DAILY PRODUCTION AND PERFORMANCE REPORT

CUTTING (unit - 1) and (unit - 2 ) DATE - 13/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED PERFOR- WEIGHT
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR REASION/ BRAKEDOWN WEIGHT IN
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER MANCE PER PCS
KG
DAY

ROLLFORMING SECTION
1 RFM 04 CA 450MM 450 133.5 2.5 ROLLING VICKY 15 4500 4600 -100 2400 1600 UMASHANKER 67% MACHINE SETTING 1.18 1888.8

1 RFM 04 CA 450MM 450 133.5 2.5 ROLLING VICKY 15 3500 1450 2050 2400 1450 UMASHANKER 60% MACHINE SETTING 1.18 1711.7

BLANKING TOTAL PERFORMANCE 64% TOTAL WEIGHT 1889


2 MPP 15 SSS 022 H 117 40 5 CUTTING ROY 23 200 300 -100 377 300 ROSHAN 80% 30 MINUTS PRODUCTION 0.184 55.2

2 MPP 15 SSS 029 H 158 40 5 CUTTING STEFAN 16 1000 1100 -100 1132 1100 ROSHAN 97% 1.5 HOUR PRODUCTION 0.248 273.2

2 MPP 15 SSS 10 H 136 40 5 CUTTING ROY 23 1000 1100 -100 1132 1100 ROSHAN 97% 1.5 HOUR PRODUCTION 0.214 235.2

2 MPP 16 SSS 013/H 179 40 5 CUTTING STEFAN 16 15400 15900 -500 6000 4000 RAGHAV RAM 67% HELPING 0.281 1125.6

3 MPP 24 SC-U-1" 75 32 2 CUTTING VALDES 13 240000 74000 166000 18000 23000 DEEPAK 128% ACHIEVED 0.038 867.7

3 MPP 26 SC-U-2-1/2" 131 32 2.5 CUTTING VALDES 13 40000 5500 34500 6577 5500 ABHIJEET 84% 4 HOURS PRODUCTION 0.082 453.1

3 MPP 26 SC-U-2" 109 32 2.5 CUTTING VALDES 13 100000 100300 -300 1650 1300 ABHIJEET 79% 1 HOURS PRODUCTION 0.069 89.1

3 MPP 26 SC 1127 113.5 32 2 CUTTING VALDES 23 1600 1600 0 1650 1600 ABHIJEET 97% 1 HOURS PRODUCTION 0.057 91.4

5 MPP 32 CNP M10 38 19 8 CUTTING NIGEL 4,5 144000 68000 76000 17000 10000 ANIL 59% SERVO FEEDER PROBLEM 0.045 454.0

FINAL PROCESS TOTAL PERFORMANCE 87% TOTAL WEIGHT 3644


17 MPP 10 SSS 01-M10 H 40 40 5 BLANKING DAVID 10 144000 37000 107000 16200 14000 MANTU KAHAR 86% WITH HELPING 0.052 728.0

2 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 7500 6800 MAMTA 91% 90% ACHIEVED 0.072 489.6

HOLD DUE TO
20 MPP 04 SC-U-2-1/2" 131 32 2.5 BENDING VALDES 13 40000 6450 3800 SUSHMA 59% 0.082 313.0
QUALITY ISSUE
21 MPP 8 SSS 45/41 75 65 5 STAMPING STEFAN 1,16 32400 6450 3000 MAMTA 47% ORDER COMPLETED 0.192 574.8

SPRING
22 MPP 28 HHB10X50 32 19 8 ATTACHMENT NIGEL 4,5 42000 3500 3500 RADHA 100% ACHIEVED 0.052 182.0
2 HOURS
22 MPP 06 SSS 013/H 179 40 5 STAMPING STEFAN 16 15400 1450 1300 MAMTA 90% 0.062 80.6
PRODUCTION
3 HOURS
24 TH 03 CNP M12 32 19 8 THREADING NICK OLD 96000 5600 4000 MANTU 71% 0.030 120.0
PRODUCTION

TOTAL PERFORMANCE 79% TOTAL WEIGHT 2488


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 15/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED PERFOR- WEIGHT
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR REASION/ BRAKEDOWN WEIGHT IN
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER MANCE PER PCS
KG
DAY

ROLLFORMING SECTION
1 RFM 04 CA 600MM 600 133.5 2.5 ROLLING VICKY 15 3500 3200 300 2400 1750 UMASHANKER 73% MACHINE SETTING 1.57 2754.4

