 13.40 13.40 0.00 2.50 3 COMPLETED WITHIS TIME.
KHODABANDPUR BLOCK TO WMM 13.80
GARHPURA BLOCK VIA KUMBHI, DBM -13.80
PARORA, SHEIKHATOL ROAD BC-13.80
(UNDER NABARD) FOR THE YEAR PQC -2.50
20-21 CD -9NO

4 Begusarai IMPROVEMENT OF ROAD FROM P 35.05 6348.03 12941(S) M/S Veena Singh 4184.98 01.12.21 30.11.23 184.13 03.02.22 3.15 3.15 E/W-35.05 12.00 6.50 Nov-23 Work in progress.
BTPS CHAKIYA TO NH-31 Dt-31.12.19 GSB-35.05 0.00 0.00
(LAKHMINIYA BALIYA VIA GUPTA- WMM-35.05
LAKHMINIYA BANDH BEGUSARAI DBM-35.05
BYEPASS FOR THE YEAR 20-21 BC-35.05
S. Filling-16.50
PCS MIS-16.50
Gantry Board-4
C. Barriear-20
P. block-16.50

4 Begusarai 4 83.1 13936.84 3211.38 2463.17 5686.53 5593.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
5 Darbhanga Widening & Strengthening for Allalpatti P 2.050 520.260 Letter No. Singh 508.27098 03.09.2019 01.12.2020 277.31 0.00 15.03.2021 508.27 277.31 E/W- 2.05 2.05 2.05 1.85 1 OCT-2021 Notice is issued for Encroachment
chowk to Rahamganj chowk and 9171(S) Construction Pvt. GSB- 2.05 2.05 2.05 1.85 1 Drain-1.45
Gangasagar Pokhar via Marwari college Date- Ltd. DLC- 2.05
gate under RCD, Road Division, 03.12.2018 CCP- 2.05
Darbhanga for the year 2018-19 Drain - 1.55
CD- 1/22/0-1

6 Darbhanga Construction of RCC Drain size 60 cm x NP 7.500 571.24 8575(S) Bal Krishna 490.02653 07.09.2019 04.09.2020 289.84 0.00 17.03.2021 490.03 289.84 2.45013 Drain - 7.500 Dec-21 Work in progress.
90 cm in Darbhanga-Kamtaul-Basaitha- Date- Bhalotia Drain-6.20 km
Madhwapur Road (SH-75) and Kamtaul- 15.11.2018 08.06.2020
Jogiyara Road under RCD, Road
Division, Darbhanga.

7 Darbhanga Construction of Drain in PBM and Old NP 11.310 915.09 7391(S) Singh 1038.46825 10.07.2019 30.09.2021 377.84 75.00 23.02.22 1038.47 452.84 5.190 Drain- 11.310 April-22 Work in progress.
NH-57 Kangwa Gumati to Shisha Factory Date- Construction Pvt. Drain-5.75
via Mithila Flour Mill under RCD, Road 25.09.2018 Ltd. 06.06.2020
Division, Darbhanga for the year 2018-19

8 Darbhanga Construction of R.C.C. Drain in Jalley- P 17.400 1281.24 961(S) Mahesh Kumar 1154.46535 09.12.2019 22.04.2021 97.92 0.00 21.08.2020 1154.47 97.92 5.770 Drain- 17.40 April-21 Scheme is closed.
Aterbel Road (14.510 Km), Jalley- Date- singh Drain-4.75
Shankar chowk to Ghoghraha chatti Road 25.01.2019 27.05.2020
(1.79 Km) and Jalley-Jogiyara-Makiya
Road (1.0 Km) (Total length 17.300 km)
in size of 600mm x 750mm) and Cross
Drain in size of 900mm x 750mm
(Length 100 M) for the year 2018-19

9 Darbhanga IRQP work of Ashok paper Mill to NP 11.335 1393.46 7159(S) Vidyarthi 1250.95901 12.05.2020 30.06.2021 441.02 431.46 23.02.22 1250.96 872.48 6.25480 E/W- 11.335 11.34 11.30 7.31 7.31 4.02 13 Mar-22 Work in progress.
Bideshwarasthan NH-57 Road under Date- Construction Pvt. DGBM- 7.310 11.34 11.30 7.31 7.31 4.02 13
RCD, Road Division, Darbhanga for the 02.08.2019 Ltd. 30.09.2020 WMM- 11.300
year 2019-20 DLC- 4.025
(02 SBD of 2020-21) PQC- 4.025
BC- 7.310
Culvert-
1/22/0-11 No.
2/22/0-3 No.
3/33/0-2 No.

1
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
10 Darbhanga W&S of Ahilya Asthan to Gautam kund P 5.95 2348.35 10502(s) Krishna Kant 2454.51281 10.08.2020 09.11.2021 972.92 557.85 18.11.21 2454.51 1530.77 E/W-5.77 5.77 5.77 2.15 2.15 2.15 3.50 11 Feb-22 New proposal of flexible pavement
(Narauchh) 31.07.19 Thakur GSB-5.77 5.77 5.77 2.15 2.15 2.15 3.50 11 against PQC in 600m length.
WMM-2.15
DGBM-2.15
BC-2.15
DLC-3.62
PQC-3.62
CD-
1/22/0-6, 3/33/0-3
1/65/0-2
Bridge-Pile-28 no.
Pile cap-4, Abutment-
2
Pier-2
Deck- 3

11 Darbhanga IRQP work of Muriya-Bhalpatti- P 14.465 858.47 7734(S) Vidyarthi 820.73039 02.06.2020 01.02.2021 258.23 218.00 25.01.22 820.73 476.23 4.10370 E/W-14.455 10.00 12.095 12.09 12.09 2.36 1 Jan-22 Completed.
Nainaghat Road from (km 0.000 to Date- Construction Pvt. 23.02.2021 WMM-12.095 10.00 12.095 12.09 12.09 2.36 1 Except 405m PQC work proposed in
14.465) under RCD, Road Division, 27.08.2019 Ltd. DGBM-12.095 FDR
Darbhanga for the year 2019-20 BC- 12.095
(05 SBD of 2020-21) PQC-2.360
CD-3/33/0-1.

12 Darbhanga IRQP work of NH Khirma-Jalwara- P 10.500 876.75 8652(S) Vidyarthi 868.88406 27.07.2020 26.01.2021 191.79 0.00 21.03.2021 868.88 191.79 4.34442 E/W- 9.500 5.00 1.80 6.00 4.00 4.00 3.10 6 April-22 1 no. CD in progress.
Asraha-Bishfi Road under RCD, Road Date- Construction Pvt. 28.01.2021 GSB- 1.800 5.00 1.80 6.00 3.00 1.50 3.10 5
Division, Darbhanga for the year 2019-20 19.09.2019 Ltd. WMM- 6.000
(Km 0.00 to 10.50) DGBM- 6.000
(07 SBD of 2020-21) BC- 6.000
PQC-3.500
CD-
1/22/0- 04
3/33/0- 02

13 Darbhanga IRQP work of Sirua to Nimaithi via NP 8.100 723.12 7154(S) Vidyarthi 697.44731 19.09.2020 18.06.2021 65.81 124.62 23.02.22 697.44 190.43 3.48724 E/W-7.600 6.00 2.50 1.00 1.00 1.80 5 April-22 5 nos. of CD, PQC and Bituminous
Khaira Kujji Korigama Road from K.M. Date- Construction Pvt. 31.03.2021 WMM-5.85 6.00 2.50 1.00 1.00 1.40 5 work are balance and likely to complete
0.00 to 8.10 under RCD, Road Division, 02.08.2019 Ltd. DGBM 5.850 by April
Darbhanga for the year 2019-20 BC- 5.850
PQC-1.750
CD-
1/22/0- 8 No.
2/22/0- 2 No.

14 Darbhanga Widening and Strengthening work for P 11.712 2987.63 9636(S) Classic Engicon 3249.58164 15.09.2020 14.01.2022 639.13 0.00 15.03.2021 3249.58 639.13 E/W- 11.611 10.50 11.61 5.39 5.39 5.39 6.20 12 January 2022 15m PQC is left due to local hindrance.
Taralahi-Simri Road under Road Date- Pvt. Ltd. GSB- 11.611 10.50 11.61 5.39 5.39 5.39 5.70 12
Division, Darbhanga for the year 2019-20 04.11.2019 WMM- 5.391
(PLAN) DGBM- 5.391
BC- 5.391
DLC- 6.220
PQC- 6.220
CD-
1/22/0-5 No.
2/22/0-4 No.
3/33/0-3 No.
1/85/0- 2 No.

15 Darbhanga IRQP work of Chikni-Shivram-Lulhwa P 29.541 2788.76 7496(S) Classic Engicon 2935.46908 15.09.2020 14.11.2021 77.56 1100.00 25.01.22 2935.47 1177.56 E/W- 29.541 29.00 2.80 11.58 11.00 10.00 9.18 16 Mar-22 Work in progress.
Chowk Bajitpur Devna via Kumhraul Date- Pvt. Ltd. GSB- 2.800 25.50 2.80 11.58 8.10 8.00 9.18 16
Road under RCD, Road Division, 16.08.2019 WMM- 11.580
Darbhanga. (Total Length 29.541 Km.) DGBM-11.580
for the Year 2019-20 BC- 11.580
(12 EPC of 2020-21) PQC- 9.175
(EPC) CD-
1/22/0- 14 No.
2/22/0- 01 No.
3/33/0- 01 No.

16 Darbhanga W&S of Bharwara (Lalpur Chowk) to P 5.120 1309.98 9156(S) S. K. 1124.83129 19.09.2020 18.05.2021 253.48 255.38 06.08.2021 1124.83 508.85 5.62400 E/W- 4.940 4.90 4.80 2.38 2.00 2.00 2.10 11 Mar-22 PQC, Approach & Protection work are
Chamunda Asthan via Maheshpatti, Pipra Date- Construction & GSB- 4.940 4.90 4.50 2.38 2.00 1.60 1.80 11 balance.
under SBD for RCD, Road Division, 14.10.2019 Company 12.06.2021 WMM- 2.375
Darbhanga for the year 2019-20 (5.12 DGBM-2.375
KM) BC- 2.375
(13 SBD of 2020-21) DLC- 2.565
PQC- 2.565
Box Culvert-
1/22/0- 09 No.
1/33/0- 01 No.
3/33/0- 02 No.

2
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
17 Darbhanga IRQP work of Shaini chowk to P 14.100 1638.33 8045(S) Maa Rajeshwari 1606.96371 10.09.2020 09.06.2021 254.93 410.33 25.01.22 1606.96 665.26 8.03400 E/W- 14.100 14.10 9.97 9.97 7.00 6.50 3.50 9 April-22 4 no. CD, PQC, Bituminous work,
Dagarsama-Kapchhahi-Amapatti- Date- Construction Pvt. DLC-4.130 14.10 9.97 9.97 7.00 6.50 3.50 9 Protection work are balalnce and likely
Satghara via Dain Dekuli-Sisauni-Ughra 03.09.2019 Ltd. 16.06.2021 PQC- 4.130 to complete by April
Road under RCD, Road Division, GSB- 9.970
Darbhanga for the year 2019-20 (14.10 WMM- 9.970
Km) DGBM- 9.970
(09 SBD of 2020-21) BC-9.970
CD Work
1/22/0- 07 No.
2/22/0- 05 No.
3/33/0- 01 No.

18 Darbhanga Construction of Road from Ekmighat 2nd NABARD 9.64 7266.73 7735(S) Mahesh Kumar 729.10577 09.12.2019 23.10.2020 17.15 0.00 18.03.2020 729.11 17.15 3.65000 GSB HS-7.87 0.00 3.00 0.00 0.00 0.00 0.00 December 2020 Scheme is closed.
Km of Darbhanga-Samastipur Road (SH- Dt. singh WMM - 220 M 3.00
50) to Sobhangram village (NH-57) on 12.07.2012 27.05.2020 BM - 220 M
the western embankment of Khiroi river SDBC - 220 M
for the year 2017-18 Geo Bag -3.170
(NABARD) R. Wall- 360 M
C. Drain-3.455

19 Darbhanga Construction of Road and RCC Drain 0.860 335.34 Letter No. - 0.00 T.B. with C.E.
from Hasan Chowk to Poor Home via Raj 1872(S)
Kumar Ganj in territory of Darbhanga Date
city under RCD, Road Division, 22.02.2019
Darbhanga for the year 2018-19

20 Darbhanga Widening & Strengthening of Dekuli- 21.570 4889.35 Letter Narsingh Singh 3979.63 17.11.21 16.10.23 0.00 E/W-21.45 2.00 0.50 Work in progress.
Sisauni Road under RCD, Road division, No.7732(S) GSB-21.45 1.00 0.00
Darbhanga for the year 2019-20 Date WMM-13.41
27.08.2019 DGBM-13.41
BC-13.41
DLC-8.03
PQC-8.03
CD-23

21 Darbhanga Widening & Strengthening of SH-50 3.626 514.94 Letter Sidhivinayak 516.97 04.02.22 03.10.22 0.00 E/W-3.66 0.50 Work in progress
Ekmighat To Kilaghat L.N. Mishra No.4827(S) GSB-3.66
PWD Road under RCD, Road Division, Date WMM-1.632
Darbhanga for the year 2019-20 26.08.2020 DGBM-1.632
(Length- 3.626 Km) PQC-2.028

22 Darbhanga Widening & Strengthening of Hathauri 5.395 2500.09 Letter - 0.00 T.B. with C.E.
Kothi PWD Road to Baheri PWD Road No.4904(S)
with H.L. RCC Bridge (3x16.6M) in Km Date
3rd and 4th under RCD, Road Division, 29.08.2020
Darbhanga for the year 2020-21

23 Darbhanga IRQP work of Rajwara- Tarauni to 17.200 1547.48 Letter M/S Hopecon 1683.16 17.11.21 16.09.22 0.00 E/W-14.80 1.20 PQC & 5 no. CD work in progress.
Dhoighat Road via Fardaha-Itharwa- No.4965(S) Infra Project Pvt. GSB-14.00 1.00
Ammi-Majhigama- Dhabaila-Dhoighat Date Ltd. WMM-15.00
Road under RCD, Road Division, 31.08.2020 DGBM-11.431
Darbhanga for the year 2020-21 BC-11.431
DLC-0.965
PQC-3.152
CD-21

24 Darbhanga Widening & Strengthening of Baheri 9.410 1975.93 Letter M/S Hopecon 2023.97 17.11.21 16.12.22 0.00 E/W-9.41 2.00 05. no. CD work in progress.
PWD Road Jhajhari chowk to Sirua No.4901(S) Infra Project Pvt. GSB-9.41 1.00
via Bhachhi Ujaina Road in Baheri Date Ltd. WMM-6.03
Block under RCD, Road Division, 29.08.2020 DGBM-6.03
Darbhanga for the year 2020-21 BC-6.03
DLC-3.38
PQC-3.38
CD-10

25 Darbhanga W/S with maintenance work of Bathiya- 4.106 1057.70 7948(S) RL Choudhary - 0.00 LOA issued.
Naryanpur-Kakodha-Mahiya-Devna- Date- Infratech Pvt. Ltd.
Rajakharwar Road in Km 9(P), 10, 11, 05.09.2017
12(P), 13, 14(P), 15(P) & 17(P) (Total
length-4.106 Km) under NABARD for
the year 2017-18

26 Darbhanga Widening & Strengthening of Kamtaul 22.000 4009.02 Letter - 0.00 T.S. with C.E.
Pani Tanki to Sanahpur (Shyam Chowk) No.5060(S)
via Belwara Kanti Pokhar, Jahangir Tola, Date
Mahadev Chowk, Paktola, Chakauti 03.09.2020
Kalwara, Bedauli Chowk Road under
RCD, Road Division, Darbhanga for the
year 2020-21

3
26 Darbhanga 22 242.890 38785.85 4214.92 3172.64 18929.71 7387.56 0.50 0.00 0.00 0.00 0.00 0.00 0.00
Total
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
27 Madhubani Widening & Strengthening work of Indo- Indo Nepal NP 10.61 8481.11 1161(S) Kailash Prasad 3983.96868 31.01.2020 30.01 2022 + 591.08 718.07 16.09.2021 1500.00 1090.41 0 E/W-10.61 10.41 3.50 1.00 0.00 0.00 0.60 13 30.01 2022 + 90 2 no Box Culvert in progress.
Nepal Border Road Parsa to Akhara Ghat 24.02.19 Yadav Construction 90 days for GSB-10.61 10.41 3.50 1.05 (1st 0.60 13 days for Covid 19
(Part of Missing link 3A) (Indo Nepal) Pvt. Ltd. Covid 19 WMM-10.01 Layer)
DGBM-10.01
BC-10.01
DLC-0.60
CCP-0.60
Box Culvert-20 No.

28 Madhubani Widening & Strengthening work of Indo Indo Nepal NP 28.6 17296.61 1161(S) Kailash Prasad 9352.26468 17.09.2020 16.09.2022 + 463.24 963.24 15.09.2021 2250.00 1959.77 0 E/W-13.60 11.00 8.60 5.5 (1st 0.00 0.00 3.00 16 16.09.22 2 nos. Box Culvert in progress
Nepal Border Road Jhori Chowk to 14.02.17 Yadav Construction 90 days for GSB-20.60 11.00 8.60 Layer) 3.00 16
Bhutha Chowk via Mahadevmath. Pvt. Ltd. Covid 19 WMM-24.40
(Indo Nepal) DBM-24.40
SDBC-24.40
DLC-2.359
CCP-4.20
HP. culvert-36 No.
H.L.Bridge -3x 22M

29 Madhubani Widening & Strengthening work of CRF P 18.071 2918.19 1846 (s) dt/ Jai Mata Di 3094.248 31.07.2020 30.03.2022 + 815.98 1587.08 23.12.21 2250.00 1505.50 0 E/W-17.13 11.30 11.30 6.50 6.20 1.20 4.37 10 30.03.22 Work in progress.
Ladania Bazar to Babubarhi up to SH 21.02.2019 Construction, 90 days for GSB-15.52 11.30 11.30 6.50 6.20 0.80 4.07 10
road (Job No-CRF-BR-2018-19/90) Covid 19 WMM-7.572
(Under CRF) DBM-7.522
BC-7.522
DLC-9.50
CCP-9.50
B. culvert-20 No.

