RENCANA ANGGARAN BIAYA

Client : PT. Jasa Sarana


Project :
Date : Jl. Sindang Palay No.2, Ciateu
Location : Bandung 40252, Jawa Barat - Indonesia
PIC : 089-535-777-3-777
Contact : 7ruang.eventmanagement@gmail.com

JUMLAH
NO ITEM VOL SATUAN HARGA SATUAN SUB TOTAL
HARI EVENT
1 2 3 4 5 6 7 8
PRODUCTION
1 STAGE
1.1 Mini stage 4x5 tinggi 40cm + garden 20 M2 1 1 Rp 400,000 Rp 8,000,000
1.2 Backdrop stage 3x5 15 Meter 1 1 Rp 240,000 Rp 3,600,000
TOTAL BIAYA STAGE : Rp 11,600,000
2 DEKORASI
2.1 Welcome gate 4x5 m 1 Unit 1 1 Rp 5,000,000 Rp 5,000,000
2.2 Wall of fame 3x8 1 Unit 1 1 Rp 2,500,000 Rp 2,500,000
2.3 Backdrop photobooth 4x3 1 Unit 1 1 Rp 2,500,000 Rp 2,500,000
2.4 Kursi sofa 8 8 Pcs 1 1 Rp 50,000 Rp 400,000
2.5 Meja 4 4 Pcs 1 1 Rp 50,000 Rp 200,000
2.6 Kursi futura + skriting 30 20 Pcs 1 1 Rp 30,000 Rp 600,000
2.7 Tenda rooders 5x20 100 Meter 1 1 Rp 200,000 Rp 20,000,000
TOTAL BIAYA DEKORASI : Rp 31,200,000
3 LED VIDEOTRONE
3.1
LED 3x3 cover frame + breket 9 Unit 1 1 Rp 750,000 Rp 6,750,000
TOTAL BIAYA LED : Rp 6,750,000
4 SOUND SYSTEM
4.1 Sound 10.000watt 1 Set Rp 5,000,000 Rp 5,000,000
TOTAL BIAYA SOUND SYSTEM : Rp 5,000,000
5 GENSET
5.1 Genset 60 KVA 1 Unit 1 1 Rp 5,250,000 Rp 5,250,000
TOTAL BIAYA GENSET : Rp 5,250,000
6 Lain Lain
6.1 kipas ac besar 6 6 Unit 1 1 Rp 300,000 Rp 1,800,000
6.2 pacul + pita 8 8 Unit 1 1 Rp 50,000 Rp 400,000
TOTAL BIAYA MULTIMEDIA SYSTEM : Rp 2,200,000
EVENT MANAGEMENT
7 MAN POWER MANAGEMENT
7.1 Show director 1 Person 1 1 Rp 3,500,000 Rp 3,500,000
7.2 Creative 1 Person 1 1 Rp 2,000,000 Rp 2,000,000
7.3 Production asistain 1 Person 1 1 Rp 2,000,000 Rp 2,000,000
7.4 Floor director 1 Person 1 1 Rp 1,500,000 Rp 1,500,000
7.5 Crew runner 1 Person 1 1 Rp 1,000,000 Rp 1,000,000
TOTAL BIAYA MANPOWER LAINNYA : Rp 10,000,000
8 TALENT
8.1 MC 1 Person 1 1 Rp 6,000,000 Rp 6,000,000
8.2 Electone 1 Team 1 1 Rp 5,000,000 Rp 5,000,000
TOTAL BIAYA TALENT LAINNYA : Rp 11,000,000
9 TECHNICAL SUPPORT
9.1 Handy Talky 8 Unit 1 1 Rp 75,000 Rp 600,000
9.2 Clearcom 8 Unit 1 1 Rp 350,000 Rp 2,800,000
TOTAL BIAYA TECHNICAL SUPPORT LAINNYA : Rp 3,400,000
10 MEALS
10.1 Meals 10 Person 1 1 Rp 40,000 Rp 400,000
TOTAL BIAYA TECHNICAL SUPPORT LAINNYA : Rp 400,000
11 ADDITIONAL COST
11.1 Additional Cost 1 unit 1 1 Rp 30,000,000 Rp 30,000,000
Rp
TOTAL BIAYA ADDITIONAL COST LAINNYA : 30,000,000
TOTAL BIAYA : Rp 116,800,000

Catatan :
1. Harga Diluar PPN
2. Validity : 7 Hari
3. Payment : 50% DP, 50 % Saat Hari H
4. Term & Condition : Perubahan, Penambahan atau pengurangan Alat / Spectek minimal H-7 sebelum acara
5. Untuk Pertanyaan dan Info lebih lanjut Hubungi :
1. Rega Budiman : 0818288815
2. Gilang Yudiantara : 089655247654

Approved By, Best Regards,


( ) Rega Budiman
* Mohon diisi nama, tanda tangan & stempel ( Project Manager )