BLANKING TOTAL PERFORMANCE 73% TOTAL WEIGHT 2754


2 MPP 15 SSS 04 H 162 40 5 CUTTING RSF 18 4000 2200 1800 2266 2200 ROSHAN 97% 3 HOUR PRODUCTION 0.255 560.3

2 MPP 16 SSS 013/H 179 40 5 CUTTING ROY 23 6000 5000 1000 6000 5000 RAGHAV RAM 83% HELPING 0.281 1406.9

3 MPP 24 SC-U-1" 75 32 2 CUTTING VALDES 13 240000 83800 156200 18000 9800 DEEPAK 54% MATERIAL STOCK OUT 0.038 369.7

3 MPP 24 K1132 146 32 2.5 CUTTING STEFAN 16,27 2200 2400 -200 2800 2400 DEEPAK 86% 1.5 HOURS PRODUCTION 0.092 220.3

SERVO FEEDER PROBLEM


5 MPP 32 CNP M10 38 19 8 CUTTING NIGEL 4,5 144000 76000 68000 17000 8000 ANIL 47% MANUAL CUTTING 0.045 363.2

FINAL PROCESS TOTAL PERFORMANCE 74% TOTAL WEIGHT 2360


17 MPP 10 SSS 01-M10 H 40 40 5 BLANKING DAVID 10 144000 50000 94000 16200 13000 MANTU KAHAR 80% WITH HELPING 0.052 676.0

2 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 8100 MAMTA 95% 90% ACHIEVED 0.038 305.6

20 MPP 05 SSS 027 H 122 40 5 BENDING ROY 23 12000 3425 2400 RADHA 70% OPEARTOR FAULT 0.173 415.2

SPRING
22 MPP 28 HHB10X50 32 19 8 ATTACHMENT NIGEL 4,5 42000 1500 1200 BABITA 80% 4 HOURS PRODUCTION 0.062 74.4

22 MPP 06 SSS 013/H 179 40 5 STAMPING STEFAN 16 15400 6800 3500 MAMTA 51% OPEARTOR FAULT 0.257 899.5

24 TH 03 CNP M12 32 19 8 THREADING NICK OLD 96000 20000 17000 MANTU 85% WITH HELPING 0.029 493.0

TOTAL PERFORMANCE 82% TOTAL WEIGHT 3424


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 16/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED WEIGHT
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR PERFOR-MANCE REASION/ BRAKEDOWN WEIGHT IN
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER PER PCS
KG
DAY

ROLLFORMING SECTION
MACHINE FAULT DAY TIME
1 RFM 04 CA 600MM 600 133.5 2.5 ROLLING ROY 23 1500 1900 -400 2400 1900 UMASHANKER 79% AND NIGHT PRODUCTION 1045 1.57 2990.5
PCS

1 RFM 04 CA 600MM 600 133.5 2.5 ROLLING VICKY 15 3000 600 2400 900 600 UMASHANKER 67% 1.5 HOURS PRODUCTION 0.79 471.6

BLANKING TOTAL PERFORMANCE 73% TOTAL WEIGHT 3462


2 MPP 15 SSS 04 H 162 40 5 CUTTING RSF 18 4000 4500 -500 2650 2300 ROSHAN 87% 3.5 HOUR PRODUCTION 0.255 585.7

3 MPP 26 RPC 83-91 182 20 2 CUTTING MARK OLD 5000 3600 1400 14500 3600 ABHIJEET 25% MANPOWER FAULT 0.057 206.0

FINAL PROCESS TOTAL PERFORMANCE 56% TOTAL WEIGHT 206


17 MPP 10 SSS 01-M10 H 40 40 5 BLANKING DAVID 10 144000 62000 82000 16200 12000 MANTU KAHAR 74% WITH HELPING 0.052 624.0

2 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 8300 MAMTA 98% 90% ACHIEVED 0.038 313.1

20 MPP 05 SSS 027 H 122 40 5 BENDING ROY 23 12000 3425 3000 RADHA 88% OPEARTOR FAULT 0.173 519.0

SPRING
22 MPP 28 HHB10X50 32 19 8 ATTACHMENT NIGEL 4,5 42000 3500 1330 BABITA 38% MAN POWER FAULT 0.062 82.5

2 MPP 04 SC-U-2-1/2" 131 32 2.5 BENDING VALDES 13 240000 4600 4500 MAMTA 98% 6 HOURS PRODUCTION 0.082 370.7

2 MACHINE OPERATE 4 HOURS


22 MPP 06 SSS 013/H 179 40 5 STAMPING STEFAN 16 15400 3000 2600 MAMTA 87% PRODUCTION 0.257 668.2
WITH WEIGHT
24 TH 03 CNP M12 32 19 8 THREADING NICK OLD 96000 21000 20900 CHUN CHUN 100% 0.029 606.1
CONFIRMATION

TOTAL PERFORMANCE 86% TOTAL WEIGHT 3769


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 17/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED WEIGHT
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR PERFOR-MANCE REASION/ BRAKEDOWN WEIGHT IN
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER PER PCS
KG
DAY

ROLLFORMING SECTION
AMNS COIL TRIAL 1.5
1 RFM 04 CA 600MM 600 133.5 2.5 ROLLING VICKY 15 3000 2400 600 2400 1800 UMASHANKER 75% HOURS PRODUCTION 0.79 1414.8
BREAK

BLANKING TOTAL PERFORMANCE 75% TOTAL WEIGHT 1415


2 HOURS PRODUCTION +HELPING AND
2 MPP 15 SSS 013 H 179 40 5 CUTTING ROY 23 6000 6000 0 1500 1000 RAGHAV RAM 67% MATERIAL SHIFTING 0.281 281.4