29 Madhubani 3 57.281 28695.91 1870.30 3268.40 6000.00 4555.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
30 Samastipur Widening & Strengthening of Dayal NABARD 11.485 2836.31 Lt-5066 (S) Raj Kumar Singh 2278.26 09.02.19 09.05.2020 1595.90 148.45 2278.26 1350.14 11.39 lakhs/ E/W- 11.485 10.70 9.14 9.14 7.80 1.29 2.20 7 Mar-22 1) Work in Progress.
Chowk (RCD Road) to Maddudabad dt- 30.07.18 Raja Construction 31.12.2020 1040, dt- GSB- 9.135 10.70 9.14 9.14 7.50 1.29 2.20 7 Box culvert (3 Nos) in good condition.
(RCD Road) via Kancha in Vidyapati Pvt. Ltd., 31.07.2021 12.10.19/ WMM- 9.135 2) Proposal of Descope has been sent
Block under SBD for the year 2018-19. 9431049111, (A/F EOT) Debared vide lt- DGBM- 9.135 Vide Division Letter No- 82 Dt-
rajaconst2004@gm 112, dt-28.01.20 BC- 9.135 30.01.2021.
ail.com PCC- 2.35 3) Revised Estimate Sanction C.E. Lt.
CD- 5 Nos no-2556, dt-08.12.21
(H.P) 5 Nos (2x2) 4) Work Order issued vide lt. no- 44
dt- 15.01.2022

31 Samastipur Widening & Strengthening of Motipur NABARD 13.6 2198.97 4643(s) Raj Kumar Singh 1873.38 09.02.19 24.06.20 1852.62 243.05 42.66 E/W-13.60 13.60 13.60 12.40 12.40 12.40 1.18 2.00 Dec-20 1 nos. culvert not being feasible as
Chowk-Bherokhera-Imli Chowk-Silaut- dt-20.06.18 Raja Construction GSB-13.60 house has been built up one side.
Gandak Bandh in km 0.0 to 13.60 under Pvt. Ltd., WMM-12.40 Proposal of descope has been sent.
SBD for the year 2018-19 9431049111, DGBM-12.40
rajaconst2004@gm BC-12.40
ail.com PCC-1.18
CD-3

32 Samastipur Construction of 1/22/0 RCC Box Culvert FDR - 192.69 Lt-3995 (S) Ramesh Prasad 161.85 13.02.19 12.11.19 77.71 0.00 161.85 52.71 CD-7 Nos - - - - - - 4 - (1) Work Closed.
in km 7, 8, 10, 11, 12, 13 & 14 OF MMB Bridge dt- 30.05.18 Gupta 4 (2) Proposal for descoping 3 Nos Box culvert
vide letter no- 1038, dt- 24.12.2020
ROAD for the year 2017-18 9473335065
(3) Proposal for premature closure of the
rameshprasadgupta agreement has been sent to S.E Darbhanga
ara@gmail.com due to unavailability of required land for
construction vide letter no 1219 (we) dt-
02.12.2019 to S.E. Letter no. 2178, dt-
31.12.2019 to C.E.
4. Handed over to NH Division, Biharsharif-1
vide Div. Letter no-975 (we) dt-01.11.21

33 Samastipur Bakarpur chowk-Sultanpur-Ghatahatole- State Plan 4.1 3074.81 Lt-12044 (S) Sona Construction, 1329.9 19.05.17 30.06.2019 1133.31 29.00 1329.90 1137.86 6.44 lakhs/ 829 E/W- 3.83 3.83 3.83 3.83 3.83 3.83 - 8 Mar-22 Approach in Progress.
Mahmaddipur-Bochaha Ghat road. From dt.12.12.14 Chhapkahi, (EOT) dt- 03.08.18 GSB- 3.83 3.83 3.83 3.83 3.83 3.83 8 Dispute regarding nature of land has been
resolved as on the basis of final valuation of
km 7.802 To 11.90 Construction of 03 Basbitti, Supaul. WMM- 3.83
land decided by the Collector, Samastipur vide
(Three) Nos. of RCC H.L Bridge having 8877562049 BM- 3.83 letter no- 51 dt- 30.01.2021 as per div. letter
single span of 24.0m each in 7th km.For sonacon@gmail.co SDBC- 3.83 no- 846 dt- 13.08.2019, after six man
the year 2014-15 (Tendered in 2017-18) m CD- 8 Nos committee inspection- 04 nos registry part
HL Bridge-3 completed as per required document
Submitted.
Required Rs- 44,78,835.0.00 for Satat lease in
Process.

34 Samastipur W/S of Tajpur Petrol Pump Chowk to NABARD 14.525 2768.78 6250 (S) dt- Alectra Const. Ltd., 2146.02628 13.03.20 12.09.21 1234.71 252.21 2146.03 1178.92 E/W- 14.395 14.00 13.00 9.80 6.00 5.52 0.00 13 Mar-22 On Schedule/Work in Progress.
Basahiganj chowk via Gaddopur, 10.07.2019 Samastipur 12.12.21 GSB- 14.395 13.00 13.00 9.30 6.00 5.52 13 Still Flood effected.
Dighrua, Rajendar Chowk under SBD for alectra123@gmail.c (90 days) WMM- 13.47 1.90 Km L.A. Problem.
the year 2018-19 om DGBM- 13.47 Delayed due to Flood in Nun River
9471644200 SDBC- 13.47 Overtopped.
PCC- 0.925 Revised estimate Sanction C.E. vide lt.
CD- 14 Nos no-631(we) dt-03.03.21

4
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
35 Samastipur W/S OF ILLMASNAGAR- BALLIPUR- State Plan 10.71 2063.79 6311 (S)/ Alectra Const. Ltd., 1590.16588 18.03.20 17.06.21 971.57 581.46 1590.17 1261.01 E/W- 10.58 10.58 10.58 10.20 9.20 3.60 0.00 0.00 Mar-22 Work in Progress.
DUMRA- BAHERI ROAD IN KM 00.00 11.07.2019 Samastipur 17.09.21 GSB- 10.58 10.20 10.20 10.20 9.20 3.60
TO 10.710 UNDER SBD FOR THE alectra123@gmail.c (90 days) WMM- 10.58
YEAR 2018-19 om DGBM- 10.58
9471644200 BC- 10.58

36 Samastipur W/S OF SAMASTIPUR- State Plan 15 3600 6312 (S)/ Alectra Const. Ltd., 2810.04094 18.03.20 17.09.21 1094.30 280.82 2810.04 800.12 E/W- 15.00 14.50 13.40 5.20 3.00 0.00 0.00 7 Mar-22 On Schedule/
DALSINGSHSARAI ROAD IN KM 6.00 11.07.2019 Samastipur 17.12.21 GSB- 13.40 14.50 13.40 5.00 3.00 7 Work in Progress.
TO 20.00 UNDER SBD FOR THE alectra123@gmail.c (90 days) WMM- 13.40 Electric work in Progress.
YEAR 2019-20 om DGBM- 13.40 Pole Shiffting Work Order Letter no-
9471644200 BC- 13.40 412, dt- 28.06.2021.
PQC- 1.50 Utility Shifting Variation Summated
H.P. - 7 Nos vide lt. no-485 (we) dt- 17.07.2021
Box Culvert- 5 Pole Shifting not started due to water
pounding.
Variation Statement Submitted

37 Samastipur W/S OF SH-50 (DARBHANGA- State Plan 7.804 2326.97 8220 (S), dt- HARI 2071.725 28.04.20 27.07.21 784.24 233.98 2071.73 885.66 10.36/ Lt-367 dt- E/W- 3.784 3.70 3.70 3.70 6.50 0.50 0.00 0.00 Mar-22 Bituminous work in Progress. 95% GSB/
SAMASTIPUR ROAD IN KM 38.00TH 09.09.19 CONSTRUCTION (90 days) 05.06.21 GSB- 3.784 3.70 3.70 3.70 6.50 0.50 WMM Completed.
TO 43TH (P) & 43 (P) To 47 AND WMM- 3.784 For trans location of trees, where ever in
(P)(TOTAL LENGTH - 7.804 KM) ASSOCIATES DGBM- 7.804 widening part.
UNDER SBD FOR THE YEAR 2019-20 PVT. LTD. BC- 7.804 (i) Pproposal No- FP/BR/ ROAD/
141547/ 2021 has been submitted,
shrihari.htd14@gm
vide div. letter no- 312 dt- 19.04.2021.
ail.com
(ii) CAMPA letter no- 66 d- 437 to
D.F.O, Samastipur for Verification.
(iii) Div. Letter No- 376 encl. dt-
09.06.2021 to D.F.O. Samastipur
regarding FRA.
(iv) EOT vid lette no- 722, 01.09.2021
(iv) Revised Estimate Submitted vid
letter no- 765 dt- 11.09.2021 to S.E.

38 Samastipur W/S of Magardahighat to Silout (Durga State Plan 5.00 1967.46 7524 (S) Broadway Links 1828.09 24.12.20 23.12.21 150.00 935.29 1828.09 1125.29 E/W-5.00 4.90 4.80 4.60 0.00 0.00 0.00 0.00 Feb-22 Work in progress.
Asthan) Road in Km 0.00 to 5.00 (Total 19.08.2019 Pvt. Ltd. GSB-5.00 4.90 4.80 4.10 Work disturbed due to Temporary
Length - 5.00 Km) for the year 2019-20 9334136611, WMM-5.00 Encroachment. Pole shifting work in
(EPC) broadwaylink@redi DGBM-5.00 progress.
ffmail.com BC-5.00

39 Samastipur W/S OF JANDAHA TO PATORI ROAD NABARD 2.8 417.5 7532 (S) Kumar India 376.82 09.02.22 08.08.22 42.28 376.82 42.28 E/W-2.80 1.00 2.60 0.60 0.20 2 Aug-22 Work in progress
VIA ABDULLAHCHAK CHOWK 2018- 19.08.2019 Engitech Pvt. Ltd. GSB-2.80 0.00 0.00 0.00 0.00 0
19. WMM-2.40
DGBM-2.40
BC-2.40
DLC-0.40
PCC-0.40
CD-3

40 Samastipur W/S OF MUKTAPUR-WARISNAGAR- State Plan 23.3 4000 7373 (S) Broadway Links 3506.64 22.09.20 21.03.22 679.03 655.72 3506.64 1074.08 E/W-23.27 17.50 17.80 11.50 5.50 0.00 3.80 0.00 Mar-22 On Schedule/Work in progress.
BHADOGHAT-HATHAURI ROAD IN 09.08.2019 Pvt. Ltd. GSB-23.27 17.50 17.50 11.00 5.50 3.80 DLC-5.50
KM 00 TO 23.300 (TOTAL LENGTH - 9334136611, WMM-16.248
23.30 KM) FOR THE YEAR 2019-20 broadwaylink@redi DGBM-16.248
ffmail.com BC-16.248
DLC-7.024
PCC-7.024
CD-3

41 Samastipur W/S OF KOTHIYA GANDHI CHOWK NABARD 7.75 1877.98 8570 (S) Sona Infracon Pvt. 1990.44 14.07.20 13.07.21 1642.47 417.37 1990.44 1930.80 E/W- 7.50 7.50 7.50 6.90 6.90 6.64 0.51 0.00 April-22 HL Bridge Foundation pile
TO BANGRA HAAT (VIA BACH 17.09.2019 Ltd. 28.08.21 GSB- 7.50 7.50 7.50 6.90 6.64 6.64 0.51 work complete.
CHOWK, SARSAUNA MUNNICHAK) sonacon@gmail.co (45 days) WMM- 6.99
Substructure Completed.
ROAD UNDER SBD FOR YEAR 2018- m DGBM- 6.99
2019. 7004285055 BC- 6.99
Superstructure in progress.
DLC- 0.51 Revised estimate sanction lt.no-
PCC- 0.51 2484, dt-30.11.21 for Rs.
HLBride 24M-1 2222.42 lacs.
Pole Shifting work in
Progress.
42 Samastipur W/s of Indrawara -Karikhbaba Plan 13.1 2181.68 4902(S) LOA issued.
Mandir to Maricha chowk path (via 29.08.20
Rajkiya Mela Kewal Baba Ashthan
and Darba) road

42 Samastipur 13 129.174 24488.95 11215.84 3819.63 12476.97 10838.87 13.60 13.60 12.40 12.40 12.40 1.18 2.00
Total

43 Rosra Widening and Strenthening of Road from State Plan 6.67 1433.43 1164 (s) broadway links pvt 1102.55 29.05.2020 28.05.21 681.92 988.00 17.11.21 1102.55 988.00 0 E/W-6.67 6.67 6.67 4.82 4.82 4.82 1.738 11 Jam-22 Work in progress. Descope proposal for
Basariya, N.H. 28 to Sarairanjan, N.H- 31.03.2019 ltd. GSB-6.67 6.67 6.67 4.82 4.82 4.82 1.738 11 1HP Culvert has been sent to S.E. vide
103 via Ramnagar Chowk (Bella-Megh WMM-4.932 letter no. 1350 we dated 14.12.2021.
Chowk), Jhakhra, Sarairanjan, Saraiya, DGBM-4.932
Morwa under Road Division, Rosera BC-4.932
from ch. Km. 5.600 to 12.270 for the year DLC- 1.738
2018-19. 5 PQC-1.738
HP-12
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
44 Rosra Widening and Strengthening of Rosera- State Plan 21.7 4871.86 3033 (s) Raj Kumar Singh 4052.915 01.06.2018 31.12.20 3310.10 3328.71 16.12.2020 4052.92 3328.71 E/W-21.46 21.46 20.49 14.60 14.65 14.50 5.71 23 May-22 Work in progress.
Mabidhala-Saharachiya-Mangalgadh- 30.07.2017 Raja GSB-20.49 21.46 20.49 14.60 14.45 11.50 5.50 23
Kaale-Rajghat-Satighat Road in Km. 00 Construction.Pvt.Lt WMM-14.80
to 21.700 (Total Length- 21.700 Km.) d, Patna DGBM- 14.80
For the Year 2016-17. SDBC-14.80
DLC- 5.705
PQC-5.705
HP-20
Box Culvert-5
Mastic- 0.90

45 Rosra Widening and Strenthening of Gadhpura CRF 14 4102.17 1846 (s) Rambrat sharma 3318.26 16.12.2019 13.09.21 1227.33 2078.00 08.11.21 3318.26 2078.00 0 E/W-14.00 12.87 12.87 8.80 8.80 8.80 4.00 13 May-22 Work in progress. E.O.T. has been
to Sakhwa Road in Km. 0.00 to 14.00 21.02.2019 electric works Pvt. GSB-14.00 12.87 12.87 8.80 8.00 8.00 4.00 13 granted upto 31st May 2022. Proposal
under Road division, Rosera (Total Ltd WMM-9.01 for descoe has been sent to C.E. vide
length- 14.00 km.) for the year 2018-19 DGBM- 9.01 S.E. letter no. 1440 Date. 13.08.2021
including H.L. Bridge (3 X 12 M) under BC-9.01
CRF Scheme DLC- 4.990
PQC-4.990
HP-10
Box Culvert-5
HL Bridge-1
Angular Drain-4.9

46 Rosra Widening and Strenthening of Road CRF 14.7 3664.92 1846 (s) Rambrat sharma 3343.36 16.12.2019 13.09.21 1450.75 2101.00 10.09.2021 3343.36 2101.00 0 E/W-14.64 14.30 14.30 10.50 0.00 0.00 3.70 6 May-22 Work in progress. E.O.T. has been
from Dalsinghsari to Shahpur under Road 21.02.2019 electric works Pvt. GSB-14.64 14.30 14.30 10.50 0.00 0.00 3.70 6 granted upto 31st May 2022.
division, Rosera from ch. Km. 0.00 to Ltd WMM-10.865
14.710 for the year 2018-19 including DGBM- 10.865
H.L. Bridge (3 X 14 M) under CRF BC-10.865
Scheme DLC- 3.70
PQC-3.70
Box Culvert-3
HL Bridge-1
Angulardra-3.7
HP-9

47 Rosra SH-55 ,Angarghat to Kalichowk- RWD 10.5 616.88 4981 (s) Sidhivinayak 533.79 27.12.21 26.06.22 145.00 533.79 135.00 E/W-10.50 1.50 2.70 3 26.06.22 Work in progress.
Dalsinghsarai via Chaita ,kerai road State Plan 01.09.2020 GSB- 0.50 2.00 3
6.50 to 17.00 WMM-0.22
DGBM-7.00
BC-7.00
DLC-3.50
PQC-3.50
HP-5

48 Rosra Hati (SH-56) to Pipra Ghat road 3.95 RWD 2.25 962.3 5186 (s) Sidhivinayak 1013.13 27.12.21 26.06.22 24.07 1013.13 24.07 E/W-2.25 0.70 26.06.22 Work in progress.
to 6.20 State Plan 09.09.2020 GSB-2.25 0.50 2 no. Box culvert work in
WMM-2.25
progress.
DGBM-2.25
BC-2.25
Box Culvert-5

48 Rosra 6 69.82 15651.56 6670.10 8664.78 13364.01 8654.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
49 Benipur Ujan (PWD Road) to Kaithbar-Lagma- State Plan P 21.075 5542.35 9782 (S) RKS Engicon Pvt. 4939.40000 19.03.2018 18.01.2020 (C) 3154.93 473.90 29.10.21 4643.03 3628.83 49.394 E/W - 21.075 20.00 19.40 12.50 12.20 12.20 6.27 9 28.02.22 Work in progress
Kakodha-Machauta-Lalapatti-Parrari- 02.12.16 Ltd. 18.03.2025 (M) 29.08.19 GSB - 21.075 20.00 19.40 12.50 12.20 12.20 6.27 9 3 nos. approach slab in progress.
Tumaul-Ghanshyampur Road (CMBD) WMM - 14.80
DBM - 14.80
SDBC - 14.80
PCC - 6.275
CD - 30 No.

50 Benipur Const. of Kasraur Middle School to State Plan P 6.78 1383.85 9784(s) Sai Engicon Const. 1127.23800 13.02.2018 12.02.2019 (C) 617.53 80.00 22.01.2021 1018.78 697.53 5.64 E/W - 6.75 6.65 6.20 3.80 3.80 3.80 2.05 5 31.01.22 Work delay due to encroachment
Harsinghpur CRF road via Narm Chowk 02.12.16 Pvt. Ltd. 12.042024 (M) 5.64 GSB - 6.75 6.65 6.20 3.80 3.80 3.80 2.05 5
(CMBD) 31.01.2021 26.12.18 WMM - 3.81
(EOT) 09.01.20 DBM - 3.81
SDBC - 3.81
PCC - 2.94
CD - 5 No.

