Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PRODUCED BY AN AUTODESK STUDENT VERSION

LC NO.AB-65 DATE 03.11.2022


L/C OF 'SPL' CLASS (M) L.C. NO AB-65

BHAIYATHAN ROAD
S.E.C. RAILWAY LAND S.E.C. RAILWAY LAND

BHAIYATHAN ROAD
1
186.9
.40
153

CH:=993000
F.L.=547.600
4
1 198.3
186.9

CH:=993400
F.L.=545.460
GRADE(ROAD) 1 IN 20

SPEED BREAKER AT AT 20 M.
EXTG.UP LINE

FROM GATE POST.


LEGEND:
SHEOPRASAD NAGAR
SURAJPUR 6.50
EXTG WORKS:
PROP DN LINE.
PROP WORKS:
5.00 M
DISMT. WORKS:
WARNING SIGN BOARD FOR SPEED BREAKER TO
BE PROVIDED AT LOCATION AS PER ANNEXURE 7
9/7 PARA 918 (2) OF IRPWM (60M FROM L.C.) A 207 923.0 207
150

CH:=1004640
F.L.=540.335

CH:=1004220
SPEED BREAKER AT 20 M. FROM GATE POST.

F.L.=538.306
BOARD No. C-37, 50 TO 100M FROM L.C. (TO NOTE:
BE PROVIDED BY ROAD AUTHORITIES)
1. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
BOARD No. C-36, 200M FROM L.C. (TO 2. BLACK TOPPING OF ROAD SURFACING TO BE MADE WITHIN RAILWAY BOUNDARY.
2.50m WIDE ROAD

(EX-HEIGHT GAUGE 4.67 M. HIGH )


FORMATION BE PROVIDED BY ROAD AUTHORITIES) 3. LEVEL CROSSING ROAD SURFACE IS BLACK TOP OR PCC BLOCK FOR HEAVY TRAFIC

2.50m WIDE ROAD


FORMATION
WARNING SIGN BOARD FOR AT SUITABLE S.E.C. RAILWAY LAND S.E.C. RAILWAY LAND 4. ALL THE TERMS OF THE TABLE AT ANNEXTURE 9/1 PARA-904 OF IRPWM-2004
POINT OUTSIDE OF RLY. BOUNDARY (TO WILL BE FOLLOWED.
6.70 BE PROVIDED BY ROAD AUTHORITIES) 5. THIS DRAWING IS PREPARED BASED ON PCE's DRG NO............
6. TVU-63320, MAR - 2021

RAJOLIPARA
LEVEL 15 M FOR CLASS I ROAD
2.500 M
2.500 M
S.E.C. RAILWAY LAND S.E.C. RAILWAY LAND
EXG. HEIGHT GAUGE
20.00 M 20.00M
BOARD OF SECTION-146 &160 OF I.R ACT
(TO BE PROVIDED AT SUITABLE DISTANCE
( KEY PLAN )

PRODUCED BY AN AUTODESK STUDENT VERSION


(600m FROM GATE POST)
PRODUCED BY AN AUTODESK STUDENT VERSION

15.00M
( NOT TO SCALE)
WHISTLE BOARD

EXG. LIFTING BARRER 11 M. 8.23 M


SAFETY CHAIN
8.23 M

CL OF EXTG LC AB: 65 CH:1004282.0


12.90M

GATE POST
C.L. OF EXTG. LEVEL X-ING NO. AB 65 - KM SURAJPUR STATION
TURN STYLE 1005.500 K M .
15.0 M LONG RAIL FENCING ALONG TRACK SHEOPRASAD NAGAR STATION
WICKET GATE
GATE POST 991.443 K M.
GATE POST
897.96
W