2 HOURS PRODUCTION +HELPING AND


2 MPP 15 SSS 05 H 202 40 5 CUTTING STEFAN 27 1000 1300 -300 1500 1300 RAGHAV RAM 87% MATERIAL SHIFTING 0.318 412.8

3 MPP 26 RPC 83-91 182 20 2 CUTTING MARK OLD 5000 5030 -30 14500 1430 ROSHAN 10% 1 HOURS PRODUCTION 0.057 81.8

3 MPP 24 SC1125 101 32 2.5 CUTTING ROY 23 800 850 -50 1800 850 ROSHAN 47% 1 HOURS PRODUCTION 0.064 54.0

3 MPP 24 K1131 135 32 2.5 CUTTING STEFAN OLD 120 150 -30 300 150 ROSHAN 50% 10 MINUTES PRODUCTION 0.085 12.7

3 MPP 24 SC1133 148 32 2.5 CUTTING COLIN OLD 400 450 -50 900 450 ROSHAN 50% 30 MINUTES PRODUCTION 0.093 41.9

3 MPP 24 SC1131 135 32 2.5 CUTTING COLIN OLD 200 250 -50 750 250 ROSHAN 33% 25 MINUTES PRODUCTION 0.085 21.2

3 MPP 24 K1125 101 32 2.5 CUTTING STEFAN 36 12000 2700 9300 3600 2700 ROSHAN 75% 2 HOURS PRODUCTION 0.064 171.5

FINAL PROCESS TOTAL PERFORMANCE 53% TOTAL WEIGHT 1077


3 MPP 10 SSS 01/M10 H 40 40 4.5 CUTTING DAVID 10 120000 72000 48000 14500 10000 MANTU KAHAR 69% WIDTH HELPING 0.057 565.9

2 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 7000 GULABI 82% 80 % ACHIEVED 0.038 264.1

20 MPP 05 SSS 027 H 122 40 5 BENDING ROY 23 12000 3425 2300 RADHA 67% OPEARTOR FAULT 0.173 397.9
2 MACHINE OPERATE 4 HOURS
22 MPP 06 SSS 013/H 179 40 5 STAMPING STEFAN 16 15400 3000 2500 MAMTA 83% PRODUCTION 0.257 642.5
WITH WEIGHT
24 TH 03 CNP M12 32 19 8 THREADING NICK OLD 96000 21000 20200 MANTU 96% 0.029 585.8
CONFIRMATION

TOTAL PERFORMANCE 73% TOTAL WEIGHT 2456


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 18/05/2023

S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED WEIGHT


M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR PERFOR-MANCE REASION/ BRAKEDOWN
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER PER PCS
DAY

ROLLFORMING SECTION
3 HORS PRODUCTION
1 RFM 04 CA 300MM 300 133.5 2.5 ROLLING VICKY 15 3000 3000 0 800 600 UMASHANKER 75% (POWER CUT) 0.79

1.5 HORS PRODUCTION


1 RFM 04 CA 300MM 300 133.5 2.5 ROLLING COLIN OLD 500 300 200 400 300 UMASHANKER 75% (POWER CUT) 0.79

BLANKING TOTAL PERFORMANCE 75% TOTAL WEIGHT

2 MPP 15 SSS 013 H 179 40 5 CUTTING VICKY 24 12000 3400 8600 4500 3400 ABHIJEET 76% 6 HOURS PRODUCTION 0.281

BASE PLATE
3 MPP 17
(640361) TOP 126 100 4 CUTTING ANTON OLD 100 100 0 120 100 RAGHAV RAM 83% 10 MINUTES PRODUCTION 0.396

BASE PLATE
3 MPP 17
(640161) BASE 135 65 6 CUTTING ANTON OLD 300 400 -100 480 400 RAGHAV RAM 83% 40 MINUTES PRODUCTION 0.414

BASE PLATE
3 MPP 17
(640161) TOP 126 100 4 CUTTING ANTON OLD 300 335 -35 360 335 RAGHAV RAM 93% 30 MINUTES PRODUCTION 0.396

5 MPP 32 CNP M10 32 19 8 CUTTING NIGEL 4,5 144000 86000 58000 11000 10000 ANIL 91% 5 HOURS PRODUCTION 0.038

FINAL PROCESS TOTAL PERFORMANCE 76% TOTAL WEIGHT


MATERIAL STOCK OUT 3 HOURS
3 MPP 10 SSS 01/M10 H 40 40 4.5 CUTTING DAVID 10 120000 77000 43000 5600 5000 RAGHAV RAM 89% PRODUCTION 0.055

2 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 8500 NIRMALA 100% 99 % ACHIEVED 0.038