51 Benipur Balance Work of CMBD Based road MDR P 3.10 998.28 10347(s) Keshav const. Pvt. 699.27590 25.06.2020 24.12.2020 176.69 162.04 16.12.21 699.28 338.73 E/W - 3.10 2.40 1.07 2.10 1.70 1.70 0.70 28.02.22 Work in Progress
contract for the construction & State Plan 22.12.16 Ltd. GSB - 1.075 2.40 0.80 1.90 1.70 0.00 0.70
maintenance of Biroul Singhia via Pipara WMM - 2.102
Road (Singhia - Hirni Road) (Length - DBM - 2.40
3.10 Km SDBC - 2.40
DLC - 0.70
PQC- 0.70

52 Benipur Widening and Strengthening of RWD P 20.80 24304.42 7025(s) Bhartia – SRE (JV), 17500.000 22.10.2019 01.01.2022 4100.12 2349.26 09.12.21 13125.00 6449.38 E/W - 18.00 16.50 1.10 0.235 10 21.07.2022
H.L Bridge
Kusheshwar Ashthan (SH-56) to Pholtora State Plan 11.09.18 C/o Bhartia Infra GSB - 17.62 12.60 0.00 0.00 10
Foundation-29No. Completed & 1
Ghat Road in Km 0.00 to 20.80 for the Projects Limited WMM - 16.21
No. Progress
year 2019-20 DBM - 16.21
Sub Str.- 28No. Completed & 01 No.
(EPC Mode) BC - 16.21
in Progess
PCC - 1.40
H.L. Bridge-30No. Super Str.-23 No. Completed & 05
6
CD - 10 No. No. in Progress
CD Work Completed upto Deck Slab.
Work in Progress
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
53 Benipur IRQP Work of Bahera Bazar to Katwasa State Plan P 10.835 911.91 8651(s) Vidhyarthi 923.83854 13.02.2020 12.02.2021 729.47 81.62 02.07.21 923.84 811.09 E/W - 10.835 9.50 2.00 5.90 5.90 3.77 31.01.22 Mastic Work 0.5 km Completed
Road in km 0.00 to 10.835 in Darbhanga 19.09.19 Construction GSB - 2.20 9.50 2.00 5.86 5.86 3.71 Work Delay due to Encroachment
District for the year 2019-20 Private Limited DBM - 6.10
BC - 6.10
PCC - 4.00
DLC - 4.00
Mastic - 0.735

54 Benipur Construction of RCC Box Culvert of Size Plan Brdge P 1/87/0 163.56 346 (s) Keshav Contractor 174.04254 19.02.2020 18.11.2020 74.97 0.00 15.12.2020 174.04 74.97 28.02.22 Foundation work & Sub Structure
1/87/0 in 5th km of Putai – Ijarhatta – 19.01.19 Pvt Ltd. Super Structure Completed and
Milki Road for the year 2018-19 Approach Work in progress.

55 Benipur Widening & Strengthening of Supaul to State Plan P 12.220 3496.99 10549(s) Broadway Links 3270.01200 20.07.2020 19.03.2022 241.91 134.77 13.03.2021 2993.50 376.68 E/W - 12.220 8.90 8.50 0.00 0.00 0.00 2.10 4 30.06.22 Work in Progress
Bauram Road in km 0.00 to 12.20 under 10.12.19 Pvt. Ldt GSB - 11.975 8.90 5.80 2.00 1
Road Division Benipur for the year 2019- WMM - 7.805
20 DBM -7.851
BC - 7.851
DLC - 4.124
PQC - 4.124
CD -21 Nos

56 Benipur Widening and Strengthening from Single NABARD P 21.754 7630.04 1786(S) Bharatia Infra 7999.77100 11.12.2020 10.12.2021 400.00 2614.38 15.01.22 3999.85 3014.38 E/W - 21.66 18.40 14.55 6.55 0.00 0.00 7.20 10 10.12.2022 Drain-8.46 km Completed
lane to Intermediate lane of Shankar 21.02.19 Project Ltd GSB - 21.60 18.40 13.67 5.84 6.90 10 E/W, GSB, WMM, PQC, Drain, CD,
Lohar (SH-88) to Sisauni (SH-56) Road WMM - 12.355 Return wall & HL Bridge work in
in Km 0.00 to 21.754 Km for the year DBM -12.355 progress
2019-20 (EPC Mode) BC - 12.355
DLC - 9.399
PQC - 9.399
Drain - 10.519
H.L Bridge - 2Nos
CD -17 Nos

57 Benipur Rosera-Mabbidhala-Sarhachiya- RWD 8.400 3956.14 5013(s) Sai Engicon Const. 3762.62000 10.12.21 09.01.24 E/W-8.40 E/W & 1 no. CD foundation cutting
Mangalgarh Kale-Rajghat-Satighat State Plan dt-01.09.20 Pvt. Ltd. GSB-8.40 in progress.
road WMM-5.86
DBM-5.86
BC-5.86
DLC-2.54
PQC-2.54
CD-10
HL Bridge-2

58 Benipur W&S work of Hati (SH-56) to Pipra road Plan P 3.950 2386.11 4909(s) Sathi Const. 1798.75000 16.12.21 15.05.23 E/W-3.95 E/W, CD-2 no & HL Bridge work in
29.08.20 GSB-3.77 progress.
WMM-3.52
DBM-5.86
BC-5.86
DLC-2.54
PQC-2.54
CD-7
HL Bridge-1

59 Benipur IRQP work of pohhadi bela to pali road RWD P 3.715 322.500 7493(S) Sanjeev 318.259 04.09.2020 03.03.2021 0.00 74.50 23.03.21 318.26 74.50 9.457 E/W - 3.715 3.00 0.70 0.20 2.70 2.70 0.70 28.02.22 Work in Progress
in km 0.0 to 3.715 in Darbhanga District State Plan 16.08.19 Construction 06.04.21 GSB - 1.015 3.00 0.70 0.20 2.70 2.70 0.00
under Road Division, Benipur for the WMM - 0.20
year 2019-20 DBM -2.70
SDBC - 2.70
DLC - 1.015
PQC - 1.015

59 Benipur Total 11 112.629 51096.15 9495.62 5970.47 27895.57 15466.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00

60 Chapra Widening & Strengthening from (Single State Plan 20.25 6760.71 8530 (S) Banshidhar 5695.15 05.05.20 04.08.2022 897.76 1247.84 02.09.2021 2987.32 2400.93 E/W - 20.25 17.00 17.00 16.00 9.00 0.00 4.75 19 04.08.2022 work is in Progress. HP Culvert 5
Lane to Double Lane) Manjhi to Barauli 16.09.2019 Construction GSB - 20.25 15.00 16.00 16.00 0.00 0.00 4.75 17 Nos. completed. In km 10 Deck
(SH-96) from (Km- 0+000 to 20+250) for WMM - 15.023 Slab Completed of HL Bridge, In Km
the year-2019-20 DGBM-15.023 5 Pile work in progress of HL Bridge
BC - 15.023
PQC - 4.745
Box Culvert - 20
HLB- 3
HP - 5

61 Chapra W/S work of Chapra-Madhura main road NABARD 18.400 4298.26 6613(s), dt. Maruti Enterprises 4244.63 29.06.2019 28.03.2021 3497.51 622.55 11.06.2021 4204.63 4120.06 GSB - 16.968 16.80 16.97 16.97 16.97 16.97 1.43 6 31.05.22 Road work Complete. 1 Span Deck
to NH-102 Raipura road via Hasanpur, 28.08.18 WMM - 16.968 16.80 16.97 16.97 16.97 16.97 1.43 6 Slab completed and Second span &
Husepur, Devi Asthan Mund, Tarwar DGBM - 16.968 third span deck slab shuttering work in
Basdih Road SDBC - 16.968 progress. Deck slab casting on 8th april-
DLC - 1.43 22
PQC - 1.43
EW - 18.40
CD - 6, HLB-1
7
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
62 Chapra Construction of Approach road of Lok Urban Road 1.100 667.41 Letter No J.K. Engicon Pvt 444.04 22.01.2019 21.04.2019 0.00 0.00 -- -- 0.00 E/W - 1.10 0.60 0.20 -- -- -- -- -- Prepectual lease work in progress. E/W
Nayak Jai Prakash Narayan Smriti 791(E), Ltd. GSB - 1.10 0.00 0.00 started in plain area and GSB started in
Bhawan cum Library Sitab Diyara to dt. 15.02.18 WMM - 1.10 campus.
Main Road in Km 0 to 1.10 for the year DGBM - 1.10
2017-18 BC - 1.10

63 Chapra Sonepur - Darihara - Rewaghat Road (0 State Plan 21.00 4081.27 7081 (S) Narsingh 3530.67 02.11.2017 28.09.2020 2248.88 273.88 06.03.2021 3015.66 2619.66 12.81 E/W - 21.0 16.98 21.20 21.00 21.00 19.00 -- -- 28.02.2022 with LD imposed vide letter no 1742 dt.
to 21.0 Km) Under CMBD for the year 02.09.16 Construction GSB - 21.0 16.98 21.20 21.00 21.00 15.00 EOT 29.09.2020, Rs. 12.81 Lakh. Work
2016-17 WMM - 21.0 stoped.
DGBM - 21.0
SDBC - 21.0
(Paver Block- 21.0
sanctioned on
29.09.2020)

64 Chapra Improvement work from Chapra- MDR 6.480 1015.04 8791(s), dt. Sourav Raj 867.75 19.05.2020 18.06.2021 434.48 306.96 17.08.21 867.75 791.44 E/W - 6.48 -- 6.48 -- -- -- 6.48 28.02.22 3 Nos. Box Culvert completed and 1.40
Sonepur Road (Gola Bazar) to Chapra State Plan 25.09.19 GSB - 6.48 6.48 6.48 drain work completed. & rest drain
sonepur Road (Dudhaila More) Via DLC - 6.48 work in progress.
Chhoa Mill, Screw Pile Bridge , PQC - 6.48
Najarmira, RaharDiyara, Balli Tola, Box Culvert - 3
Sahpur Diyara, Hariharnath- Pahlejaghat Extra Drain Work -
and Dudhaila bazar Road (Total Length- 3.0
6.480 km) for the year-2019-20

65 Chapra IRQP work form Ekma to Mashrakh RWD 31.600 3156.70 5029(s), dt. J.K. Engicon Pvt 2498.74 04.06.2021 03.12.2022 0.00 800.00 28.07.2021 666.32 380.19 DGBM - 29.529 5.00 4.00 -- 17.00 15.00 4.50 8 03.12.2022 Work in Progress
Road via Shajitpur from (Km 0+000 to State Plan 01.09.20 Ltd. B.C. - 29.645 0.00 0.00 14.00 12.00 4.00 8 In HLB 3 nos. HLB pile work
31+600) Under Chapra Division for the PQC - 1.951 completed and in 1 nos. HLB pile cap
year 2019-20 HLB - 3 complete, Work in progress.
Box Culvert - 17
HP - 13

66 Chapra W/s Work & Maintenance work State Plan Plan 6.90 1825.53 914(S) Hemant Kumar 1253.95 10.03.2017 09.12.2017 1420.02 1770.01 1329.07 -- E/W- 4.80 4.80 4.80 2.83 2.83 2.83 7.00 09.12.2017 De-Scope proposal submitted to S.E.
Hariharnath - Pahleja Ghat RCD Road to Dt 06.02.17 Singh GSB- 6.90 vide letter no 1850 dt 15.10.2020
Gangajal Road in Km 0 to 6.90 for 2016- WMM - 4.170
17 DGBM- 4.170
SDBC - 4.170
PQC - 2.730
HP Culvert - 10

66 Chapra Total 7 105.73 11742.94 8498.66 3251.23 13511.69 11641.36 4.80 4.80 2.83 2.83 2.83 0.00 7.00

67 Gopanganj Widening & Strengthening work in Km. CRF 41.15 8872.76 10827 (S) Sona Engicon Pvt. 7988.19 20.11.2018 19.11.2020 4684.51 332.88 28.08.21 6500.00 6539.72 7988.192 E/W-41.715 20.00 40.00 34.00 33.00 24.00 6.72 27 Mar-22 Super Structure is in Progress in HL
0.00 to 41.715 (Total length 41.715 km) Dt. 24.11.17 Ltd. COVID/ Dt. 03.09.21 GSB-41.715 20.00 40.00 34.00 30.00 24.00 6.72 27 Bridge.
WMM-35
of Mairwan Kuchaikot Road including EOT- 5000000
DBM-35
Construction of RCC Drains & 3Nos 15.09.2021 Dt. 22.05.21 BC-35
H.L. Bridges for the year 2017-18 DLC-6715m
PQC-6715m
Drain-2x6715m
CD-27 Nos
HL Bridge-3

68 Gopanganj Widening & Strengthening of NH- 101 CRF 11.988 2976.02 1846 (S) Bholeshankar 2972.82 08.06.2020 07.06.2021 1000.30 1650.44 01.09.21 2500.00 2650.74 - E/W-11.988 10.00 11.85 9.50 9.50 9.50 2.158 22 Feb-22 Road Furniture & approach work in
Babar Ali Petrol pump to Sonwalia Dhala Dt. 21.02.19 Erection and COVID / EOT- GSB-11.988 10.00 11.85 9.50 9.00 9.50 2.158 22 progress.
WMM-9.611
via Sisai-Safiyabad-Dharambari-Miratola construction Pvt. 07.09.2021
DBM-9.611
–Pakadi More under Baikunthpur Block Ltd BC-9.611
of Gopalganj District for the Year 2018- DLC-2.58m
19 PQC-2158m
Drain-2259m
CD-24 Nos

69 Gopanganj Widening & Strengthening of Manjhi- State Plan 5.99 2525.12 8530 (S) Sona Engicon Pvt. 2209.35 11.06.2020 10.06.2021 950.53 1025.17 16.08.21 2000.00 1975.70 - E/W-5.99 5.75 5.99 4.99 4.99 4.99 1.00 10 Jan-22 Road work complete & flank work in
Barauli Road from km 54.418 to km Dt. 16.09.19 Ltd. COVID/EOT- GSB-5.99 5.75 5.99 4.99 4.99 4.99 1.00 10 progress
WMM-7.532
60.358 and km 62.168 to km 62.218 10.09.2021
DGBM-4.99
(Total length 5.99 km)With Construction BC-4.99
of HL RCC Bridge (2 x 16.00 M ) for PQC-1.00
Year 2019-20 CD-10 Nos
HL Bridge-1 No

70 Gopanganj Construction of Boundry Wall of Govt. State Plan - 78.32 2123 (S) Sushma Singh 82.12 10.03.2021 09.11.2021 0.00 67.68 17.08.21 80.00 67.68 - Length-1060m - - - - - - - Mar-22 Encroachment Removal & Demarcation
Land Adjacent to I.B. Dumariya ghat 16.03.2020 of Departmental land is in process.
Gopalganj for Year 2019-20 Boundry wall completed except
encroachement part.

71 Gopanganj W&S with Maintenance work of MDR P 7.705 2618.71 7967(s) Saj Infra Pvt. Ltd. 2077.00 12.04.18 30.06.20 940.59 241.81 22.05.21 1500.00 1182.40 41.40 E/W-7.705 6.50 5.80 5.20 5.20 5.20 0.15 13 Mar-22 Drain-2.20
Bhagipatti-Samaur-Bankata via Kateya State Plan dt-05.09.17 Dt-15.03.21 GSB-7.705 6.50 5.80 5.20 5.20 5.20 0.15 13 Contractor debarred & Contractor has
Bazar km 0.0 to Km 7.705 for the year 09.12.20 WMM-5.435 requested to complete the work by Mar-
2017-18 18.09.20 BM-5.435 22 vide his letter no-SIPIL/RCD-034 dt-
25.07.20 SDBC-5.435 20.08.21
PCC-2.27 Bituminous work almost completed.
CD-17
8 Drain-2.27
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
71 Gopanganj 5 66.833 17070.93 7575.93 3317.98 12580.00 12416.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
72 Hajipur Widening and Strengthening of NABARD 5054 14.475 2800.000 21 (S) Agency - 2628.52379 05.09.2020 04.03.2022 1329.05 956.75 31.08.21 2628.53 2150.00 E/W-14.475 14.00 14.00 10.20 8.00 8.00 3.70 31 March- GSB, WMM, HP Culvert, PQC &
Chaksikandar - Kariho Chaur - 03.01.20 SHRISTI GSB-14.415 13.00 13.00 10.00 4.70 4.70 3.70 24 2022 Bituminous work in Progress. Estimate
Mirzanagar - Mahua Road in km 0.00 to DEVELOPERS WMM-10.632 for Revised TS submitted to CE(N)
14.475 (Total Length -14.475 km) For PVT. LTD. DLC-3.783 vide SE lt No-943 dt-14.08.21
the Year 2019-20 (NABARD) Krishi Utpadan PQC-3.783 Drain-0.40
Bazar Samiti, Katra DBM-10.632 RCC Box Culvert-2 in progress.
Bazar, BC -10.632
Patna City Box Culvert-13
Email- HP Culvert -24
shristideveloperssh RCC Drain-0.700
aikhpura@gmail.co
m
Mob-9523096930
73 Hajipur Paharpur-Murgiya Chowk Bhagwanpur NABARD 5054 10.3 1768.05 7162 (s) KHOKHAR 1452.79165 14.03.2020 13.02.2021 907.12 371.52 29.11.21 1452.79165 1320.00 E/W-9.800 9.00 9.74 8.57 5.57 8.57 1.17 4 Feb-22 Road work completed, Ancillary work
Station Road 02.08.19 INFRASTRUCTU + GSB-9.742 9.00 9.74 8.57 5.57 8.57 1.17 4 in Progress
RE PVT LTD 90 Days WMM-8.572 Estimate for Revised TS submitted to
13.05.2021 DBM-8.572 CE(N) vide SE lt No-1269 dt-30.10.21
B.C - 8.572
PQC-1.170
Box Culvert- 01
HP Culvert - 04

74 Hajipur W&S work of Circuit house to Ambedkar MDR P 3.00 643.87 8792(s) Saran Const. 568.17 27.08.21 26.06.22 149.25 15.11.21 29.00 125.00 E/W-3.00 1.40 1.40 1.10 June-22 Work in progress.
Balika Chhatrawas road from km 0.00 to State Plan 25.09.19 GSB-3.00 1.40 1.40 0.80 Drain-870m
3.00 (Total Length 3.00 km) (with DLC-3.00
Electrical Utility Shifting) PQC-3.00
Drain-1400m
B. Culvert-1
HP Culvert-3

75 Hajipur W&S of Rustampur-Virpur-Rupas- RWD 5054 22.90 5744.84 5007(s) Shristi Developers 4897.58 27.08.21 26.08.23 241.09 120.00 E/W-22.90 7.00 7.00 10 Aug-23 Work in progress
Gayaspur road State Plan 01.09.20 Pvt. Ltd. GSB-22.90 6.00 6.00 8
DLC-22.90
PQC-22.90
B. Culvert-34