5.00 M 593.3
LEVEL 160 150 160 207 23.07 7 897.96 593.30 0 253
L

16.00M 38.00M 150 207 9 923.0 .16


MAST NO 978/33 3.0M MAST NO 978/30 3.00M 160 150 160 150

F.L.=539.795
CH:=1005480
CH:=1002960

F.L.=540.350
CH:=1004220

CH:=1004640

CH:=1004820

F.L.=538.750
F.L.=524.806

F.L.=526.806
CH:=1002140

CH:=1002460

F.L.=530.139

CH:=1006100
F.L.=540.335
F.L.=538.306
CH:=1003520
F.L.=533.639
CL OF EXTG UP LINE
UL LINE

SECTION AT `A-A'
GATE POST TO BE DISMANTLED 7.50 M GATE POST TO BE DISMANTLED 3.00 M 3.00M
CHECK RAIL 2 M.MORE THAN

GATE POST TO BE DISMANTLED


WIDTH OF ROAD 5.00 M
SURAJPUR 6.50M SHEOPRASAD NAGAR 6.50M
EXG. FENCING TO BE DISMANTLED EXG. FENCING TO BE DISMANTLED
CHECK RAIL 2 M.MORE POSITION OF GRADIENT POST FROM C.L.
THAN WIDTH OF ROAD
EXGT. GATE BARRIER TO BE DISMANTLED OF PROPOSED MANNED LC 'SPL' CLASS
PROP DN LINE. C.L. OF PROP. DN LINE LEVEL CROSSING ON EITHER SIDE
2.50 M 8.00 M 2.50 M

(EX-HEIGHT GAUGE TO BE
DISMANTLED)
8.00M
12.50M 3.00 M 3.00M
ONE Nos. DETONATORS

PROP. GATE POST


(600m FROM GATE POST)

5.00 M (600m FROM GATE POST)


(600m FROM GATE POST)
ONE Nos. DETONATORS

WHISTLE BOARD

L
WHISTLE BOARD

6.00M GATE POST GATE POST

W
(600m FROM GATE POST)

CL OF EXTG LC AB: 65 CH:1004282.0


15.0 m LONG RAIL FENCING
TURN STYLE
ALONG TRACK C.L. OF EXTG. LEVEL X-ING NO. AB 65 - KM
WICKET GATE 23.74M SHEOPRASAD NAGAR STATION
8.00 M (EXISTING HEIGHT GAUGE TO BE DISMANTLED) 991.443 K M. SURAJPUR STATION
13.50M 1005.500 K M .

BLACK TOP ROAD


20.00 M POST FOR SAFETY CHAIN 20.00M 7
23.0 897.9

LEVEL 15 M FOR CLASS I ROAD


7 897.9
EXTG. GATE 8.00M 98.47 79 932.0 6 6 593 593.3
8 151 151 1 198.4 .3 0 0 253
GOOMTY
LIFTING BARRIER11.0m 452.3 .38 .16
.67

F.L.=540.350
CH:=1004820
452

F.L.=540.335
166

CH:=1004380

CH:=1004640

F.L.=539.795
CH:=1005480
F.L.=539.025

F.L.=538.750
CH:=1006100
CH:=1002060
SPEED BREAKER TO BE DISMANTLED

CH:=1001300
F.L.=521.990

F.L.=523.670
15.00M
(PROP HEIGHT GAUGE TO BE PROVIDED AT
8.0M FROM GATE POST )
20.00 M

(PROP-HEIGHT GAUGE 8 M FROM GATE POST )


20.00M
TIEBAR/STEEL GRILL
FENCING MIN .HEIGHT 2 M.

(PROP HEIGHT GAUGE 4.67 M. HIGH )


POSITION OF GRADIENT POST FROM C.L.
OF EXTG. MANNED LC 'SPL' CLASS
EXTG.SPEED BREAKER AT 20 M. FROM LEVEL CROSSING ON EITHER SIDE
GATE POST TO BE DISMANTLED .
25 M 25 M Signature block
S.E.C. RAILWAY LAND S.E.C. RAILWAY LAND

C.L. OF ROAD
LC NO.-AB-65
DRM-BSP
BOARD OF SECTION-146 &160 OF I.R ACT
BOARD No. C-37, 50 TO 100M FROM L.C. (TO (TO BE PROVIDED AT SUITABLE DISTANCE
BE PROVIDED BY ROAD AUTHORITIES) CSTE CON BSP

SPEED BREAKER AT 20 M. FROM 600m 600m CEE CON BSP


WARNING SIGN BOARD FOR SPEED BREAKER TO
GATE POST. AS PER
BE PROVIDED AT LOCATION AS PER ANNEXURE
ANNEXURE-9/6 IRPWM.
SIGH
T LINE TRD comments: The locations
GRADE(ROAD) 1 IN 50
OF S SHEOPRASAD NAGAR
CE CON 2 BSP