2 MPP 04 SC-U-2-1/2" 131 32 2.5 BENDING VALDES 13 40000 750 500 NIRMALA 67% 1 HOURS PRODUCTION 0.080

20 MPP 05 SSS 027 H 122 40 5 BENDING ROY 23 12000 3425 3000 RADHA 88% 85 % ACHIEVED 0.173

22 MPP 06 SSS 013/H 179 40 5 STAMPING STEFAN 16 15400 4500 3800 BABITA 84% 6 HOURS PRODUCTION 0.253
SSS 012
22 MPP 21
S6(640310)
95 25 4 BENDING ANTON OLD 500 750 510 GULABI 68% 1 HOURS PRODUCTION 0.057

RPC 83-91
2 MPP25
BOTTOM 179 20 2 BENDING MARK OLD 5000 880 500 GULABI 57% 1 HOURS PRODUCTION 0.055

3 HOURS
24 TH 03 CNP M12 32 19 8 THREADING NICK OLD 96000 6600 6000 CHUN CHUN 91% 0.029
PRODUCTION
4 HOURS
24 TH 03 CNP M10 32 19 8 THREADING NICK OLD 16400 8800 7560 CHUN CHUN 86% 0.030
PRODUCTION
24 DL 04 RPC 26-28 TOP 89 20 2 THREADING MARK OLD 9000 4000 2315 RANJU 58% _ 0.019

TOTAL PERFORMANCE 86% TOTAL WEIGHT


DATE - 18/05/2023

TOTAL
WEIGHT IN
KG

471.6

235.8

707
956.7

39.6

165.5

132.7

382.3

1677
275.0

320.7

40.0

519.0

961.4

29.1

27.5

174.0

226.8

44.0

2617
DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 19/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED PERFOR- REASION/ WEIGHT
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR WEIGHT IN
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER MANCE BRAKEDOWN PER PCS
KG
DAY

ROLLFORMING SECTION
1 HORS PRODUCTION
1 RFM 04 CA 300MM 300 133.5 2.5 ROLLING COLIN OLD 500 500 0 266 200 UMASHANKER 75% (POWER CUT) 0.79 157.4

2.5 HORS PRODUCTION


1 RFM 04 CA 600MM 600 133.5 2.5 ROLLING COLIN OLD 500 500 0 500 500 UMASHANKER 100% (POWER CUT) 1.57 787.0

2.5 HORS PRODUCTION


1 RFM 04 CA 750MM 750 133.5 2.5 ROLLING COLIN OLD 500 500 0 500 500 UMASHANKER 100% (POWER CUT) 1.97 983.7

1 HORS PRODUCTION
1 RFM 04 CA 900MM 900 133.5 2.5 ROLLING COLIN OLD 400 100 300 166 100 UMASHANKER 60% (POWER CUT) 2.36 236.1

BLANKING TOTAL PERFORMANCE 84% TOTAL WEIGHT 2164


2 MPP 10 SQ WASHER 1/2" 41 41 6 CUTTING TIM 2 60000 1700 58300 1830 1700 RAGHAV RAM 93% 1 HOURS PRODUCTION 0.079 134.8

2 MPP 15 CA BASE PLATE 130 45 6 CUTTING COLIN OLD 500 500 0 755 500 ABHIJEET 66% 1 HOURS PRODUCTION 0.276 137.9

2 MPP 15 SSS 030 H 202 41 6 CUTTING ANTON OLD 500 700 -200 755 700 RAGHAV RAM 93% 1 HOURS PRODUCTION 0.391 273.4

BASE PLATE (640100) 30 MINUTES


3 MPP 17
TOP
90 90 4 CUTTING ANTON OLD 300 300 0 377 300 RAGHAV RAM 80% PRODUCTION
0.255 76.4

BASE PLATE (640161) 30 MINUTES


3 MPP 17
BASE 126 100 4 CUTTING ANTON OLD 300 330 -30 377 330 RAGHAV RAM 88% PRODUCTION 0.396 130.7

BASE PLATE (640361) 30 MINUTES


3 MPP 17
TOP 126 100 4 CUTTING ANTON OLD 300 330 -30 377 330 RAGHAV RAM 88% PRODUCTION 0.396 130.7

BASE PLATE (640352) 30 MINUTES


3 MPP 17
TOP 158 41 6 CUTTING ANTON OLD 300 160 140 377 160 RAGHAV RAM 42% PRODUCTION 0.306 48.9

BASE PLATE (640952) 30 MINUTES


3 MPP 17
TOP 158 41 6 CUTTING ANTON OLD 300 130 170 377 130 RAGHAV RAM 34% PRODUCTION 0.306 39.7

1 HOURS PRODUCTION
3 MPP 24 K1125 106 32 2.5 CUTTING STEFAN 36 12000 13400 -1400 16500 10700 RAGHAV RAM 65% BREAK DOWN 0.067 713.2

5 MPP 32 CNP M10 32 19 8 CUTTING NIGEL 4,5 144000 97000 47000 13300 11000 ANIL 83% 6 HOURS PRODUCTION 0.038 420.5

FINAL PROCESS TOTAL PERFORMANCE 93% TOTAL WEIGHT 2106


2 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 8000 NIRMALA 94% 90 % ACHIEVED 0.038 301.8

BASE PLATE (640352)