76 Hajipur Jandaha (NH-103) Patori Road in k 0.00 NABARD p 6.2 1205.37 8115 (s) A.K Construction 1211.21910 19.05.2020/ 18.05.2021 637.69 368.72 27.10.21 1211.21910 1030.00 E/W-6.20 6.20 6.20 4.88 4.80 4.80 1.30 7 Feb-22 Road Work completed. Utility shifting
to 6.20 05.09.19 GSB-6.20 2.50 6.20 4.88 4.80 4.80 1.30 7 work in progress.
WMM-4..875 Drain-700m
DGBM -4.875 Paver block-600m
B.C-4.875
DLC-1.30
PQC-1.30
"Box Culvert - 1/22/0
- 01 Nos
1/33/0 - 01 Nos"
HP culvert - 06
RCC Drain - 700 m
Paver Block-700 m

77 Hajipur W/S of Shahid Beni Bhagat Chowk - State Plan p 3.2 882.58 8715 (s) Deo Construction, 871.1657 08.06.2020/ 07.02.2021 692.74 40.53 05.02.21 871.1657 714.28 E/W-3.20 km 3.15 3.15 0.00 0.00 0.00 3.15 1 Feb-22 Road work Complete
Chauhatta - Yusufpur - Rajput Nagar to 23.09.19 Dismantling-3.20 3.15 3.15 3.15 1 Show Cause Issued.
Paswan Chowk Road (Total Length = GSB - 3.20 Estimate for Revised TS sumitted to
3.20 KM ) for the year 2019-20 DLC- 3.20 CE(N) vide SE lt no-825 dt-14.09.20
PQC- 3.20 Drain-1.65
U. shifiting-3.20
Drain- 3.00 km
HP Culvert-1

78 Hajipur Dighi Kala yadav Dwar to Adalpur Road Plan p 2 463.64 8217 (s) Ripunjay Kumar 482.07422 19.05.2020 18.11.2020 232.27 69.11 25.03.21 482.07422 320.00 E/W-2.0 2.00 2.00 1.40 1.40 1.40 0.60 Mar-22 Work in progress.
in 09.09.19 GSB -2.0 2.00 2.00 1.40 1.40 1.40 0.60 Drain-0.40
km 0 to 2.00 WMM-1.40
DBM -1.40
B.C - 1.40
PQC-0.600
Drain-1.2
1000 mm dia HP
Culvert - 3 Nos

79 Hajipur Widening and Strengthening of Jouhari State Plan 5054 0.9 130.93 4824 (S) Agency - 122.38871 06.03.2021 05.07.2021 18.01 55.74 14.06.21 122.38871 70.00 E/W-0.900 0.90 0.90 0.30 0.30 0.30 0.60 Mar-22 Work in Progress
Bazar to D.M Awas Road from km 0 to 26.08.20 Gladiolus GSB-0.900 0.90 0.90 0.30 0.30 0.30 0.60 Estimate for Revised TS sumitted to
0.90 (Total Length 0.90 km) for the Construction WMM-0.300 CE(N) vide SE lt no-617 dt-23.08.21
year 2020-21 Pvt Ltd. PQC-0.6
DBM-0.3
BC-0.30
Mastic-0.6

9
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
80 Hajipur Lalganj Tinpulwa - Bhagwanpur Road MDR 5054 12.5 2988.49 8528 (s) Agency - 2484.27404 05.03.2020 04.05.2021 1245.07 365.48 30.07.21 2484.27404 1533.99 E/W-12.5 10.50 10.70 10.00 10.00 5.00 0.69 6 May-22 Work in Progress
State Plan 16.09.19 A.K Construction + GSB-12.40 10.50 10.70 10.00 10.00 5.00 0.69 6 Show cause Issued
At-Bhramb Road 90 days WMM -11.72 RCC Box Culvert-4 no. in progress
Ambikapur, Dist- 04.08.2021 DGBM - 11.72
Surguja, B.C - 11.72
Chhattishgarh, Pin- DLC-0.69
497001 PQC-0.69
Email- "Box Culvert-
ajayagrawal.amb@ 1/22/0 , 1/33/0 &
gmail. 2/33/0 - 14 No"
com RCC Drain 0.400
Mob-8770737550

81 Hajipur W/S Work of Bajitpur - Nirpur - patepur RWD 5054 6.35 1208.87 2274 (S) AM/S Ram jee 1208.129 26.12.2019 25.12.2020 488.30 280.85 18.11.21 1208.129 774.00 E/W-6.350 5.20 5.20 5.20 4.80 0.00 0.00 8 Mar-2022 work in Progress
Road State Plan 05.03.19 Singh & Co. + 90 Days GSB - 6.280 5.20 5.20 5.20 4.80 0.00 8 Show Cause Issued
25.03.2021 WMM-6.280
DBM - 6.280
BC - 6.280
Box Culvert- 09

82 Hajipur W/S work in Langri Pakar Ambara Road NABARD 5054 14.5 2653.44 5177(s) Rai Raj 2045.91000 02.02.19 16.05.2020 1192.82 249.65 27.11.21 2045.91000 1460.00 E/W-14.5 13.90 13.90 13.90 13.90 1.50 0.00 20 May-22 work in Progress
06.07.18 Construction Pvt, + GSB-13.9 13.90 13.90 13.90 13.90 1.50 20 Fine imposed but not implemented.
Ltd, 90 Days WMM-13.90 Letter issued for punishment in the
16.08.2020 DBM -14.5 light of contract.
SDBC-14.5 BC-1.00
HP culvert -22 No
Drain - 0.40
B. Culvert- 1 Nos

83 Hajipur IRQP work in - IRQP HLV Road Non Plan NP 37.2 3833.31 2284(S) BHARDWAJ 2421.75000 02.01.2019 01.03.2020 1777.02 100.31 05.02.21 2421.75000 1890.00 DBM-37.20 0.00 0.00 0.00 37.20 13.00 0.00 0.00 May-22 Work in Progress
21.03.18 CONSTRUCTION B.C-37.20 km 37.20 13.00 Fine inposed but not implemented.
Notice to Rescind issued.

84 Hajipur G.M Office – Adalpur Road State Plan P 0.362 116.56 8216(S) Bindhwashni 109.50945/ 11.02.20 / 10.08.20 69.66 0.78 30.06.20 109.50945/ 69.66 E/W-0.362 0.36 0.36 0.36 0.36 0.36 0.00 1 Work Completed
09.09.19 Construction GSB-0.362 0.36 0.36 0.36 0.36 0.36 0.00 1 Drain-35m
WMM-0.362
DBM-0.362
BC-0.362
H.P Culvert- 01
Drain-600 m

84 Hajipur Total 13 133.887 24439.95 8589.76 3249.78 2657.53 11576.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00

85 Siwan Widening and Strengthening of Manjhi- SH-96 5054 34.168 9456.30 8530 (S) Balwant Const. Pvt. 9101.70 09.09.20 08.9.22 3644.97 4258.79 28.02.22 9101.70 7903.76 0.00 E/W-34.168 10.50 34.16 28.86 25.00 25.00 5.35 27 Sep. 2022 WMM & CD 2 no. & HL bridge work
Barauli Road (SH-96) from km 20.25 to State Plan dt. 16.09.19 Ltd GSB-34.168 10.50 34.16 25.50 21.00 21.00 5.35 25 in progress
54.418 (Total Length-34.168) for the WMM-28.868
year 2019-20 under SBD DBM-28.868
BC-28.868
PQC-5.30
CD-30 No.
H.L. Bridge- 2

86 Siwan Widening & Strengthening work of RWD P 5.525 1324.13 5200 (S) Palak Infra Pvt. 1144.36 15.03.21 14.12.21 109.95 652.35 05.02.22 1144.36 762.30 0.00 E/W-5.52 4.61 4.61 4.31 4.31 4.31 0.30 7 Dec. 2021 DGBM, BC & 2 CD work in
Badlimore to Angauta Road Km. 0.00 State Plan dt. 09.09.20 Ltd, GSB-5.52 4.40 4.40 4.00 4.00 4.00 0.30 6 progress.
to 5.525 (Length- 5.525) including E/W, WMM-4.70
PQC, Road Sefety, Utility Shifting, DGBM-4.70
Paver Block and RCC Box Culvert BC-4.70
work under Road Division, Siwan for PQC-0.82
the year 2020-21 CD-11 No.

87 Siwan Widening & Strengthening work of RWD P 13.000 3376.26 M/S Brijendra 2866.61 18.05.21 17.11.22 5.79 159.08 30.10.21 2866.61 164.87 0.00 E/W-13.00 11.65(P) 11.35 3.25 0.00 0.00 0.00 0.00 Nov. 2022 GSB, CD-5 no & HL Br-1 in progress
Titra-Nautan-Jagdishpur Road Km. State Plan 5408 (s) kumar Singh GSB-13.00 10.50 9.80 0.00 0.00 0.00 0.00 0.00
0.00 to 13.00 (Length-13.00) including dt.17/09/20 WMM-11.00
Utility shifting and two HL RCC DBM-11.00
bridge (1x16m) & (2x14m) works BC-11.00
under Road Division, Siwan for the PQC-1.571
year 2020-21 CD- 19
HL Bridge-2

87 Siwan 3 52.693 10780.43 3760.71 5070.22 13112.67 8830.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total

10
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
88 Bettiah WIDENING & STRENGTHENING OF CRF 7.770 2615.39 Vide Lt No- M/S Naraini 2549.82 01.01.2020 31.12.21 1584.89 325.65 137.92 1910.54 E/W-7.767 7.77 7.77 6.40 6.40 6.40 1.36 16 Mar-22 Road Work Completed &
MAJHAULIA TO RAMPURWA ROAD 1846 (s) Nirman, Bettiah GSB-7.767 7.77 7.77 6.40 6.40 6.40 1.36 16 Super Structure Wrok Complete in HL
(SINGLE LANE TO INTERMEDIATE Dated- WMM-6.403 RCC Bridge Approach road work is in
LANE) IN KM 0.000 TO 7.767 FOR 21.02.2019 DBM-6.403 progress.
YEAR 2018-19 BC-6.403 EOT demanded by Contractor upto
PQC-1.364 31.03.2022 and EOT Granted by EE
CD-15 Nos half of demanded period up to
DLC-1.364 31.12.2021
Drain-1.40
HL RCC Br. 3x14m-
1No

89 Bettiah WIDENING & STRENGTHENING NABARD 10.200 5048.52 Lt No-2372, M/S Ujjain 3665.85 08.07.2019 22.07.2021 1735.92 1184.21 30.11.21 462.14 2920.12 E/W-9.94 9.94 9.94 9.00 9.00 9.00 0.00 May-22 3 Nos Sup Structure Work & 7
WORK of Chhotkipatti to Ramnagar (Via Dt-23.03.18 Engocon India Pvt. GSB-9.94 9.94 9.94 9.00 9.00 9.00 nos Sub Structure Work
Kapardhika) Ltd. WMM-9.94 Complete & 1 nos. super
DBM-9.94
structure in progress. Rest
BC-9.94
Drain-0.50
2Nos. Foundation work in
HL RCC Bridge progress
10x21m-1No

90 Bettiah Widening and Improvement of NABARD 25.173 5829.63 Lt No- Aditya Enterprises, 6182.72 13.02.2021 12.02.2023 329.36 2921.55 30.11.21 833.26 3250.92 E/W-25.173 0.00 19.00 10.00 3.50 13 Feb-23 HL RCC Br. Sub structure work
Narkatiaganj- Gaunaha-Manguraha Road 3111(S) Dt- Patna GSB-25.173 19.00 5.80 2.80 11 is in progress in 2x12m HL
including Bhitiharwa Ashram link road 08.03.2019 WMM-17.453 Bridge & 3 nos. CD work in
and Rampurwa Ashok Sthambh link road DGBM-17.453
progress. DLC/PQC work is in
(Km 25.173) for the year 2018-19 BC-17.453
PQC-7.62
progress in 500m. WMM work
DLC-7.62 done in 1st layer in 5.30 km
CD-16Nos
Drain-1.85
HL RCC BR 2x16m
HL RCC BR 2x12m
HL RCC BR 1x16m

91 Bettiah IRQP work of Narkatiaganj-Balthar MDR P 19.800 1413.32 Lt No- M/S Sona Engicon 1408.27 30.06.2021 29.06.2022 0.00 42.94 30.01 42.94 DGBM-14.64 0.00 0.00 0.00 3.50 0.00 0.00 Jun-22 Work in Progress
Road (Km-0.00 to 19.80) for the Year State Plan 4820(S) Dt- Pvt. Ltd. BC-14.64 3.50 Revised estimate at CE level.
2020-21 26.08.2020 PQC-4.90

92 Bettiah Construction of Indo-Nepal Border Road Indo Nepal P 26.500 38979.46 Lt No- M/S Ujjain 10161.37 08.07.2019 07.07.21 155.91 727.97 98.35 883.72 E/W-26.50 4.00 0.00 0.00 0.00 0.00 16 Dec-22 E/W is in progress in 8.5 KM, 4Nos CD
Project under Road Division Bettiah 1161(s), Dt- Engocon India Pvt. 06.10.22 GSB-26.50 4.00 15 work in Progress
From Madanpur to Shivrahi/Dumari Ch- 14.02.2017 Ltd. WMM-26.50 Subgrade work is in progress in 0.85km
0.00-26.50 DBM-26.50 & GSB Work in Progress in 1.60km in
SDBC-26.50 1st Layer.
PQC- EOT granted up to half of demanded
DLC- analysed period
CD-31
Drain-

93 Bettiah Construction of Indo-Nepal Border Road Indo Nepal P 28.450 M/S Ujjain 11978.50 08.07.2019 07.07.21 1277.98 632.42 208.52 1910.41 E/W-28.45 12.00 4.80 0.00 0.00 0.00 0.00 33 Dec-22 E/W is in progress in 8 KM & GSB
Project under Road Division Bettiah Engocon India Pvt. 06.10.22 GSB-28.45 11.50 4.70 30 Work is in progress in 1.70km
From Dumari to Harkatwa/Rupualia Ch- Ltd. WMM-28.45 3Nos CD work (3Nos Box Culvert) are
26.50-54.950 DBM-28.45 in progress
SDBC-28.45 Subgrade work in progress in 4.00km.
PQC- EOT granted up to half of demanded
DLC- analysed period
CD-95 Nos
Drain-

94 Bettiah Construction of Indo-Nepal Border Road Indo Nepal P 26.950 M/S Ganesh Ram 11120.19 15.07.2019 14.07.21 2274.27 685.52 163.04 2959.78 E/W-26.95 18.50 9.10 7.60 0.00 0.00 0.00 63 Dec-22 E/W 500m, GSB & WMM 200m and
Project under Road Division Bettiah Dokania 31.12.22 GSB-26.95 18.50 9.10 7.60 62 2Nos CD work are in Progress
From Rupualia to Bhangaha-01 Ch- WMM-26.95 EOT granted up to half of demanded
54.950-81.900 DBM-26.95 analysed period
SDBC-26.95
PQC-
DLC-
CD-88 Nos
Drain-

95 Bettiah Construction of Indo-Nepal Border Road Indo Nepal P 30.998 24698.42 Lt No- Sri Ram Enterprises 11608.82 14.06.19 07.07.21 1648.58 836.52 475.13 2485.10 E/W-30.998 22.00 6.80 0.00 0.00 0.00 0.00 6 Dec-22 GSB Work 5.80 km in Single Layer is
Project under Road Division Bettiah 1161(s) Dt- 31.12.22 GSB-30.998 22.00 5.80 6 in Progress
From Bhangaha to Dhutaha River Ch- 14.02.17 WMM-30.998 EOT granted up to half of demanded
81.900-112.898) DBM-30.998 analysed period
SDBC-30.998
PQC-
DLC-
CD-08 Nos
Drain-

95 Bettiah Total 8 175.841 78584.74 9006.90 7356.78 2408.37 16363.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00

11
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
96 Motihari Construction work of Harsidhi to Bankat CRF Plan 16.500 2237.00 8353(S) 1769.07 07.02.18 6.05.19 1589.70 50.00 22.10.21 1769.07 1640.00 176908.00 E/W-16.50 14.00 16.00 12.76 12.76 12.76 3.15 3 Mar-22 Work in Progress
road from 0.00 km to 16.500 km. for the 20.09.17 SaJ Infracon dt. 31.12.20 GSB-16.31 14.00 16.00 12.76 12.70 12.00 3.15 3
year 2017-18 Under C.R.F Project Inida WMM-12.76
(CRF) DGBM-12.76
SDBC-12.76
PQC-3.552
D.L.C.-3.552
C.D-3 Nos.
HP-6

97 Motihari Construction of road from IOCL dipo State Plan P 2.200 1481.51 9262(S) 20.06.19 19.03.20 543.51 510.85 " 1196.18 1054.36 - E/W-2.20 2.20 2.20 2.10 3 Mar. 2022 Agreemented work completed. Extra
Raxual to ICP Raxual via Railyard Raxual 06.12.18 Agency -Amber 1196.18 G.S..B.-2.20 2.20 2.20 2.10 3 Items i.e. Utility shifting, CD work &
under SBD for the year 2018 - 19 Infra Project Pvt. 22.06.2021 21.03.22 D.L.C.-2.20 drain work in progress.
(Plan) Ltd. 350.582 PQC-2.20
C.D.- 3
C.D.- 4
Box Culvert - 2
Drain - 0.600

98 Motihari Construction of Cement Concrete State Plan P 1.700 672.81 9106(S) 740.62 07.09.19 06.01.20 356.67 - " 740.62 356.69 - G.S.B.-1.70 1.70 1.70 - PQC work complete. Forclose of
Pavement (PQC) and Drain in KM-13 30.11.18 Agency -Vibha D.L.C.-1.70 1.70 1.70 agreement under process
(700m), 14 (500m, and 15 (500m) for Singh PQC- 1.70
Motihari-Chauradano road for the Scarifying- 1.70
year2018-19 Drain- 3600
(Non Plan)

99 Motihari Widening and Strengthening NH28A State Plan P 7.200 3614.97 2750(S) 24.03.20 23.09.21 813.67 624.67 " 2433.64 1438.34 - E/W-7.20 6.60 6.50 4.50 3.40 2.70 2.40 16 June-22 HL Bridge At Ch-4550 Deck Slab
Ramgarhwa Thana chowk to Piparpati 21.03.18 Agency -M.S. GSB-7.20 6.60 6.50 3.90 3.40 2.70 2.40 14 complete.
ghat in km 0.00 to 7.20 under SBD for Naraini Nirman 2732.84 WMM-4.484 HL Bridge At Ch-350- 22 Nos pile
the year 2018 - 19. DGBM-4.484 complete.
(Plan) SDBC-4.484 Drain-1.50 km
D.L.C-2.52
PQC-2.52
Culvt.-22 Nos
(H.P.-10, BC-12)
H.L. Bridge-2 No
Drain-2.60

