A tower crane inspection checklist was used to inspect a tower crane for safety and functionality. The 19-item checklist covered aspects like the physical condition of the crane, cabins, foundations, safety devices, hydraulic and electrical systems, load charts, and operator certification. Any issues identified during the inspection would be noted. Upon completion, the inspector would determine if the crane was fit for use and sign off on the inspection report.
A tower crane inspection checklist was used to inspect a tower crane for safety and functionality. The 19-item checklist covered aspects like the physical condition of the crane, cabins, foundations, safety devices, hydraulic and electrical systems, load charts, and operator certification. Any issues identified during the inspection would be noted. Upon completion, the inspector would determine if the crane was fit for use and sign off on the inspection report.
A tower crane inspection checklist was used to inspect a tower crane for safety and functionality. The 19-item checklist covered aspects like the physical condition of the crane, cabins, foundations, safety devices, hydraulic and electrical systems, load charts, and operator certification. Any issues identified during the inspection would be noted. Upon completion, the inspector would determine if the crane was fit for use and sign off on the inspection report.
A tower crane inspection checklist was used to inspect a tower crane for safety and functionality. The 19-item checklist covered aspects like the physical condition of the crane, cabins, foundations, safety devices, hydraulic and electrical systems, load charts, and operator certification. Any issues identified during the inspection would be noted. Upon completion, the inspector would determine if the crane was fit for use and sign off on the inspection report.
Company Name : Date of Inspection : Make : Model : Number : Owned/Hired/Contractor : SN Details Yes/No Comments 1 Tower crane should be physically in good condition, free from defects and should have valid TPI. 2 Cabin should be in good condition, equipped with wind glasses and wireless communication. 3 Proper foundation provided as per design. 4 Safety latch in hook and in working condition. 5 Safe working load should be marked. 6 All Sling should be free from defects. 7 Hydraulic cylinder, hoses should be in good condition and free from leakage. 8 Trolley condition should be in good condition. 9 Over hoist limit switch should be in working condition. 10 Limit switch should be provided and in working condition. 11 Counter weight should be properly fixed and free from defects. 12 Tower crane should be grounded properly as per standard. 13 Safe load indicator should be in working condition. 14 Anemometer should be in working condition. 15 Power cable should be free from damages. 16 All power connection should be taken through industrial plug. 17 Load Chart Available in Operator cabin. 18 First Aid Kit should be available in operator cabin (with in expiry date). 19 Fire Extinguisher available (in good condition, pressure within range) 20 Operator have suitable license and valid experience certificate as per requirement.
Fit for use: Yes/No
Inspection Done By:
Name: Department: Designation: Signature: Date:
Review Done By:
Name: Department: Designation: Signature: Date:
For Information purpose only https://globalehs.co.in | Page 1 of 1