3 MPP 17
TOP 158 41 6 CUTTING ANTON OLD 300 220 126 SUMITRA 57% 1 HOUR PRODUCTION 0.306 38.5

BASE PLATE (640952)


3 MPP 17
TOP 158 41 6 CUTTING ANTON OLD 300 220 136 SUMITRA 62% 1 HOUR PRODUCTION 0.306 41.5

20 MPP 05 SSS 027 H 122 40 5 BENDING ROY 23 12000 377 250 SUMITRA 66% 1 HOUR PRODUCTION 0.173 43.3

22 MPP 06 SSS 013/H 179 40 5 STAMPING STEFAN 16 15400 2260 2000 BABITA 88% 3 HOURS PRODUCTION 0.253 506.0

22 MPP 21 SSS 012 S6(640310) 95 25 4 BENDING ANTON OLD 500 750 510 GULABI 68% 1 HOURS PRODUCTION 0.057 29.1

2 MPP25 RPC 83-91 BOTTOM 179 20 2 BENDING MARK OLD 5000 880 500 GULABI 57% 1 HOURS PRODUCTION 0.055 27.5

24 TH 03 CNP M10 32 19 8 THREADING NICK OLD 16400 20000 22300 CHUN CHUN 112% 100 % ACHIEVED 0.030 669.0

3 HOURS
24 DL 04 RPC 26-28 TOP 89 20 2 THREADING MARK OLD 9000 1330 1263 RANJU 95% 0.019 24.0
PRODUCTION
4 HOURS
24 DL 01 RPC 26-28 TOP 89 20 2 THREADING MARK OLD 9000 1770 1526 ANIL 86% 0.019 29.0
PRODUCTION
2 HOURS
24 DL 01 RPC 21-23 TOP 89 20 2 THREADING MARK OLD 9000 885 750 RANJU 85% 0.019 14.3
PRODUCTION
4 HOURS
24 DL 01 RPC 21-23 TOP 89 20 2 THREADING MARK OLD 9000 1770 1687 ANIL 95% 0.019 32.1
PRODUCTION

TOTAL PERFORMANCE 70% TOTAL WEIGHT 1756


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 20/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED PERFOR- REASION/ WEIGHT
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR WEIGHT IN
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER MANCE BRAKEDOWN PER PCS
KG
DAY

ROLLFORMING SECTION
2.5 HORS PRODUCTION
1 RFM 04 BBCA600 MM 600 133.5 2.5 ROLLING RSF 25 600 600 0 666 600 UMASHANKER 90% (POWER CUT) 1.57 944.4

2 HORS PRODUCTION
2 RFM 04 BBCA750 MM 750 133.5 2.5 ROLLING RSF 25 400 400 0 500 400 UMASHANKER 80% (POWER CUT) 1.97 787.0

2 HORS PRODUCTION
3 RFM 04 CA 900MM 900 133.5 2.5 ROLLING COLIN OLD 400 400 0 330 300 UMASHANKER 91% (POWER CUT) 2.36 708.3

3 RFM 04 41X41X2X6400 6400 133.5 2 ROLLING LOCAL _ 400 190 210 250 190 UMASHANKER 76% 6 hours production 13.43 2551.9

3 RFM 02 80X40X15X2X6400 6400 176 2 ROLLING LOCAL _ 400 75 325 88 75 KRISHNA 85% 4 hours production 17.71 1328.0

BLANKING TOTAL PERFORMANCE 87% TOTAL WEIGHT 6320


8 HOURS PRODUCTION
4 MPP 10 SQ WASHER 1/2" 41 41 6 CUTTING TIM 2 60000 11700 48300 14600 10000 RAGHAV RAM 68% HELPING 0.079 792.8

10 MINUTES
5 MPP 15 CA BASE PLATE 130 45 6 CUTTING COLIN OLD 500 600 -100 125 100 ABHIJEET 80% PRODUCTION 0.276 27.6

6 MPP 24 RPC 21-23 TOP 77 20 1.5 CUTTING MARK OLD 1500 1700 -200 1880 1700 RAGHAV RAM 90% 1 HOURS PRODUCTION 0.018 30.9

7 MPP 24 RPC 26-28 TOP 81 20 1.5 CUTTING MARK OLD 2500 1300 1200 1880 1300 RAGHAV RAM 69% 1 HOURS PRODUCTION 0.019 24.8

8 MPP 32 CNP M10 32 19 8 CUTTING NIGEL 4,5 144000 114000 30000 20000 17000 ANIL 85% 80 % AVHEIVED 0.038 649.9

FINAL PROCESS TOTAL PERFORMANCE 79% TOTAL WEIGHT 1526


NIRMALA /
9 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 7500 BABLI 88% 85 % ACHIEVED 0.038 283.0

4 HOUR PRODUCTION
10 MPP 15 CA BASE PLATE 130 45 6 CUTTING VICKY 24 3000 3000 2300 ABHIJEET 77% AND COIL UNLOADING 0.276 634.5