100 Motihari Const. & upgradation of road & other Deposit 75.002 23859.52 6724(S) 06.05.13 05.07.15 9661.00 1468.47 " 21719.87 11129.47 - E/W-21.95 14.85 7.41 4.80 2.75 0.79 8 Dec-23 Work in progress
structure from Dhutaha River Bridge- Work 13.06.12 Agency-JKM Infra 21719.87 GSB-21.95 0.00 0.00 0.00 0.00 0.00 0
Guabari-Phulwaria Ghat at Lalbakia Structure WMM-21.95
River (Length-77.242 km in East DBM-21.95
Champaran (Motihari) District. SDBC-21.95
Ch-30.998 to 106.00 CD-15
(Indo Nepal)
Length- 75.00

101 Motihari Const. of Bhelahi Raxual road from km State Plan P 6.500 798.96 1043(s) 772.59 04.09.20 29.03.22 395.50 225.57 " 772.99 620.13 - E/W-6.50 7.70 7.70 7.70 7.70 6.50 Mar-22 Work in progress.
0.00 to 6.50 (RD-84 to Rd-105) (Plan) for 04.12.19 Agency-Barhonia GSB-6.50 6.50 6.50 6.50 6.50 6.50 Kerb Wall-6.50
the Year Engicon Pvt. Ltd. WMM-6.50
2019-20 DGBM-6.50
BC-6.50
Kerb-6.50

102 Motihari Construction of Raxual Adapur State Plan P 23.875 3919.73 3081(S) 21.03.20 19.09.21 1249.86 550.14 " 2969.11 1800.00 - E/W-13.00 13.00 13.00 13.00 13.00 0.00 June-22 Work in progress
Chauradano road on Ghorasahan branch 07.03.19 Agency - Prabhu 3340.25 G.S.B.-13.00 0.00 0.00 0.00 0.00 Kerb wall-10.00
Canal Service road from RD- 105 to Rd- Nath Prasad W.M.M.-13.00
185 (Km 0.00 to 23.875) for the year Thekedar DGBM-13.00
2019 - 20. B.C- 13.00
Kerb-13.00

103 Motihari Wedening & Strengthening of left out State Plan P 4.450 1308.54 10626(s) 04.03.2021 03.12.2021 608.95 " 1221.20 608.95 - PQC- 1.15 0.00 0.33 3.00 3.00 3.00 0.70 April-22 Work in progress.
portion of NH-28A (Laxmipur to 12.12.2019 Agency -Sona 1465.45 G.S.B.-1.15 0.33 3.00 3.00 3.00 0.00 Drain-0.05 km
Railway Crossing Raxaul City from-0.00 Engicon Pvt. Ltd. W.M.M.-3.30
to 4.45 KM) year 2019-20 DBM-3.30
B.C- 3.30
Drain-1.20

104 Motihari Widening and strengthening from (Single NABARD P 26.825 5848.69 1943(S) dt. 26-07-2021 25.01.2023 300.00 - 5404.15 300.00 - E/w-26.825 5.00 1.20 0.37 Jan-23 Work in progress
Lane to Intermediate Lane) of Kotwa to 24.03.2021 Agency-Sona 5404.15 (18 Month) GSB-26.653 5.00 1.02 0.18
Sahebganj via Bajhia +2 School Rajpur Engicon Pvt. Ltd. WMM-21.278
Khora from (Km 0.00 to 26.825) for the DGBM-21.278
Year 2020-21 BC- 21.450
PQC- 5.375
Box Culvert.-10 Nos
H.P.-4 Nos
H.L.R.C.C.-1 Nos
Box Culvert

12
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
105 Motihari Improvement work of Gaighat to Harsidhi Non Plan NP 11.755 1426.580 4864(s) M/S Progresive 1546.930 17.11.21 16.09.22 E/w-11.755 Sep-22 Work in progress
via Singha Pakaria in km 0.00 27.08.20 Const. Company GSB-11.755
WMM-5.737
DGBM-5.737
BC- 5.79
PQC- 5.705
DLC-5.755
H.P.-15 Nos
(1000mm)

106 Motihari Belwatiya Janta Chowk to Raghunathpur NABARD NP 8.750 3000.000 2225(s) Barhoniya Engicon 2196.680 31.12.21 30.12.22 E/w-8.75 1.25 Dec-22 Work in progress
Bazar Road Year 2020-21 19.03.20 Pvt. Ltd. GSB-8.75 0.00
WMM-6.55
DGBM-6.55
BC- 6.55
PQC- 2.20
RCC Box-13
H.P.-1 Nos

107 Motihari W&S of Chailaha (NH-28A) to Bela NABARD P 31.220 9325.14 1942(S) dt. Agency -Baba Sans 9506.69 08.10.2021 07.04.23 - - 9506.69 - E/W-30.735 2.30 2.30 3 April-23 Work in progress
Nahar Chowk (NH-28A) road via Ajagari, 24.03.2021 Const Pvt. Ltd. GSB-30.735 1.30 0.75 2
Siswania, Jatwa Pul, Kukurjari, WMM-26.456
Gamhariya, Chintaha, Phulwar, Nakardei, DGBM-26.456
Karmawa (Raghunathpur Bazar), BC- 26.456
Sutiharwa, Shrikhandi, Bheriharwa in PQC- 4.27
km. 0.00 to 31.22 (Total length 31.22 DLC-4.27
km.) for the year 2020-21 RCC B.C-41No.
H.P.-6 Nos
H.L.Bridge.-2No
Drain-8.54km

107 Motihari 12 215.977 35820.80 14609.91 4338.65 47733.52 18947.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
108 Muzaffarpur-1 Motipur-Baruraj Road (BR23RC-97) / RCPLWE P 5.9 897.707 5057(S) M/S Royal 804.35253 15.10.18 14.10.19 470.23 43.57 804.35253 513.80 E/W-5.73 4.50 4.50 4.00 2.67 2.77 1.70 Complete (1) Land dispute 1605 M, Work can
RCPLWE 02.07.18 Engineer,s GSB-5.73 4.50 4.50 4.00 2.67 2.77 1.70 not be done. Proposal for decoping is
WBM-5.40 submitted.
DBM-3.744 (2) Court order to pay compasation,
SDBC-3.801 Matter is under MJC.
DLC-1.986 3) Rewise estimate submitted for
PQC-1.986 Descoping Balance Work.
Mastic-1.789
Side Drain-0.20

109 Muzaffarpur-1 Muzaffarpur-Deoria Road (BR23RC- RCPLWE P 38.75 6064.134 5057(S) M/S Raj Kumar 4669.043 29.01.19 28.10.2020 2686.00 804.61 3800.00 3490.11 L.D. imposed Rs. "E/W-37.123" 36.80 36.80 35.60 33.00 18.00 0.99 4 May-22 Work in progress
100) / RCPLWE 02.07.18 Singh Raja Const. EOT given 78.37 lacs, Debar GSB-37.123 36.80 36.80 35.60 33.00 17.00 0.99 4 Drain-1.60
Pvt. Ltd. upto 30.11.21 vide Lt. No. 835 WMM-35.984
dt. 21.05.20 DBM-35.984
BC-36.360
DLC-1.139
PQC-1.139
Drain-4.8
CD-5 Nos

110 Muzaffarpur-1 Kanaujarghat-Dubha Road in 18th km RCPLWE P 2x12M 235.00 1663(S) Subham 211.53974 31.10.20 15.03.21 "Foundation-" Work descoped vide departmental letter
(BR23RC-115) / RCPLWE 15.02.19 Construction Sub Structure- no-8587(e) dt-22.12.20
(Length 2x12 M) Super Structure-
Appoach Road

111 Muzaffarpur-1 Malang Chowk to Muraul Road RCPLWE P 8.2 1128.7895 5057(S) M/S Ramjee Singh 843.630 08.01.19 04.10.2020 50.00 375.00 500.00 425.00 L.D. imposed Rs. E/W-7.751 5.50 5.50 5.00 4.10 4.10 1.10 5 Mar-22 Work in progress
(BR23RC-104) / RCPLWE 02.07.18 & Co. EOT given 16.87 lacs GSB-7.751 5.50 5.50 5.00 4.10 4.10 1.10 5
upto 05.01.22 WMM-7.526
DBM-7.526
SDBC-7.526
DLC-1.125
PQC-1.125
CD-5Nos

112 Muzaffarpur-1 Bochaha-Keotsa Road (BR23RC-109) / RCPLWE P 34.05 4967.665 5057(S) Rajendra Singh & 4652.48 21.01.19 20.10.2020 3074.00 1114.79 3900.00 4188.79 L.D. imposed Rs. "E/W-33.536" 33.50 33.50 29.20 28.50 28.50 4.30 2 Mar-22 Work in progress
RCPLWE 02.07.18 Brother EOT given 100.05 lacs GSB-33.536 33.50 33.50 29.20 28.00 24.70 4.30 0 Drain-0.60
upto 30.11.21 WMM-29.246
DBM-29.246
SDBC-29.595
DLC-4.3
PQC-4.3
Drain-0.74
CD-2 Nos
Mastic-0.252

13
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
113 Muzaffarpur-1 Bochaha-Keotsa Raod in 31.4th km RCPLWE P 5x22.84M 773.17 1663(S) M/S Royal 567.062 12.12.19 11.06.2021 280.50 137.47 425.00 417.97 L.D. imposed Rs. "Foundation-" Found. Sub Str. Sup Str Apr-22 Work in progress
(BR23RC-111) / RCPLWE 15.02.19 Engineer,s EOT given 5.64 lacs Sub Structure- 100% 100% 90%
(Length 5x22.84M) upto 31.12.21 Super Structure- (6/6) Well
Appoach Road

114 Muzaffarpur-1 Deoria-Baruraj Road in 14th km RCPLWE P 3x14M 449.13 1663(S) Shubham 483.280 05.11.19 02.02.2021 0.00 202.89 250.00 202.89 "Foundation-" Found. Sub Str. Mar-22 Work in progress
(BR23RC-118) / RCPLWE 15.02.19 Construction EOT given Sub Structure- 70% 50%
(Length 2x14 M) upto 23.03.22 Super Structure-
Appoach Road

115 Muzaffarpur-1 Turki-Saraiya Road in 4th km (BR23RC- RCPLWE P 2x18M 405.43 1663(S) Singh Construction 441.273 25.10.19 23.01.2021 164.03 46.50 441.273 210.53 "Foundation-" Found. Sub Str. Sup. Str Apr-22 Work in progress.
120) / RCPLWE 15.02.19 Pvt. Ltd. EOT 18.03.22 Sub Structure- 100% 100% 10%
(Length 2x18 M) Super Structure-
Appoach Road

116 Muzaffarpur-1 Turki-Saraiya Road (BR23RC-119) / RCPLWE P 21.825 3850.77 1663 (S) Broadway Links 3988.499 11.12.2020 10.06.2022 225.00 931.87 3988.499 1156.87 E/W-20.6" 18.00 18.00 16.75 1.23 June-22 Work in progress
RCPLWE 15.02.2019 Pvt. Ltd. GSB-21.433 18.00 18.00 16.75 1.23
WMM-20.808
DBM-20.808
BC-20.808
DLC-1.225
PQC-1.225
Drain-2.45
CD-3 Nos

117 Muzaffarpur-1 Construction of R.C.C., H.L. Bridge RCPLWE P 3x14M 436.13 12633(S) Kumar and 413.72 27.11.18 26.05.20 176.52 413.72 176.52 Pile- Found. Sub Str. Sup Str Aproach Mar-22 Work in progress
(3×14m) with approach road over 24.12.14 Prabhakar E.O.T. Pile cap 100% 100% 100% 50%
Irrigation canal in km 10th of Kanti- 28.02.22 Sub-Structure
Marban road for the year 2015-16 / Super Structure-
PLAN Approach Road

118 Muzaffarpur-1 W/S of Mithanpur Chowk to Pani Tanki Plan P 1.7 1077.82 8650 (S) Narshing Singh 1069.938 14.12.2020 13.08.2021 132.20 737.80 1069.938 132.20 L.D. imposed Rs. E/W-1.7" 1.70 1.70 1.65 Mar-22 Work in progress
Chowk via Lal Kothi Road 19.09.19 EOT 10.69 lacs GSB-1.7 1.50 1.50 1.50 Drain-2.10 km
26.02.22 DLC-1.7
PQC-1.7
Drain-2.9

119 Muzaffarpur-1 W/S of N.H.-28 Kaji Inda Chowk to NABARD P 7.58 2365.18 8571(S) Narshing Singh 2294.788 14.12.2020 13.06.2022 375.62 727.55 950.00 1103.17 E/W-7.58" 7.40 7.40 6.50 4.50 4.20 8 June-22 Work in progress,
Gandak Dam at Manika via Ragunathpur, 17.09.19 GSB-7.58 6.50 6.50 5.10 3.00 2.50 4 2 Nos. CD work in progress
Mansahi, Manika State Muzaffarpur-Pusa WMM-7.58
Road in km 0.00 to 7.58 and 01 Nos. DBM-7.58
R.C.C., H.L. Bridge (3x18M) BC-7.58
for the year 2020-21 under NABARD CD-16
Scheme H.L. Bridge-1

120 Muzaffarpur-1 Turki-Saraiya Road in 5th km (BR23RC- RCPLWE P 2x18M 381.58 1663(S) Singh Construction 414.486 06.12.19 155.00 47.00 414.486 202.00 L.D. imposed Rs. Foundation- Found. Sub Str. Sup Str. Mar-22 Work in progress
121) / RCPLWE 15.02.19 Pvt. Ltd. 06.03.2021 8.28 lacs Sub Structure- 100% 100% 75%
(Length 2x18 M) EOT given Super Structure-
upto 30.06.21 Appoach Road

121 Muzaffarpur-1 W/S work from Maszid Chowk to Kaji CRF P 9.719 2860.43 1846(S) NARSINGH 2709.18 02.07.2021 01.10.2022 0.00 734.32 350.00 734.32 E/W-9.597 7.00 6.50 1.50 2.50 Oct-22 Work in progress
Inda (N.H.-28) via- Bela Imali Chowk 21.02.19 SINGH GSB-9.597 7.00 6.50 1.50 2.50
Raghunathpur Madhuban Road in km 0 WMM-6.976
to 9.719 (under CRF Scheme) for the DBM-6.976
year 2019-20 BC-6.976
PQC-2.621
CD-9
H.L. Bridge-1

122 Muzaffarpur-1 IRQP work of Ramchandra Chowk to NABARD P 14.12 2499.50 4906(S) M/S Royal 2509.82 18.06.2021 17.12.2022 0.00 624.21 300.00 624.21 E/W-14.12 8.00 4.50 2.80 2.50 2.96 16 Dec-22 Work in progress
Mahua Main Road Via- Padmaul in km 0 29.08.20 Engineer's WMM-11.158 8.00 2.90 2.80 2.50 2.96 13
to 14.12 and 02 Nos. R.C.C., H.L. Bridge DBM-11.158
(3x18M) and (2x10M) BC-11.158
for the year 2020-21 under NABARD PQC-2.962
Scheme CD-24
14
H.L. Bridge-2
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
123 Muzaffarpur-1 W/S of Bhama Sah Dwar to Brahampura Plan P 2.5 980.29 8649 (S) Adarsh 1054.99 02.07.21 01.03.22 0.00 350.64 350.00 350.00 E/W-2.25 1.40 1.40 1.40 Mar-22 Work in progress
Chowk, Via- B.B. Ganj Road in 0 to 2.5 19.09.19 Construction GSB-2.25 1.20 1.20 1.10 Drain-1.10
for the year 2020-21 (under plan head) DLC-2.25
PQC-2.25
Drain-4.00
CD-4

124 Muzaffarpur-1 IRQ work in Balia to Ramchandra Main State Plan P 7.25 332.58 4822(s) M/S Royal 341.98 26.11.21 25.05.22 300.00 300.00 300.00 E/W-7.25 5.00 4.00 2 May-22 Work in progress.
road via Kurhani Railway station in km 26.08.20 Engineer's DBM-6.95 4.00 3.00 1
0.0 to 7.25 BC-6.95
Mastic-0.30
CD-2

125 Muzaffarpur-1 W/S of Chhoti Sraiyaganj to Leprossi State Plan P 4.25 2921.07 8948 (S) M/S Royal 2804.911 12.02.21 11.8.22 200.40 952.73 1100.00 1153.09 "E/W-2.8" 2.50 2.00 3.00 Aug-22 Work in progress
Mission Chowk via Kalyani Chowk, 03.10.20 Engineer,s GSB-2.8 2.50 1.70 2.50 Drain-5.50
Hathi Chowk, Goushala Chowk Road DLC-2.8
PQC-4.25
Drain-7.75
CD-5

125 Muzaffarpur- 18 155.844 332.58 7989.50 8130.95 12225.00 15381.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1 Total
126 Muzaffarpur-2 W/S of Sheohar-Minapur Road from NABARD P 12.850 3048.45000 Lt. No-957 Bachcha Singh 2550.15720 13.06.2018 11.07.20 1391.07 25.14 20.03.21 1482.00 L.D. Rs. 7,15,598/- Dt- E/W-12.85 12.80 12.80 12.40 12.06 4.50 0.00 3 Mar-22 Debarred vide letter no-386 dt-
13.02.2021
Intermediate to Double lane (Km. 20.43 (S) Dt- 05.07.2019 G.S.B.-12.85 12.80 12.80 12.40 12.06 4.50 3 22.05.20. Termination notice issued
L.D. Rs. 1,96,367/- Dt-
To 33.28) (NABARD) 07.02.2017 10.03.2021 WMM-12.85 vide letter no-46 dt-17.01.22. 3rd
(CMBD Work) (Plan - 5054) L.D. Rs. 2,51,484/- Dt- DBM-12.85 notice issued vide letter no-237 dt-
20.03.2021 SDBC-12.85 26.02.22
LD Rs. 1,29,126/- Dt-
Drain-2 x 2.00
15.09.2021
LD-4,50,000 C.D.-5 Nos
Dt-02.11.21

127 Muzaffarpur-2 W/S of Jhapaha-Minapur Road from Plan P 12.740 2888.43000 Lt. No- Mahesh Kumar 2688.75231 06.11.2019 04.12.21 818.49 230.27 22.11.21 1348.25 E/W-12.571 11.50 11.50 11.50 10.50 1.50 0.00 0.00 Mar-22 Notice issued vide letter no-126 dt-
Intermediate to Double lane (Km. 0.00 10323 (S) Dt- Singh G.S.B.-12.571 11.50 11.50 11.50 10.50 0.00 03.02.22
To 12.74) (NABARD) 21.12.2016 WMM-12.571
(CMBD Work) (Plan - 5054) DBM-12.571
SDBC-12.571
Drain-5.100