SPEED BREAKER AT 20 M. FROM


GATE POST. AS PER
ANNEXURE-9/6 IRPWM.
9/7 PARA 918 (2) OF IRPWM (60M FROM L.C.)
2.50m WIDE ROAD

OF
2.50m WIDE ROAD

SURAJPUR
LINE 5.0 M. IGHT
A of OHE masts referred in the
FORMATION

FORMATION

BOARD No. C-36, 200M FROM L.C. (TO SRDEN-CORD-B


BE PROVIDED BY ROAD AUTHORITIES) SP
drawing does not match with the SRDEE-G-BSP

WARNING SIGN BOARD FOR AT SUITABLE


5.00M
LINE T locations given in the title box. SRDEE-TRD-BS
POINT OUTSIDE OF RLY. BOUNDARY (TO OF S
5.0 M.
OF SIGH P
BE PROVIDED BY ROAD AUTHORITIES)
2.50 M
IGHT LINE Hence the necessary corrections SRDSTE-LINE-B
2.50 M
are to be done. SP
Sr.DEN-SPLW-B
SP
NIRMAL KUMAR VISHWAKARMA Digitally signed by
DCSTE CON
NIRMAL KUMAR VISHWAKARMA
SDL
Date:2022.12.12 06:10:21 +05'30'
ASHOK KUMAR VERMA Digitally signed by ASHOK
DCEE CON HQ
KUMAR VERMA

S&T comments:
BSP
VISIBILITY DIAGRAM Date:2022.12.16 05:00:05 +05'30'
PRADEEP NAMDEORAO TURALE Digitally signed by
( NOT TO SCALE) DCE CON SDL PRADEEP NAMDEORAO TURALE
NAURA

01. JPO NO.SECR/S&T/POLICY/889, DATED:05.07.12 FOR JOINT PROCEDURE


Date:2022.12.08 05:55:53 +05'30'

ORDER FOR UNDERTAKING EARTH WORK IN THE VICINITY OF CABLES TO


BE FOLLOWED STRICTLY BY ENGG DEPTT.
PLAN
02. Joint survey shall be conducted including SSE/Sig & SSE/Tele of open line with
DETAILS OF L.C. PINK BOOK ITEM No.- 26 OF 2020-21 (BRND-SJQ/DOUBLING LINE)
S.NO DESCRIPTION DETAILS

executing agency and report to be enclosed/attached.Observations of Joint survey


SOUTH EAST CENTRAL RAILWAY-BILASPUR
1. L.C NO AB-65
C. E. /C./BSP's DRG. No.-
shall be strictly followed. 2. CLASS OF L.C SPL (MANNED)

03. Shifting of cables to be done prior to start of earth work.


TVU 270642 MAR-2021
3.

4. TYPE OF ROAD CLASS-I

04. If digging work is required prior intimation to S&T staff shall be given. 5. ROAD WIDTH 5.00 M GAD FOR PROP. EXTENSION OF LC No. AB-65' SPL CLASS ( MANNED) AT
Km:1004/5-7 IN BETWEEN SHEOPRASAD NAGAR-SURAJPUR STATIONS
05. Cables shall not be exposed/ unattended to avoid possibility of cable cut/theft. 6. FORMATION WIDTH
NORMAL POSITION
2.50 M
OPEN TO ROAD.
IN CONNECTION WITH PROP BRND-SJQ DOUBLING LINE.
06. Where proposed earthwork is in close vicinity or infringing the existing under ground 7. OF GATE TRAFFIC
SCALE-1:200 DRAW BY CHECKED BY

cable, the same shall be identified by cross trench or cable route tracer.
07. S&T staff of open line should be informed prior to start of earth work to protect
existing underground S&T cables(Railway) and Cost of damage, if any cable would
Signature Not be damaged during the work is to be borne by the firm while executing the work.
Verified
Digitally signed by
SACHIN PRADHAN
Date: 2023.06.06
19:21:51 IST
Reason: IREPS-CRIS PRODUCED BY AN AUTODESK STUDENT VERSION