11 MPP 05 SSS 027 H 122 40 5 BENDING ROY 23 12000 3450 2750 SUMITRA 80% 80 % ACHIEVED 0.173 475.8

12 MPP 06 SSS 05 H 202 40 5 STAMPING STEFAN 16 100 1500 1200 SUSHMA 80% 80 % ACHIEVED 0.287 344.4

13 MPP 06 SC-U-2-1/2" 131 32 2.5 BENDING VALDES 13 40000 3000 2900 SUSHMA 97% 4 HOURS PRODUCTION 0.082 237.8
10 MINUTES
14 MPP 06 Z BRT ( 640352) 158 41 6 STAMPING ANTON OLD 100 125 120 BABITA 96% PRODUCTION 0.305 36.6

15 MPP 12 SSS 030 H 202 41 6 BENDING ANTON OLD 500 760 700 GULABI 92% 2 HOURS PRODUCTION 0.355 248.5

16 MPP 09 SSS 013 H 179 40 5 BENDING ROY 23 6000 2000 1630 SUSHMA 82% 3 HOURS PRODUCTION 0.257 418.9
LONG L BRT 30 MINUTES
17 MPP 21
(640310)
102 63 4 PUNCHING ANTON OLD 300 375 300 GULABI 80% PRODUCTION 0.121 36.3

GUSSET BRT
18 MPP25
(640300) 90 90 4 BENDING ANTON OLD 300 600 300 GULABI 50% 3 TIME PUNCHING 0.127 38.1

GUSSET BRT
19 MPP25
(640100) 90 90 4 BENDING ANTON OLD 300 600 300 GULABI 50% 3 TIME PUNCHING 0.127 38.1

20 TH 03 CNP M10 32 19 8 THREADING NICK OLD 16400 20000 20500 CHUN CHUN 103% 100 % ACHIEVED 0.030 615.0

3 HOURS
21 DL 04 RPC 26-28 TOP 89 20 1.5 THREADING MARK OLD 9000 1330 368 RANJU 28% 0.019 7.0
PRODUCTION
4 HOURS
22 DL 04 RPC 21-23TOP 81 20 1.5 THREADING MARK OLD 8000 1770 625 RANJU 35% 0.016 10.0
PRODUCTION
5 HOURS
23 DL 01 RPC 21-23 TOP 81 20 1.5 THREADING MARK OLD 8000 2000 1700 ANIL 85% 0.016 27.2
PRODUCTION

TOTAL PERFORMANCE 75% TOTAL WEIGHT 3451


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 22/05/2023

S CUT ORDER NO. / ORDER TOTAL TOTAL PRODUCED PERFOR- REASION/ WEIGHT TOTAL
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER TARGET OPERATOR
NO. LENGTH LOT NO. QTY PROD. BALANCE QTY PER MANCE BRAKEDOWN PER PCS WEIGHT IN KG
DAY

ROLLFORMING SECTION
3 RFM 04 41X41X2X6400 6400 133.5 2 ROLLING LOCAL _ 400 400 0 250 210 UMASHANKER 84% 6 hours production 13.43 2820.5

Day and night


3 RFM 04 41X41X2X6400 6400 133.5 2 ROLLING LOCAL _ 150 150 0 166 150 UMASHANKER 90% production 2.5 hours 13.43 2014.7
production break down

Day and night


3 RFM 02 80X40X15X2X6400 6400 176 2 ROLLING LOCAL _ 400 376 24 400 301 KRISHNA 75% production 17.71 5329.8

BLANKING TOTAL PERFORMANCE 83% TOTAL WEIGHT 10165


5 HOURS
4 MPP 10 SQ WASHER 1/2" 41 41 6 CUTTING TIM 2 60000 17700 42300 8000 6000 RAGHAV RAM 75% PRODUCTION 0.079 475.7
HELPING
3 HOURS
5 MPP 15 SSS 013 H 179 40 5 CUTTING VICKY 24 12000 5400 6600 2260 2000 ABHIJEET 88% PRODUCTION 0.281 562.8
HELPING

BASE PLATE 1/2 HOURS


6 MPP 17
(640160) 100 50 4 CUTTING ANTON OLD 300 300 0 377 300 ABHIJEET 80% PRODUCTION 0.157 47.2

BASE PLATE 1/2 HOURS


7 MPP 17
(640360) 100 50 4 CUTTING ANTON OLD 300 300 0 377 1300 ABHIJEET 345% PRODUCTION 0.157 204.4

TOP HAT WASHER 2.5 HOURS


7 MPP 26
M10 68 41 3 CUTTING RSF 25 6000 3800 2200 4500 3800 DEEPAK 84% PRODUCTION 0.066 249.8

8 MPP 32 CNP M10 32 19 8 CUTTING NIGEL 4,5 144000 131000 13000 20000 17000 ANIL 85% 80 % AVHEIVED 0.038 649.9

FINAL PROCESS TOTAL PERFORMANCE 126% TOTAL WEIGHT 2190


9 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 7800 NIRMALA / BABLI 92% 90 % ACHIEVED 0.038 294.3