128 Muzaffarpur-2 W/S work in km 0 to 9.928 of Minapur- RCPLWE P 9.928 1850.19700 Lt. No-5057 Rajendra Singh and 975.90500 04.10.2018 03.10.19 443.00 81.00 - 524.00 L.D. Rs. E/W-9.928 8.50 8.00 8.00 7.50 5.00 0.00 1 March, 2023 Work completed in available land &
Tengraha Road under RCPLWE for the (S) Dt- Brothers 9,75,905/- Dt- G.S.B.-9.928 8.50 8.00 8.00 7.50 5.00 1 closed as per Deptt Lt No-7348 (E) Dt-
year 2017-18 (Package No.-BR23RC 02.07.2018 27.02.2020 WMM-9.928 15.11.2021
128) (RCPLWE) DBM-.928
SDBC-9.928
CD-1 Nos

129 Muzaffarpur-2 W/S work in km 0.00 to 10.195 of RCPLWE P 10.195 1464.83200 Lt. No-5057 Ramjee Singh and 1041.01000 12.12.2018 11.12.19 852.29 - - 852.29 L.D. Rs. E/W-10.195 9.50 9.60 9.50 9.30 8.90 0.20 1 March, 2023 Work completed in available land & closed as
Rajepur-Karchauliya Road under (S) Dt- Compan 3,48,822/- Dt- G.S.B.-10.195 9.50 9.60 9.50 8.90 8.90 0.20 1 per Deptt Lt No-7348 (E) Dt-15.11.2021
RCPLWE for the year 2017-18 02.07.2018 14.01.2021 WMM-10.195
(Package No.-BR23RC 127) DBM-9.995
(RCPLWE) SDBC-9.995
CD-1 Nos
PCC-0.20

130 Muzaffarpur-2 Construction of RCC HL Bridge RCPLWE P 148.80 m 1765.66900 Lt. No-5057 Vishwanath Sharma 1682.74000 21.02.2019 21.05.21 1301.48 80.00 11.10.21 1563.47 R.C.C. H.L. Bridge Const. work comleted. CS for
(8x18.60) over river bagmati in (S) Dt- (8 x 18.60 m) dismentling of old collasped bridge
Runnisaidpur-Katra-Keotsa road at 02.07.2018 Total no of well=9 submitted to CE, North, Bihar, patna
chainage 26.100 (in 27th km.) under nos
RCPLWE for the year 2017-18 (Package
No.-BR23RC126) (RCPLWE)

131 Muzaffarpur-2 Construction of proposed R.C.C. H.L. RCPLWE P 36.00 m 429.63000 Lt. No-1663 M/S Laxman 403.34666 26.12.2019 25.03.21 208.00 60.00 20.07.21 327.62 L.D. Rs. R.C.C. H.L. Bridge Mar-22 Bridge work completed. Approaches in
Bridge (2 x 18.00 m) in place of un (S) Dt- Kumar 3,00,000/- Dt- (2 x 18.00 m) progress. Estimate for LA of 10 dismal
bridge gap at 14th km of Minapur- 15.02.2019 07.05.2021 Total no of Pile=22 land for Rs. 13.85 lakh submitted to E-
Belsund Road (Including Maintenance nos N-C vide CE (N) Lt. No-l2671 Dt-
work) for the year 2017-18. (Package 23.12.21
No.-BR23RC131) (RCPLWE)

132 Muzaffarpur-2 Construction of proposed R.C.C. H.L. RCPLWE P 180.00 m 781.57000 Lt. No-1663 M/S Laxman 731.35388 26.12.2019 23.06.21 450.00 42.42 26.07.21 527.42 R.C.C. H.L. Bridge Mar-23 Bridge work completed. Approaches in
Bridge (6 x 18.00 m) in place of Old (S) Dt- Kumar (6 x 18.00 m) progress. LA for approaches of this
narrow screw pile bridge at 3rd km of 15.02.2019 Total no of Pile=46 bridge initiated separately. LA area-
Minapur-Tengraha Road (Including nos. 0.715 acre, Plots-7 nos.
Maintenance work) for the year 2017-18.
(Package No.-BR23RC 132)
(RCPLWE)

15
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
133 Muzaffarpur-2 Construction of proposed R.C.C. H.L. RCPLWE P 64.00 m 563.53000 Lt. No-1663 M/S Laxman 551.19549 26.12.2019 23.06.21 369.00 - - 369.00 R.C.C. H.L. Bridge Mar-23 Bridge work completed. Approaches in
Bridge (4 x 16.00 m) in place of Old (S) Dt- Kumar (4 x 16.00 m) progress. LA for approaches of this
narrow screw pile bridge at 9th km of 15.02.2019 Total no of pile=34 bridge initiated spearately.
Minapur-Tengraha Road (Including nos. LA area-1.608 Acre,
Maintenance work) for the year 2017-18 Plots-19 nos.
(Package No.-BR23RC 133)
(RCPLWE)

134 Muzaffarpur-2 W/S work of Runnisaidpur-Katra-Keotsa RCPLWE P 13.025 8900.38000 Lt. No-5057 Ramjee Singh and 4830.87812 23.06.2020 22.03.22 495.00 220.00 15.09.21 1545.00 E/W-12.715 9.50 8.10 5.00 0.00 0.00 0.00 15 June-22 WMM Work in progress.
Road in km 26.300 to 39-325 under (S) Dt- Company G.S.B.-12.715 9.00 8.00 5.00 15 Revised estimate (Rs. 5663.52 Lacs)
RCPLWE for the year 2017-18(Package 02.07.2018 WMM-12.315 submitted to CE, North vide Lt. No.-2048
(Package No.-BR23RC125 Part-II) DBM-12.315 Dt-21.12.2021.
(RCPLWE) SDBC-12.315 Soil stablization in 100 m was in progress.
But due to high moisture in soil it could not
CD-16 Nos
be completed. It has been deffered till April-
DLC-0.400
2022
PQC-0.400

135 Muzaffarpur-2 Strengthening of Basghata-Pahsaul- State Plan P 6.774 1911.17000 Lt no- M/S Royal 1556.94000 14.12.21 13.03.23 150.00 03.02.22 250.00 Road Work-6.667 2.20 Pile work completed.
Jajuar-Pupari road from km 0.0 to 11.47 4964(S) Engineers Bridge-2 Nos. 0.80 Cap in progress.
(exculding portions under NH-527(C) dt-31.08.20 Open foundation in progress.
Net Length 6.774 km

136 Muzaffarpur-2 H.L.Bridge in Minapur-Belsand Road RCPLWE P 36.00 m 393.20000 Lt. No-1663 M/S Laxman 379.42567 22.09.2020 20.12.21 203.00 56.00 28.10.21 259.00 H.L.Bridge (2x18.00 Mar-22 Bridge work completed. Approaches in
(13.125) (Package No.-BR23RC130) (S) Dt- Kumar m span) progress.
(RCPLWE) 15.02.2019

136 Muzaffarpur- 11 65.512 23997.06 6531.32 944.83 0.00 9048.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2 Total

137 Sitamarhi Construction and upgradation of Road DEPOSIT 5.800 5759.46 1161 (S) M/S Narayani 2241.6961 31.01.2020 25.03.22 348.75 738.39 12.12.21 2241.70 738.39 E/W-5.8 3.90 2.90 1.80 - - - 8 Aug-21 Work in progress
and other structures along Indo-Nepal dt. 14.12.17 Nirman GSB-5.8 2.90 2.90 1.80 8
Border Road Project from Bhitthamore WMM-5.8
to Parsa (Length=5.8 km) Under DGBM-5.8
Sitamarhi District for the year 2018-19 BC-5.8
INDO NEPAL CD-15 No.

138 Sitamarhi Construction and upgradation of existing DEPOSIT 10.925 9109.9 1161 (S) Kamlesh Kumar 4551.00148 08.01.2021 07.02.2022 537.74 1359.48 02.02.22 4551.00 1359.47 E/W-10.925 10.20 - - - - - 8 Feb.-22 Work is in progress
Road along Indo-Nepal Border Road dt. 14.12.17 Propriter Shashi GSB-10.925 9.23 6 E/W & 1 no. CD work in progress
Project from Bahar to Kanhauli kumari WMM-10.925
(Length=10.925 km) Under Sitamarhi DGBM-10.925
District for the year 2018-19 BC-10.925
INDO Nepal Border road CD- 8 No.

139 Sitamarhi Construction work of 1/22/0 RCC Box PLAN 1.00 66.788 2013 (S) Manoj Singh 57.94 17.06.2020 16.12.2020 0.00 0.00 31.05.21 57.93 6.26 Box Culvert-1/22/0 Dec-20 Debarred vide letter No.-553 dated-
Culvert in 1st & 5th km. of Kumma-Bela dt. 26.02.19 27.03.2021& Rescind vide letter
Road for the year 2019-20 Plan Bridge No.734 dated-25.05.2021

140 Sitamarhi Construction and Upgradation of existing DEPOSIT 49.15 14788.35237 1161(S) Brodway Links 21464.70638 05.06.2021 04.12.2023 0.00 1042.18 08.01.22 21464.71 1042.18 E/W-49.088 7.00 4.00 2.50 - - - 9 Dec.23 Work in progress
Road along Indo-Nepal Border Road dt.14,12,17 Pvt.Ltd GSB-48.945 5.50 4.00 2.00 8 7 No. Box Culvert is in progress
Project from Kanhauli to WMM-48.9945
sursand(Length=49.150 km) Under DGBM-48.945
Sitamarhi District for the year 2018-19 SDBC-48.945
INDO Nepal Border road CD-147 No.

141 Sitamarhi Widening and Strenthening from single PLAN 27.00 7028.69 5009(S) dt- MS Kabbu 7420.8122 12.06.2021 11.06.2023 0.00 1810.96 03.02.22 7420.81 1810.96 E/W-27.00 12.00 10.00 10.00 10.00 10.00 - 1 Jun-23 Work in progress
lane to Intermediate Lane work from 01.09.2020 Khirhar GSB-27.00 12.00 10.00 10.00 10.00 10.00 0 1 no. CD work& 1 no. HL Bridge pile
Narayanpur (SH87) to Mejargang WMM-19.971 cap work in progress.
Road via Piprari, Supilgara, DGBM-19.971
Nimahi,Pachra, Madhurapur, BC-19.971
Sandhwarabandh, Udasi Baba Pool DLC-7.20
(Adhwara River) ,Madhuban Bazar PQC-7.20
Chowk, CD-8No.
Pakri,Basha,Narahpur,Bhawanipur, HP-1No.
Bathnaha (NH104)and H/L bridge-4No.
Yogwana(NH77)from(km-0+000
to29+500) under Sitamarhi Division for
the year -2019-20 (Total Length-
27.00Kms)

142 Sitamarhi Widening and strenthening from single PLAN 4.80 1432.25 4980(S)dt. MS Kabbu 1402.70314 05.07.2021 04.05.2022 0.00 353.82 24.09.21 1402.70 353.82 E/W-4.80 4.40 3.90 2.00 1.50 1.50 1.95 2 May-22 Work in progress
lane to Intermediate Lane Shankar 01.09.2020 Khirhar GSB-4.80 4.40 3.90 2.00 1.50 1.50 1.70 2 1 no. Box Culvert work in progress
Chowk (NH77) Sitamarhi to Baryarpur WMM-2.620
Chowk (NH-!04) Sitamarhi via DGBM-2.620
Amghatta Road and Husaina More BC-2.620
from Km(0+000 to 4+800) in Sitamarhi DLC-2.120
Divition for the year -2019-20 PQC-2.120
16
CD-4 No.
H/L-1 No.
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
143 Sitamarhi Remaining work of Construction and up- DEPOSIT 24.05 16100 161(s) M/S Classic 14370.06 02.02.22 01.10.23 E/W-20.85 1.60 Work in progress.
gradation of existing Road along Indo- 14.02.17 Engicon GSB-21.85 0.00
Nepal Border Road Project from WMM-21.85
Phulwaria ghat to Bahar Village (Length- DGBM-24.25
24.05 km.) under Sitamarhi District for SDBC-24.25
the year 2018-19 CD-4
INDO Nepal Border road

143 Sitamarhi 7 122.73 54285.44 886.49 5304.83 37138.85 5311.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total

144 Sheohar Sheohar-Minapur road (Km 0 to 20.00) NABARD Plan 20.43 5451.68 10322(S) Raja Construction, 4756.73 24.08.2018 31.03.2021 4149.97 0.00 - - 4149.97 1% L.D. Imposed E/W-20.092 20.09 20.67 16.67 16.67 16.67 3.40 2 Dec-21 5 No. CD work As per Agreement
Dt-21.12.16 Gaya GSB- 20.067 20.09 20.67 16.67 16.67 13.00 3.40 2 2 No. CD work Completed. 3 No. CD
WMM -16.672 work not necessary (S.E. NBC, Muz.
DBM- 16.672 have visited site, EE, RCD, Sheohar has
SDBC-16.672 submitted for delete 3 no. CD work.)
CD- 5 nos.
PQC- 3.395

144 Sheohar Total 1 20.43 5451.68 4149.97 0.00 0.00 4149.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00

145 Araria Refugee Colony to Meerganj Chowk on Indo-Nepal 44.33 12803.40 6724(s) ASIP-AMR-JV 13773.6356 25.12.2012/ 24.12.2014 15993.60 839.00 ____ 18597.00 16823.60 ____ E/W-44.328 44.033 44.033 39.56 39.48 39.48 4.70 61 31.03.22 Work is in progress.
NH-57A (part of Road No.6 ) Revised- 13.08.12 Hydrabad EOT granted GSB-44.328 44.033 44.033 39.56 37.69 37.69 4.70 61
18597.00 9431600834 up to WMM-39.605
30.06.2021 DBM-39.605
SDBC-39.605
DLC-4.723
PQC-4.723
CD-63

146 Araria Meerganj Chowk to Kuari Bypass & Sikti Indo-Nepal 45.8 13400.76 RCD Letter Bhartia Infra 11927.13 24.06.2013/ 23.06.2015 10657.44 546.56 ____ 11927.13 11204.92 ____ E/w-37.502 30.33 28.28 26.35 25.17 23.81 1.61 63 31.03.2022 Work in progress.
to Dhabeli (Part of Road No-6) No-6724(S) Projects Limited. EOT granted GSB-35.600 28.90 28.28 26.35 24.00 23.81 1.61 63
Dated Guwahati up to WMM-35.600
13.06.2012 7766905101 31.03.2022 DBM-35.600
SDBC-35.600
CD-76
PQC-2.435

147 Araria CMBD Based work for Widening & NABARD 15.6 6059.56 lacs RCD Letter M/s Simanchal Const.- 3915.46 16.08.2018/ 30.09.2020 1960.41 357.91 ____ 4264.29 2318.32 L.D. imposed @ E/W-14.990 13.00 12.50 11.50 11.00 0.00 0.80 10 31.03.22 2 Nos. HL RCC Bridge work
Strengthening of Nasir Chowk-Belwa- No. -8982(s) Construction, Maint.-328.83 EOT granted 0.5% for slow GSB-14.990 13.00 12.50 11.50 11.00 0.80 10 completed. Work in progress
progress vide letter
Majhgama-Diyari-Mongra Road from km DT- Ashram Chowk, Total- 4264.29 up to WMM-13.390
no.-1538 dated-
0.00 to 15.600 with maintenance work 12.10.2017 Araria 15.06.2021 08.11.2019
DBM-13.390
for the year 2017-18 9431228011 L.D. imposed BC-13.390
increased to 1.0% CD-1/22/0 - 10 No
vide letter No 1807. PCC-1.60
Dated 30.12.2019 HL Bridge- 2No.
LD amount -Rs.-
11.27

148 Araria Widening & strengthening of Jahanpur NABARD 26.25 7602.31 lacs RCD Letter Satyanand Jha, M/S 6136.57166 23.11.2018 31.05.2021 2637.71 1055.05 ____ 6136.57 3692.76 L.D. imposed E/W-25.844 25.00 25.00 22.00 17.00 5.00 1.80 22 31.03.22 Work is in progress.
(NH-327E) –Sohandara-Urlaha-Hasanpur No. 2548(s) Dayanand Prasad 1st EOT 1.0% vide letter GSB-25.844 25.00 25.00 22.00 17.00 5.00 1.80 22
Road from CH-0+000 to 26+250 Total DT- Sinha & Co. granted up to No 2473 (E) WMM-23.629.
Length-26.250 km under RIDF 23.03.2018 Jantapath, 31 MAY 2021 Dated 18.03.2021 DBM-23.629
NABARD for the year 2017-18 Kankarbagh, Patna LD amount -Rs.- BC-23.629
7004813479 61.36 PCC-2.215
CD-26

149 Araria CMBD Based work for Widening & NABARD 14.832 4735.69 lacs RCD Letter RKS Engicon Pvt. Const.- 3326.76 27.06.2018/ 31.03.2021 1633.32 121.10 ____ 3694.56 1754.42 L.D. imposed @ E/W-14.832 14.83 14.83 10.00 2.00 0.00 1.60 8 31.03.2022 Work is in progress.
Strengthening of Chanderdai-Bangama- No. -8781(s) Ltd. Boring Road Maint.-317.80 1st EOT 0.5% for slow GSB-14.832 14.83 14.83 10.00 2.00 1.60 8 2 No. Minor Bridge completed & 1 No.
Paiktola-Matiyari-Mogra Road (km 1st, DT- Patna-I Total- 3694.56 granted up to progress vide WMM-13.232 is in progress.
11p, 12, 13, 14p, 15p, 16 to 24, 25p, 26p 09.10.2017 9470000086 31 MARCH letter no.-1538 DBM-13.232
27 & 28) Total Length-14.832 km with 2021 dated- BC-13.232
maintenance work for the year 2017-18 08.11.2019 PCC-1.60
L.D. imposed CD-8
increased to 1.0% Minor bridge- 3/63/0-
vide letter No 3 Nos
1808. Date
30.12.2019
150 Araria Strengthening work of Van Bibhag Plan P 18.5 1556.21 5198(s) LD amount -Rs.- TB opened on 09.12.21
chowk to Tarabari (Kursakanta) via dt-09-09-20
Bansbari, Mahisakol, Jhamta road
km 0 to 18.50

151 Araria Strengthening work of Mirza Bhag Belwa NABARD P 5.104 TB opened on 29.12.21
Majgama road from Ch-0 to Ch-5.104