1 HOUR
10 MPP 15 CA BASE PLATE 130 45 6 CUTTING VICKY 24 3000 755 500 ABHIJEET 66% PRODUCTION 0.275 137.5

MATERIAL STOCK
11 MPP 05 SSS 027 H 122 40 5 BENDING RSF 25 3000 3450 2300 SUMITRA 67% OUT 0.173 397.9

13 MPP 06 SC-U-2-1/2" 131 32 2.5 BENDING VALDES 13 40000 6800 5200 SUSHMA 76% 0.082 426.4
3 HOUR
14 MPP 07 K1125 101 32 2.5 BENDING STEFAN 36 13200 2260 2000 GULABI 88% PRODUCTION 0.063 126.0

2 OPERATOR
16 MPP 09 SSS 013 H 179 40 5 BENDING ROY 23 6000 6800 4800 SUMAN / GULABI 71% MACHINE 0.257 1233.6
OPERATTE

20 TH 03 CNP M10 32 19 8 THREADING NICK OLD 16400 20000 24600 CHUN CHUN 123% 100 % ACHIEVED 0.030 738.0

22 DL 04 RPC 21-23TOP 81 20 1.5 THREADING MARK OLD 8000 4000 3500 RANJU 88% 80 % ACHIEVED 0.016 56.0

TOTAL PERFORMANCE 84% TOTAL WEIGHT 3410


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 23/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL PRODUCED PERFOR- REASION/ WEIGHT TOTAL
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER BALANC TARGET OPERATOR
NO. LENGTH LOT NO. QTY PROD. QTY PER MANCE BRAKEDOWN PER PCS WEIGHT IN KG
E
DAY

ROLLFORMING SECTION
3 HOURS
3 RFM 04 41X41X2.5 3050 133.5 2.5 ROLLING ABHI 31 2800 150 2650 166 150 UMASHANKER 90% PRODUCTION 8.00 1200.1

SANTOSH 3 HOURS
3 RFM 02 80X40X15X2X6400 6400 176 2 ROLLING
ENERGY _ 400 436 -36 66 60 KRISHNA 91% PRODUCTION 17.71 1062.4

3.5 HOURS
3 RFM 02 80X40X15X2X6400 6400 176 2 ROLLING LOCAL _ 75 75 0 77 75 KRISHNA 97% PRODUCTION 17.71 1328.0

3.5 HOURS
3 RFM 02 80X40X15X2X5200 5200 176 2 ROLLING LOCAL _ 100 100 0 102 100 KRISHNA 98% PRODUCTION 14.39 1438.7

1 HOURS
3 RFM 01 41X21X2.5 3000 92 2.5 ROLLING INFANT 17 1500 30 1470 33 30 KRISHNA 91% PRODUCTION 5.42 162.7

BLANKING TOTAL PERFORMANCE 94% TOTAL WEIGHT 5192


5 HOURS
4 MPP 10 SQ WASHER 1/2" 41 41 6 CUTTING TIM 2 60000 25200 34800 8000 7500 RAGHAV RAM 94% PRODUCTION 0.079 594.6
HELPING
3 HOURS
5 MPP 15 SSS 013 H 179 40 5 CUTTING VICKY 24 12000 7400 4600 2260 2000 ABHIJEET 88% PRODUCTION 0.281 562.8
HELPING

BASE PLATE 20 MINUTES


6 MPP 17
(640110) 96.5 25 4 CUTTING ANTON OLD 600 200 400 250 200 DEEPAK 80% PRODUCTION 0.076 15.2

8 MPP 32 CNP M10 32 19 8 CUTTING NIGEL 4,5 144000 149000 -5000 20000 18000 ANIL 90% 90 % AVHEIVED 0.038 688.2

FINAL PROCESS TOTAL PERFORMANCE 88% TOTAL WEIGHT 1861


9 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 8500 NIRMALA 100% ACHIEVED 0.038 320.7

MATERIAL STOCK
11 MPP 05 SSS 027 H 122 40 5 BENDING RSF 25 3000 760 550 SUMITRA 72% OUT 0.173 95.2

1.5 HOURS
11 MPP 05 RPC 83-91 179 20 2 BENDING MARK OLD 5000 660 450 MAMTA 68% PRODUCTION 0.173 77.9

11 MPP 04 THW M10 68 41 3 BENDING RSF 25 6000 6800 4060 MAMTA 60% 0.173 702.4

2 HOURS
4 MPP 11 SQ WASHER 1/2" 41 41 6 STAMPING TIM 2 60000 1510 1500 MAMTA 99% PRODUCTION 0.079 118.9

13 MPP 06 SC-U-2-1/2" 131 32 2.5 BENDING VALDES 13 40000 6800 4400 SUSHMA 65% 0.082 360.8
1 HOURS
14 MPP 07 K1125 101 32 2.5 BENDING STEFAN 36 13200 6800 4700 GULABI / SUSHMA 69% PRODUCTION 0.063 296.1