17
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
152 Araria Widening & Strengthening work of State Plan 4.515 2781.17 lacs RCD Letter M/S Ghanshyam 2178.88 01.07.2020/ 30.06.2021 351.71 778.88 ____ 2178.88 1130.59 ____ E/W-4.503 3.00 4.50 2.54 2.54 0.00 1.96 0.00 31.03.2022 Work is in progress.
Meerganj to Jogbani border Road from No. 8949(s) Lal Devkrishna GSB- 4.503 3.00 4.50 2.54 2.54 1.96
ch:-0.00 km to 4.515 km for the year Dt- Engicon Pvt. Ltd. WMM- 2.538
2019-20 03.10.2019 Supaul DBM-2.538
BC- 2.538
PCC-1.965
CD-4
Drain-4930

152 Araria 8 174.931 14956.97 33234.19 3698.50 46798.43 36924.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
153 Purnea Widening and Strengthening of Rupauli NABARD 24.50 6339.62 6611(S) M/S H.S Mehta 5710.87881 04.01.2020 03.04.2022 2209.77 789.35 08.10.2021 3500.52 2999.12 NIL E/W-24.5 18.00 15.00 14.05 12.00 0.75 0.65 13 Apr-22 Revised TS estimate needs to be
to Vijayghat via Mohanpur road from km. 28.08.2018 Infra Pvt ltd GSB-24.5 18.00 15.00 14.00 9.00 0.75 0.65 11 sanctioned.
0.00 to 24.50 (Total Length of Road – WMM-22.499
24.50 km.) under Road Division, Purnea DLC-1.647
for the year 2018 – 19. DBM-22.499
BC-22.499
DLC-1.647
PCC-1.647
CD-14

154 Purnea Widening and Strengthening of NABARD 20.25 7906.38 6699(S) Kailash Prasad 8342.02532 24.01.2020 24.04.2022 1755.66 3340.49 30.11.21 4500.68 5096.15 NIL E/W-20.25 20.25 19.94 17.00 10.00 2.00 2.50 9 Jun-22 Work In Progress.
Dhamdaha (Nehru Chowk) to Bihariganj 29.08.2018 Yadav, Supaul GSB-19.946 20.25 19.00 13.00 8.00 0.00 2.50 9 Road & 5 HL bridge work is in
Boarder via Barhara Kothi road from km. WMM-17.448 progress. Pilling work of 8th HL Bridge
0.00 to 20.25 (Total Length of Roads - DLC-2.498 in 19th km will be resume again from
20.25) under Road Division, Purnea for DBM-17.448 March 2022 after flow of irrigation
the year 2018 -19. BC-17.448 water in canal is stopped by Irrigation
PCC-2.498 Department.
CD-9
HL Bridge-8

155 Purnea Widening and Strengthening of Fariyani NABARD 20.84 4528.12 7611(S) Sai Engicon & 3811.37403 06.03.2019 20.01.2021 1730.20 263.42 30.09.2021 1993.63 NIL E/W-20.84 19.00 18.00 17.0 (2nd 9.60 0.00 0.00 8 Apr-22 Revised TS estimate needs to be
Chowk N.H.-31 to Bahelia Asthan 01.10.2018 construction pvt. 1st EOT GSB-20.774 19.00 18.00 Layer) 9.60 8 sanctioned.
(Dhamdaha – Rupauli SH-65 Road) via Ltd. 31.12.2021 WMM-18.256
Chapay, Kamakhya Asthan to Majra, DLC-2.518
Kakarjan, Murhi, Sahra road from km. DBM-18.256
0.00 to 20.84 (Total Length of Road – BC-18.256
20.84 km.) MA-2.518
PCC-2.518
CD-9

156 Purnea Construction of 6 lane Road (Urban part State Plan P 3.30 2946.18 2116(S) Kailash Prasad 2256.2708 18.03.2020 17.04.22 122.97 1645.69 1768.65 NIL E/W-3.27 3.00 2.97 2.97 2.1 (RHS) 0.97 RHS 0.00 2 Mar-22 Work in progress.
of N.H.-107) from Ford Company Chowk 27.02.2019 Yadav, Supaul GSB-3.27 2.00 2.97 2.97 2.0 (LHS) 0.90 LHS 1
to Maranga in the District of Purnea, WMM-3.27
Bihar for the year 2018-19 (Length of DBM-3.27
Road Part - 3.30 Km.) BC-3.27
CD-6
Median-3.090

157 Purnea Widening and Strengthening of NH-107 NABARD P 10.00 2194.08 5201(s) M/S H.S Mehta 1671.52309 01.07.2021 30.06.2023 0.00 144.99 144.99 NIL E/W-8.287 2.50 2.50 0.00 0.00 0.00 0.00 0.00 Jun-23 Road & 2 no. CD work in progress.
Banmankhi Bus Stand to Kachahari 09.09.2020 Infra Pvt ltd. GSB-9.840 2.00 2.00
Balua via Nagrahi road for the year 2020- WMM-4.355
21. DBM-4.355
BC-4.355
DLC-5.484
PCC-5.484
MA-5.484
Drain-2.286
CD-4

158 Purnea Strengthening of Dhamdaha to Itahari PLAN P 20.00 3366.65 5015(s) M/S H.S Mehta 2621.55678 01.07.2021 30.06.2023 0.00 50.00 50.00 NIL E/W-20.0 7.00 6.80 0.50 0.00 0.00 0.00 0.00 Jun-23 Road & 1 no. CD work in progress.
via Dhokwa, Tarauni, Kukron, 01.09.2020 Infra Pvt ltd. GSB-15.750 5.00 4.40 0.00
Haripur, Kaimai, Priyankar road for WMM-12.760
the year 2020-21. DBM-12.760
BC-12.760
DLC-4.43
PCC-7.210
Drain-2.0
CD-11

159 Purnea Strengthening work of NH-107 PLAN P 6.28 1072.12 4826(s) M/S Ramsakhi 951.82631 28.07.2021 27.05.2022 0.00 33.84 33.84 NIL E/W-6.275 3.00 2.50 0.00 0.00 0.00 0.00 2 Mar-22 Work in progress
Banmankhi Hriday Nagar Chowk to 26.08.2020 Enterprises Pvt GSB-5.009 2.50 0.00 2
Khajhuri State Highway of Raniganj Ltd. WMM-5.009
Road via Rasarh satber, Pariyari road DBM-5.009
for the year 2020-21. BC-5.009
PCC-1.159
Drain-1.290
CD-2

18
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
160 Purnea Widening and Strengthening work of PLAN P 21.71 4802.79 5010(S) Kamac Engineers 4777.50163 21.07.2021 20.07.2023 0.00 325.78 325.78 NIL E/W-21.71 8.00 8.00 6.00 0.00 0.00 1.20 2 Jul-23 Road & 1 no. CD work in progress.
Amari-Kukraun to Kajha Kothi road 01.09.2020 (P) Ltd. GSB-21.158 8.00 7.00 1.00 0.20 1
for the year 2020-21. WMM-14.7482
DBM-14.7482
BC-14.7482
DLC-6.410
PCC-6.410
Drain-2.4
CD-11

161 Purnea Construction of RCC Drain in Dhamdaha- PLAN P 1.80 284.47 5444(s) Prem Kumar, 327.46539 21.07.2021 20.11.2021 0.00 72.62 72.62 NIL Drain Work (Length- - - - - - - - Mar-22 2.10 Km drain work completed.
Banmankhi road for the year 2020-21. 18.09.2020 Srinagar, Hata, 3.6 Km)
Purnea.

161 Purnea Total 9 128.68 0.00 5818.59 6666.18 8001.20 12484.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00

162 Kishanganj Construction and up gradation of road Indo Nepal P 79.50 25877 DGW/BFR J.K.M. Infra Project 23645.86 26.04.2013 25.10.2015 11531.34 3446.00 28.02.22 E/W-77.860 60.00 51.00 47.00 39.00 29.00 131 May-22 (i) H.L Bridge on Kankai-1 River -
and other structures (Including H.L. 25th EOT - GSB-77.860 60.00 51.00 46.00 37.00 27.00 126 Well Foundation. out of 20 wells 6 well
Bridges) from Fatehpur to Galgalia via HLEC/2013 31.12.2021 WMM-77.860 complete and 14wells is in progress.
piltola ( L–79.50 Km.) in Kishanganj dt. DBB-77.860 (ii) H.L.Bridge on Gariya river - Well
District under Indo Nepal Border Road 25.02.2013 SDBC-77.860 Foundation of 03 wells complete.
Project for the Year 2012-13 Culvert-161 no. Girder work in progress.
H.L.Bridge- 03 no. (iii) H.L.Bridge on Kishni river - Well
Foundation of 03 wells in progress.

163 Kishanganj Bhotathana-Azadnager-Ambari-Budhra- CRF P 12.90 4333.94 M/S Shankar 3648.33 08.05.2018 07.08.2020 2440.43 185.38 28.02.22 E/W- 12.78 12.50 12.50 11.00 11.00 11.00 1.40 7 June-22 Debar vide Letter No-215
Pothia Road 8407 (S) Agarwal GSB-12.78 12.50 12.50 11.00 11.00 11.00 1.40 7 dt-26.02.2020
22.09.2017 WMM-11.38 2% LD imposed vide Letter No.-671 dt-
DBM-11.38 26-06-21
SDBC-11.38 Road work completed.
DLC-1.40 In HL Bridge. Deck slab of 1 span
PCC-1.40 complete. Girder of Second span in
CD- 07 no. progress.
H.L Bridge-01

164 Kishanganj Bagalbari-Rahmatpara-Alta-Barbatta CRF P 20.70 4990.07 M/S Shankar 4179.27 17.08.2020 2695.55 223.40 28.02.22 E/W-20.70 20.00 19.70 19.70 18.50 18.00 21 Mar-22 Debar vide Letter No-871
Road 8406 (S) Agarwal 18.07.2018 GSB-20.70 20.00 19.70 19.70 18.00 18.00 21 dt-22.09.2020
22.09.2017 WMM-20.70 2% LD imposed vide Letter No.-853 dt-
DBM-20.70 02.08.21
BC-20.70 H.L Bridge Completed. Hindrance in
CD-21.00 km 18(P) & 19(P) by local villagers.
H.L Bridge-01 no. Work in progress.

165 Kishanganj W/S of Road from DB-50 Rahmatpara to NABARD P 44.00 14551.16 M/S Ganesh Ram 12504.05 L 25.02.2019 24.11.2021 5598.47 1435.69 28.02.22 E/W-44.00 40.00 38.00 38.00 35.00 32.00 2.00 35 Jun-22 1% LD imposed vide Letter No.-456 dt-
Sontha, Chopra Bokhari, Bishanpur, 4042 (S) Dokania GSB-44.00 40.00 38.00 38.00 35.00 32.00 2.00 33 10.04.2021
Chainpur, Asura, Haldikhora, 31.05.2018 WMM-41.40 Show Cause issued to contrartor for
Jiwachhpur, Majkuri, Charghariya, DBM-41.40 slow progress Vide Letter No-1301 dt-
Shitalpur, Pucca road under RIDF BC-41.40 23.11.2020 and Letter No-558 dt-
XXXIII PCC-2.60 18.05.2021
CD-38 no. work in progress.
H.L Bridge-04 no.

166 Kishanganj Kishanganj-Dinajpur Road P P 3.20 981.53 5199 (S) M/S Santalall & 899.46 30.09.2021 0.00 349.25 28.02.22 E/W-3.20 3.20 3.20 3.20 Mar-22 WMM completed. Bituminous work to
09..09.2020 Brothers 01.04.2021 GSB-3.20 3.20 3.20 3.20 be done.
WMM-3.20
DBM-3.20
BC-3.20

166 Kishanganj 5 160.30 50733.70 22265.79 5639.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
P
167 Katihar Strenthening Work (IRQP) of Road form NABARD 41.019 8022.350 5059(s) Top Line Infra 8061.82736 05.06.2021 04.06.2023 694.51 01.12.21 8061.83 694.38 E/W-36.86 3.00 7.20 3.75 3.75 0.00 0.84 13 04.06.2023 Work in Progress
SH-77 Narheiya via sameli village Dt- Projects Pvt. Ltd. GSB-36.96 3.00 7.20 3.75 3.75 0.84 13 7 no. CD work in progress.
crossing NH-31 Madhali Barari to Raunia- 03.09.2020 WMM-24.84
sharifganj (Total Length of road 41.019 DGBM-24.84
km) km for the year 2020-21 BC-24.84
DLC-2.544
PCC-2.544
MA-4.0
CD-27Nos

19
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
P
168 Katihar IRQP work of Kurum Hat to P 10.000 3875.380 5028(S) 3057.09173 15.06.2021 14.04.2023 200.00 3057.09 200.00 E/W-8.712 3.10 2.50 2.00 0.31 2 14.04.2023 2 Nos. Culvert work in progress
Bazargaon Road form km o to 10 dt- Top Line Infra GSB- 8.712 3.10 2.50 1.50 0.31 0
(Total Length of Road 10.00 km) for 02.09.2020 Projects Pvt. Ltd. WMM- 8.029
the year 2020-21 BM- 8.029
SDBC-8.029
DLC- 0.683
PCC-0.683
CD-06Nos

P
169 Katihar IRQP work of Balrampur to Telta Via P 14.310 4339.200 5012(s)Dt- Bansidhar Pvt. 4158.45879 28.06.2021, 27.04.2023 125.86 4158.45879 125.86 E/W-12.621 2.00 0.45 4 27.04.2023 8 Nos. Culvert work in progress.
Mahisal Road from km 0 to 14.31 01.09.2020 Ltd. GSB-12.621 0.00 0.07 0
(Total Length of Road 14.31 km) for WMM-12.621
the year 2020-21 BM-12.621
SDBC-12.621
DLC-1.204
PCC-1.204
CD-17Nos

169 Katihar Total 3 65.329 16236.93 0.00 1020.37 11118.92 1020.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00

P
170 Khagaria Construction and Improvement work of State Plan 2.10 2140.40 Letter No. Sri Ram Enterprises 1736.59734 14.02.20 13.11.21 802.43 233.35 1736.60 1035.78 - E/W-1.94 1.90 1.90 0.50 - - - - 31.03.22 Work in progress. Revised Estimated
Kusheshwar Sthan (SH-56) to Pholtora 10691(S)we GSB- 1.94 1.90 1.90 0.00 submitted for widening work.
Ghat Road from Km 20.80 to 22.90 in Dated- WMM-1.94 5 Nos. HL Minor Bridge completed.
Khagaria District Under SBD for the year 16.12.19 DBM-1.94
2018-19 BC-1.94
Minor Bridge-5

P
171 Khagaria Construction of Rcc Box Culvert size in State Plan RCC BOX 65.570 Letter No. Raj Constech Pvt. 60.32912 14.05.20 13.11.20 15.55 60.32 15.55 31.01.22 Work in Progress.
1/33/0 at chainaige 7000 in Place of size CULVERT 928(S) Wing wall completed. Approach road
1/22/0 at chainaige 7300 of Shumbha- Dated- work in progress
Sonihar Road under Road Division, 25.01.19
Khagaria for year 2018-19

P
172 Khagaria Widening and Strengthening of Hathwan- State Plan 1.90 561.280 Letter No. KUMAR INDIA 430.56502 17.09.20 16.03.21 227.05 163.61 430.56 390.65 E/W- 1.90 1.85 1.85 1.85 1.43 1.43 - 31.03.22 1.43 KM Work Completed.
Shaharbanni Road in KM 9(P) & 10 10625(S) ENGITECH PVT. GSB- 1.90 1.43 1.43 1.43 1.43 1.43 Protection Work-0.42 km
(Total Length 1.90 km) under RCD, Dated- LTD WMM-1.90
Road Division Khagaria for the year 2019- 12.12.19 DBM-1.90
20 BC-1.90
P. Work - 0.420

P
173 Khagaria Strengthening Work of Pasraha (NH-31) NABARD 8.50 1210.630 Letter No. KUMAR INDIA 945.58053 17.09.20 16.09.21 107.23 313.25 945.58 420.48 E/W- 8.478 6.00 0.95 3.50 - - 1.38 2 30.04.22 Work in progress.
to Paura via. Kharaua , Piparpati from km 10631(S) ENGITECH PVT. GSB- 0.040 5.00 0.00 1.20 1.25 0
0.00 to km 8.50 (Total Length=8.5 km) Dated- LTD. WMM-7.098
under RCD, Road Division Khagaria for 12.12.19 DBM-7.098
the year 2019-20 BC-7.098
P.Q.C.- 1.38
CD-2 No.

P
174 Khagaria Construction and Strengthening work State Plan 8.80 2013.400 Letter No. M/s VEENA 1739.20652 26.04.21 25.04.22 416.05 1014.53 416.04 E/W- 8.80 8.50 8.50 7.00 - - 0.30 - 25.04.22 Work in progress.
of Parihara-Ranisakarpura, Imli 4907(S) SINGH, GSB- 8.80 7.09 8.50 6.00 0.00
Railway Station to Koniya Road (Total Dated- KAPASIYA, WMM-7.40
Length-8.80 km) Under Road Division, 29.08.20 BEGUSARAI, DBM-7.40
Khagaria for the year 2020-21. BIHAR BC-7.40
PQC- 1.40
CD-10

P Contractor work completed on 24.12.21


175 Khagaria Widening and Strengthening-cum-Output NABARD 20.50 3918.940 Joint M/S Narsingh 3115.88072 07.07.18 Time 1729.74 559.69 3115.90 2289.43 15.3294 E/W- 20.20 20.20 20.20 19.10 18.35 18.35 1.85 5 24.12.21
Letter nol-192 date-04.03.20 & Letter no-224 dt-
& Performance Based Road Assets Secretary/R. Construction, Extension GSB- 20.20 20.20 20.20 19.10 18.35 18.35 1.85 5
13.03.20
Maintenance Work of Khagaria Gaushala C.D. Lt. No. Gangjala, Saharsa grented upto WMM-19.10 Debarded vide letter no-923 dt-19.11.18. 1st LD
more to karua more (N.H.- 107) Road via 8163(S) 31.03.21 DBM-18.350 imposed of Rs. 15,32,940/- Total LD Amount
Gudria Asthan, Marar, Amni, Badla Ghat Patna,dt SDBC-18.350 45,07,743.00
Railway station in km 0.00 to 20.50 12.09.17 D.L.C.- 1.10
(Total Length-20.50km) under NABARD POC.-1.850
Scheme For year 2017-18 CD-7 No.

175 Khagaria 6 41.80 9910.22 2866.45 1701.50 7303.49 4567.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
176 Madhepura Baijnathpur- Gamhariya NABARD 103 32.30 9953.04 10928 (S) RKS Engi. Pvt.ltd 8015.58 27.06.2018 31.03.2021 5770.16 513.90 10.12.21 7227.24 6284.06 Debared, LD E/W- 32.30 30.00 30.40 26.30 26.00 20.00 4.30 25 Mar-22
via Litiyahi Road dt- & Shiv Krishna Imposed 80.15 GSB- 32.30 30.00 30.40 26.30 26.00 12.00 4.30 25
29.11.2017 Builders, pvt. Ltd. Lakh Vid Dept. Lt WMM- 28.00
No.-2164 (E) Date- DBM- 28.00
09-03-2021. BC- 28.00
40.07 Lakh LD
CCP- 4.30
Imposed Vide Lt
CD-28.00Nos
No.-514 Date-05-
06-2021

20
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
177 Madhepura Gwalapara to Bihariganj Road. NABARD 103 9.05 4704.89 AA -2368 M/S Raja 2582.74 21.02.2019 31.03.2021 1942.78 68.00 18.10.21 2424.41 2010.78 25.82 Lakh/ E/W- 9.05 8.80 8.85 6.90 6.90 6.10 1.95 12 Mar-22 CD work in progress
(S) Construction 07.03.2020 GSB- 9.05 8.80 8.85 6.90 6.90 6.10 1.95 11
dt- LD Imposed WMM-7.1
23.03.2018 12.91 Lakh LD DBM-7.1
Imposed Vide Lt SDBC- 7.1
No.-493 Date 03-
CCP- 1.950
06-2021
CD- 14Nos

178 Madhepura Left Out Portion of NH 107 Madhepura State Plan P 7.338 1349.49 AA -9315 Sincon infra 1393.35 16.08.2019 31.03.2021 1184.76 74.89 07.12.21 1545.40 1274.76 Debared E/W-7.278 7.27 7.27 5.32 5.32 5.32 1.95 NA Dec-21
Bypass Road. (S) structure Pvt. Ltd. LD Imposed 27.86 GSB-7.278 7.27 7.27 5.32 5.32 5.32 1.95
dt- Lakh Vide Dept Lt WMM-5.328
07.12.2018 No.-1106 (E) Date- DBM-5.328
12-02-2021 BC- 5.388
6.96 Lakh LD
CCP- 1.950
Imposed Vide Lt
No.-513 Dated-05-
06-2021

179 Madhepura Left Out Portion of NH 107 Murliganj Plan P 5.22 1196.11 AA - 9261 Chandan kr. Singh 1196.11 22.07.2019 30.11.2020 720.00 150.00 09.12.21 1196.11 870.00 NIL E/W-5.165 5.16 5.16 3.57 3.57 3.56 1.60 NA Jan-22 Mastic Ashphalt-1.60 km
Bypass Road. (S) GSB-5.165 5.16 5.16 3.57 3.57 3.56 1.60
dt- WMM- 3.565
06.12.2018 DBM- 3.565
/Re-AA BC- 3.565
4347(S) dt- CCP- 1.60
01.09.2021 M.Ashphalt- 1.60

180 Madhepura Khurhan-Parail-Ratwara-Kapasiya Road. Plan P 3.10 514.34 4908 (S) Chandan kr. Singh 527.61 18.05.2021 17.02.2022 105.00 16.10.21 527.61 80.00 NIL E/W-3.087 2.50 2.40 2.40 0.00 0.00 0.00 1 Mar-22
dt- GSB-3.087 2.50 2.40 0.00 1
29.08.2020 WMM- 3.087
DBM- 3.087
BC- 3.087
CD- 1 Nos

181 Madhepura Alamnagar-Budhma-Mali chowk Plan P 16.00 2823.74 4966 (S)dt- R.K Construction 21.05.2021 20.11.2022 524.61 10.11.21 2331.30 900.00 NIL E/W-15.580 13.50 13.00 12.00 5.00 0.00 NA 0.00 Nov-22
Road. 31.08.2020 2823.74 GSB-15.580 12.29 12.00 10.50 2.60
WMM- 15.580
DBM- 15.580
BC- 15.580
CD- 1 Nos

181 Madhepura 6 73.01 20541.61 9617.70 1436.40 14724.46 11419.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
182 Sahrsa Routa - Sonbarsa Kachahari Road from Plan P 14.05 3610.99 12044(S) Baba Hans 2919.93 07.07.2017 06.07.2019/ 2423.39 136.34 2919.93 2559.73 E/W-12.858, 12.86 12.86 12.11 12.10 12.10 0.75 18 Dec-21 Road work completed.
Km 0.00-3.10 & 5.03-15.984 including Dt.- Construction Pvt. 31.03.2020 GSB-12.858 12.86 12.86 12.11 12.10 12.10 0.75 18 Acquisition of land in process for H. L.
18 Nos. of RCC culvert (CMBD) 12.12.2014 Ltd. WMM-12.108 Bridge approach.
BM-12.108,
SDBC-12.108
PQC-0.75,
CD-18 Nos.
H.L Bridge-2

183 Sahrsa Improvement work of left out portion of Plan P 10.98 1491.67 9257(S) Sincon 1378.96 12.07.2019 11.07.2020 1376.12 173.47 1378.96 1549.59 E/W-8.28 8.28 6.40 6.40 6.40 6.40 2.70 Mar-22 Revised AA received. Work is in
NH-107 Bariyahi Market to Saharsa Dt.- Infrastructure Pvt. GSB-8.28 8.28 6.40 6.40 6.40 6.40 2.70 process.
Bypass from Ch-65+220 to 76+200 06.12.2018 Ltd. WMM-8.28
(Total Length - 10.98 km) for the year DBM-8.28
2018-19 under Road Division Saharsa BC -8.28
PQC - 2.70

184 Sahrsa W/S for Construction of PQC work, Side Plan P 0.75 248.37 6568(S) Rakesh Ranjan 205.12 25.04.2020 24.09.2020 94.25 10.68 205.12 104.93 10.25 E/W - 0.68 0.68 0.68 0.68 Feb-22 Sanctioned length-0.75 km. But actual
Drain work & Road Safety Audit works Dt.- 25.08.21 GSB - 0.68, 0.68 0.68 0.68 length at site-0.68 km.
with miscellaneous work in Aman chowk 18.07.2019 DLC - 0.68 Show Cause for Risk & Cost is issued
to Saharsa Basti Pokhar Road from Km PQC - 0.68 on 18.12.2021 vide Letter
0.000 to 0.750 (Total Length - 0.750 Km) S.Drain-2×0.68 No. - 1778.
for the year 2019-20 under Road Contractor has been submitted letter for
Division, Saharsa granting work up to 31.03.2022.
Drain-0.45

185 Sahrsa Construction/Improvement work, Side Plan P 1.00 328.15 6843(S) M/s Jay Mata Di 295.55 12.05.2020 11.11.2020 240.81 295.55 240.81 E/W - 1.00, 1.00 1.00 1.00 Feb-22 First EOT is given up to 30.06.2021.
Drain work & Road Safety Audit works Dt.- Construction GSB - 1.00, 1.00 1.00 1.00 For next EOT, Letter is issued to the
with miscellaneous work in Kachahari 25.07.2019 DLC - 1.00, Contractor for submitting and Utility
Railway Dhala to Shivpuri Bypass Road PQC - 1.00, Shifting in progress.
via Pratap chwok to Paswan Tola from S. Drain-2 ×1.0 Drain-2x0.95 km
Km 0.00 to 1.00 (Total Length - 1.00
Km) for the year 2019-20 under Road
Division, Saharsa

21
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
186 Sahrsa Construction/Improvement work, Side Plan P 1.00 329.34 6566(S) Rakesh Ranjan 273.42 12.05.2020 11.11.2020 52.57 31.63 273.42 83.93 E/W - 0.518 0.52 0.52 0.52 Mar-22 Sanctioned length-1.00 km, but actual
Drain work & Road Safety Audit works Dt.- GSB - 0.518 0.52 0.52 0.52 work done length at site for road work
with miscellaneous work in Dahlan 18.07.2019 DLC - 0.518 0.518 km.
chowk to Kabristan chowk via Ashok PQC - 0.518 Show cause for Risk & Cost is issued
Talkies Road from Km 0.00 to 1.00 S. Drain-2 × 1.00 on 18.12.2021
(Total Length - 1.00 Km) for the year vide Letter No. - 1777.
2019-20 under Road Division, Saharsa Contractor has been submitted letter for
granting work up to 31.03.2022.
Drain-0.425

187 Sahrsa Construction/Improvement work, Side Plan P 2.2 720.87 7156(S) Rakesh Ranjan 597.43 03.03.2020 02.12.2020 208.51 24.56 597.43 233.07 E/W-1.24 1.24 1.24 1.24 Mar-22 Sanctioned length-2.20 km, but actual
Drain work & Road Safety Audit works Dt.- GSB-1.24 1.24 1.24 1.24 work done length at site for road work
with Miscellaneous work in Refugee 02.08.2019 DLC-1.24 1.24 km.
colony (Today Shop) to Sarahi more- PQC-1.24 Show cause for Risk & Cost is issued
Naya Bazar to Airport more Road from S Drain-2×2.20 on 18.12.2021
Km 0.00 to 2.20 (Total Length - 2.20 vide Letter No. - 1773.
Km) for the year 2019-20 under Road Contractor has been submitted letter for
Division, Saharsa granting work up to 31.03.2022.
Drain-0.72 km

188 Sahrsa Widening and Strengthening (From NABARD P 6.3 1642.88 6248(S) Manoj Kumar 1645.8 09.09.2020 08.09.2021 715.96 216.53 1645.80 932.49 E/W-6.30 6.30 6.30 2.90 2.90 2.80 3.20 4 Mar-22 1 No. Box Culvert required to be D-
Single Lane to Intermediate Lane) of Dt.- GSB-6.30 6.30 6.30 2.90 2.90 2.80 3.20 4 scope.
Nayabazar to NH-327 (E) via Nariyar 10.07.2019 WMM-3.04 Drain-2.20
Road from Km 0.00 to 6.30 (Total DGBM-3.04
Length - 6.30 Km) under SBD for the BC-3.04
DLC-3.244
year 2018-2019 under Road Division,
PQC-3.244
Saharsa
CD-10
Drain-6.30
M. bridge-2

189 Sahrsa Construction of High Level bridge in Km Plan P 0.037 558.5 12653(S) M/s Sona 385.61 22.10.2016 21.10.2017/ 274.37 385.61 274.37 H. L. Bridge Oct-21 Acquisition of land for approach is in
1st of Mahisi - Chainpur Road Dt.- Construction 31.03.2019 2 × 18.00 m progress. HLB super structure
24.12.2014 completed. Except approach.

190 Sahrsa W&S work of Koparia Bhakta Kiran to Plan P 4.4 2957.4 4905(S) M/S Baba Hans 2311.27 Road Work-4.40 LOA issued vide letter no-169 dt-
Banma Ramdhari chowk and Dt-29.08.20 Const. Pvt. Ltd. Well Foundation Bridge 15.02.22
construction of RCC HL Bridge at Ch- (4x16m)-1
2.57 & Ch-3.06 from km 0.00 to 3.85 & Pile Foundation
0.55 km link road (4x16m)-1 no.

191 Sahrsa Widening & Strengthening work of State Plan P 3.39 1237.01 7356(S) Sanjeet Kumar 917.43 28.03.2018 27.03.2019 530.33 917.43 530.33 45.87 E/W - 3.39, 3.30 3.30 2.99 2.99 2.99 0.30 3 Mar-22 Show caused issued on 29.12.21 vide
Bangoan Thana to Parri Road from km Dt.- 13.03.21 GSB - 3.39 3.30 3.30 2.99 2.99 2.99 0.30 3 letter no-1818
0.00 to 3.39 (Total - 3.39 km) for the year 18.08.2017 WMM - 2.999
2017-18 DBM - 2.999
SDBC - 2.999
PQC - 0.375
CD - 3 Nos.
Drain-2x0.75
M. Bridge-1

191 Sahrsa Total 10 44.107 13125.18 5916.31 593.21 8619.25 6509.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00

192 Supaul W/S Work of Suapul-Bina Road under Plan 5.565 1340.81 8989(S) Rakesh kumar 1234.08588 23.09.2020 22.09.2021 190.33 95.00 01.11.21 1234.08 285.33 - E/W-5.529 4.50 4.00 3.90 - - 0.26 Jan-22 Work in progress.
road division Supaul for the year 2019- 04.10.2019 ranjan GSB-5.529 4.50 4.00 3.90 0.00
20/Plane Head WMM-4.597
DBM-4.597
BC-4.633
PQC - 931
NALA-840
B0x Culvert-3

193 Supaul Widening and Strengthening from Supaul NABARD 10.9 3642.33 5058(S) dt. KPYCL Pvt. Ltd. 2639.75 27.07.2021 26.01.23 248.53 10.01.22 270.00 250.00 E/W-10.749 9.00 7.50 7 1 Nos.Box Culvert work in Progress
NH-327(E) to Mohania PWD Road Via- 03.09.2020 GSB-10.749 6.00 5.50 7
Marcha, Jagatpur and Katia Tola from WMM-9.074
Km 0.00 to 10.90 for the year 2020- BC-9.074
21/Nabard Head PCC-1.675
Drain-2.5
CD-12 No.

194 Supaul Widening and Strengthening from Plan 17.868 5740.2 5014(S) KPYCL Pvt. Ltd. 5050.15584/ 27.07.2021 26.07.2023 255.19 15.02.22 350.00 150.00 - E/w-15.713 5.00 4.00 20 Work in Progress.
India-Nepal Border Road Simri to dt.01.09.202 / GSB-15.713 3.00 3.00 6
Duyaniya NH-57 via Chhithi, 0 WMM-15.713
Hariraha, Fakirna, NH-106 Anandpur, DBM-15.713
Daulatpur, Sripur from km 0.00 to BC-15.713
17.868 for the year 2020-21/Plane Head Box CD-31
HP CD-12

195 Supaul W/S of Birpur Basmatiya Road/ Plan Plan 6.2 1995.22 4967(S) dt. Uday Kant Jha 1438.79956 28.07.2021 27.07.2022 108.00 16.12.21 200.00 120.00 E/W-6.267 6.00 6.00 6.00 3 2 no. Box culvert work in progress.
31.08.2020 GSB-6.021 5.50 5.00 5.00 2
WMM-6.021
DBM-6.021
BC-6.267
CD-8
P. block-400m

22
ROAD CONSTRUCTION DEPARTMENT
PROGRESS REPORT FOR THE YEAR 2021-22

WING-NORTH BIHAR
SR. DIVISION NAME OF ROAD HEAD SANCTIONED ADMINISTRATIVE NAME OF AGREEMENT DATE OF Date of FINANCIAL PROGRESS DURING 2021-22 UP TO 26.02.2022 PHYSICAL PROGRESS DURING2021-22 UPTO 26.02.2022 EXPECTED REMARKS
NO. LENGTH APPROVAL CONTRACTOR AMOUNT (RS. WORK Completion MONTH OF
(IN KM) AMOUNT Reff. No. & IN LACS) ORDER CUMULATIVE EXPENDITUR DATE OF WORK ACTUAL FINE TOTAL TARGET E/W GSB WBM BM/ SDBC PCC CD COMPLETION
(RS. IN LAC) Date EXPENDITURE E upto Feb-22 MEASURE VALUE AS WORK IMPOSED/DAT OF WORK TO BE (IN KM) (IN WMM DBM BC PQC WORK
UPTO MENT PER DONE E(IN LACS) DONE AS PER KM) (IN KM) (IN KM) PMC (IN KM) (IN NO.)
31.03.2021 TARGET (IN LACS) AGREEMENT (IN (IN KM)
(IN LACS) KM)

1 2 3 4 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
196 Supaul Widening and Strengthening from Plan 2.772 988.28 4983(S) dt- Baba Hans const. 873.78 08.12.21 07.09.22 43.69 25.01.22 55.00 50.00 - E/w-2.453 1.00 0.90 6 Work in progress.
Baysi Gaon to NH-106 (Via Taranand 01.09.2020 GSB-2.558 1.00 0.00 6 Drain-125m completed.
yadav tola, Tin Tolia and Mushlim PCC-0.135
tola) from Km 0.00 to 02.722 km for WMM-2.558
the year 2020-21/ DBM-2.558
BC-2.453
H.L. Bridge-1
Drain-170 m

197 Supaul Construction of Road from Saraigarh Indo Nepal 41.773 11770.2 6724 (S) AISP-AMR (JV) 12677.84 / 18.12.12 / 31.03.20 Time 14296.71 126.73 12.07.2021 14450.00 14423.44 E/W-41.337 40.20 40.20 38.00 38.50 37.70 2.40 18 H.L. Bridge Hamer head of P1, P2, P3
(Garia Chowk) to refugee colony (Length (As per revised 13.06.12 Hydrabad extension GSB-41.337 40.20 40.20 38.00 38.00 37.00 2.40 18 Completed. 1st span guder work
40.99 km) Under Supaul estimate) revised guranted Dt. WMM-38.937 completed. & Rest in Progress
(Indo-Nepal Border road) 1161(s) 31.12.2021 DBM- 38.937
14.02.17 SDBC-38.937
PQC-2.4
DLC-2.4
Drain-3.4
CD-23
Minor Br-03
Major Br-01

198 Supaul Construction of 1/22/0 Box Culvert (3 (Plan 10 No. Box 448.24 2495(s) Dt Narsingh 371.07 04.01.2018/ 03.01.2019 258.68 - 15.01.2019 258.68 258.68 Culvert-10 8
Nos), 2/22/0 Box culvert (4 Nos), 3/22/0 Bridge) Culvert 18.03.2017 Construction 8
Box culvert (1 No), and 3/33/0 Box
culvert (2 Nos) with approach Road in
km 1, 3, 5, 6, 7, 8, 10 of Chhatapur-
Giridharpatti (Supaul district border) via
Chunni (Sh-92)

199 Supaul Construction of 6 nos. box culvert in 4th, (Plan 6 no. Box culvert 248.07 5103(s) K.P.Yadav 205.16 27.11.17 26.05.18 146.93 25.02.2019 146.93 146.93 Culvert-06 5 One Box Culvert Descapied &
6th & 8th km of Bariya pallar-Devipatti Bridge) 13.06.17 Const.Pvt.Ltd 5 Agreement Closed vide letter No
Road 5764(E) dt. 26.08.2021

Supaul Total 8 43.305 12407.93 14892.65 877.14 16964.69 15684.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Grand 199 731.455 137912.54 94611.68 21633.02 113530.44 88610.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total