3 HOURS
16 MPP 09 SSS 013 H 179 40 5 BENDING ROY 23 6000 2260 2100 SUMAN / GULABI 93% PRODUCTION 0.257 539.7

20 TH 03 CNP M10 32 19 8 THREADING NICK OLD 16400 20000 21300 CHUN CHUN 107% 100 % ACHIEVED 0.030 639.0

SPRING
22 MPP 28 HHB10X50 32 19 8
ATTACHMENT
NIGEL OLD 18000 3500 2080 BABITA 59% 0.016 33.3

TOTAL PERFORMANCE 79% TOTAL WEIGHT 3184


DAILY PRODUCTION AND PERFORMANCE REPORT
CUTTING (unit - 1) and (unit - 2 ) DATE - 24/05/2023

TOTAL
S CUT ORDER NO. / ORDER TOTAL PRODUCED PERFOR- REASION/ WEIGHT TOTAL
M/C NO. ITEM MATERIAL SIZE OPERATION CUSTOMER BALANC TARGET OPERATOR
NO. LENGTH LOT NO. QTY PROD. QTY PER MANCE BRAKEDOWN PER PCS WEIGHT IN KG
E
DAY

ROLLFORMING SECTION
2 HOURS
3 RFM 04 41X41X2.5 3050 133.5 2.5 ROLLING ABHI 31 2800 250 2550 111 100 UMASHANKER 90% PRODUCTION 8.00 800.1

BLANKING TOTAL PERFORMANCE 90% TOTAL WEIGHT 800


5 HOURS
4 MPP 10 SQ WASHER 1/2" 41 41 6 CUTTING TIM 2 60000 32200 27800 8000 7000 RAGHAV RAM 88% PRODUCTION 0.079 554.9
HELPING

MATERIAL
5 MPP 15 SSS 013 H 179 40 5 CUTTING VICKY 24 12000 11400 600 6800 4000 ABHIJEET 59% SORTING 0.281 1125.6

5 MPP 16 SSS 020 H 102 60 2.5 CUTTING NICK OLD 2000 1350 650 6000 1350 ANIL 23% WITH HELPING 0.120 162.3

1 HOURS
6 MPP 17 SSS 019 H 135 137 6 CUTTING ANTON OLD 300 350 -50 555 350 RAM PRATAP 63% PRODUCTION 0.872 305.3

BASE PLATE 40 MINUTES


6 MPP 17
(640110) 96.5 25 4 CUTTING ANTON OLD 600 600 0 500 400 ANIL 80% PRODUCTION 0.076 30.3

2 HOURS
6 MPP 26 THW M10 68 41 3 CUTTING RSF 25 6000 7500 -1500 3800 3700 ROSHAN 97% PRODUCTION 0.066 243.2

8 MPP 32 CNP M10 32 19 8 CUTTING NIGEL 4,5 144000 168000 -24000 20000 19000 ANIL 95% 90 % AVHEIVED 0.038 726.4

FINAL PROCESS TOTAL PERFORMANCE 72% TOTAL WEIGHT 3148


9 MPP 03 SC-U-1" 75 32 2 BENDING VALDES 13 240000 8500 9000 RADHA 106% 100 %ACHIEVED 0.038 339.6

3 HOURS
11 MPP 04 THW M10 68 41 3 BENDING RSF 25 6000 2266 2100 MAMTA 93% PRODUCTION 0.173 363.3

1 HOURS
4 MPP 11 SQ WASHER 1/2" 41 41 6 STAMPING TIM 2 60000 755 550 MAMTA 73% PRODUCTION 0.079 43.6

1 HOURS
14 MPP 07 K1125 101 32 2.5 BENDING STEFAN 36 13200 6800 6000 SUSHMA 88% PRODUCTION 0.063 378.0

1 HOURS
16 MPP 09 SSS 013 H 179 40 5 BENDING ROY 23 6000 755 500 SUMAN 66% PRODUCTION 0.257 128.5

20 TH 03 CNP M10 32 19 8 THREADING NICK OLD 16400 20000 20600 CHUN CHUN 103% 100 % ACHIEVED 0.030 618.0

SPRING
22 MPP 28 HHB10X50 32 19 8
ATTACHMENT
NIGEL OLD 18000 3500 1935 BABITA 55% 0.016 31.0

TOTAL PERFORMANCE 83% TOTAL WEIGHT 1902


MIS 15/05/2023 TO 20/06/2023
DATE INCOMING FINAL ROLL FORMING
5/15/2023 3.424 2.749
5/16/2023 6.12 3.769 3.462
5/17/2023 2.456 1.415
5/18/2023 2.617 0.707
5/19/2023 2.164 1.756
5/20/2023 16.26 2.44 3.451
5/21/2023 21.74 3.887
Total weight in tonnage 44.12 16.87 17.427
MIS 22/05/2023 TO 27/06/2023
DATE INCOMING FINAL ROLL FORMING
5/22/2023 18.82 3.41 10.165
5/23/2023 3.184 5.192
5/24/2023 1.902 0.800
5/25/2023
5/26/2023
5/27/2023
5/28/2023
Total weight in tonnage 18.82 8.496 16.157