Cat® LatchFree Link Removal-Install Procedures

Camshaft Assembly

Instructor Information (please print)

Name Title/Role

Department Date
Lab J – Camshaft Assembly

LatchFree™ Link Removal and Install Procedure 3/28/18


Module 13 – Camshaft Assembly
AEXQ2341_ INSV1.0
Caterpillar: Confidential Green

Caterpillar: Confidential Green


Cat® LatchFree Link Removal-Install Procedures
Camshaft Assembly

Introduction
In order to perform the Camshaft Assembly procedure, the prep, replacement and inspection must be
completed prior.

Module Objectives:

Given a camshaft, the appropriate service literature, tooling and the Lab J Worksheet, the participant will be
able to:
 Perform a Job Safety Analysis on the prescribed task.
 Safely perform the Camshaft Assembly Procedure and return the machine to operational conditions as
indicated on the Lab J worksheets with no errors and within the required time (1 hour).

Lab Tooling:

 Camshaft
 Tools as instructed
 Lab Instructions
 Reference Materials

Instructor Notes:

Participants will perform the Camshaft Assembly Procedure as described on the instructor worksheet. The
participant must perform all the steps with 100% accuracy, within the time allotted (1 hour) and in a safe and
secure manner.
 Ensure all procedure steps are completed.
 Ensure participant prepares a Job Safety Analysis.
 Ensure participant has appropriate PPE before starting the lab.
 Ensure participant has completed the knowledge portion of the training prior to conducting the procedure.
 Ensure machine is placed in a safe work condition before participant conducts the procedure.
 Ensure when training is completed, component is returned to operational conditions.
 Ensure all documents are signed and acknowledged as needed.
 Ensure that training documents are returned to training department when completed.
The lab is composed of the following training elements:
 Safety Performance
 Task Performance
Safety Performance

1. Safety – Job Safety Analysis

Before service, the equipment or machinery must be placed in a safe working condition and the
Yes No
participant must be prepared to perform the procedure safely.

LatchFree™ Link Removal and Install Procedure 3/28/18


Module 13 – Camshaft Assembly
AEXQ2341_ INSV1.0
Caterpillar: Confidential Green

Caterpillar: Confidential Green


Cat® LatchFree Link Removal-Install Procedures
Camshaft Assembly

Step 1 Is participant qualified to perform the task?

Step 2 Has participant’s prerequisites been completed prior to performing the task?

Step 3
Participant wears appropriate PPE.
(Safety shoes/boots, glasses, reflective vest, etc.).

Step 4 Participant performs Job Safety Analysis below.

Step 5 Participant has the proper tools and support documents to perform the task?

Step 6 Participant places machine/system in a safe work condition before starting the procedure?

JSA JOB BEING PERFORMED:


_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________
______________________________________________________________________________________________________________

PPE REQUIRED:
_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________
______________________________________________________________________________________________________________

STEP SEQUENCE OF JOB TASKS:


_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________

POTENTIAL HAZARDS & EFFECTS:


_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________

RECOMMENDED PROCEDURES OR CONTROLS:


_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________
_________________________________________________________________________________________________________________

Participant confirms that he/she has completed all the safety steps as required by the procedure and that the equipment and/or machine is
secured and ready to be used for the procedure.

Participant Name Date

Performance Task

Perform the Camshaft Preparation Procedure. Yes No Completed

LatchFree™ Link Removal and Install Procedure 3/28/18


Module 13 – Camshaft Assembly
AEXQ2341_ INSV1.0
Caterpillar: Confidential Green

Caterpillar: Confidential Green


Cat® LatchFree Link Removal-Install Procedures
Camshaft Assembly

Before the camshaft assembly procedure is


performed, participants should perform the following:

Step 1  Preparation
– Participants will verify that the work area allows
room for the camshaft.

– Participants will acquire a .005 inch shim steel to


cover any snap ring grooves that could damage
the seals on the shouldered composite bushing
Step 2 during assembly.

Instructor Confirmation

Participant confirms he/she has completed all the steps as required by the procedure and that the equipment is secured and ready for
camshaft Assembly.

Participant Name Location

Instructor Name Date

Performance Task

LatchFree™ Link Removal and Install Procedure 3/28/18


Module 13 – Camshaft Assembly
AEXQ2341_ INSV1.0
Caterpillar: Confidential Green

Caterpillar: Confidential Green


Cat® LatchFree Link Removal-Install Procedures
Camshaft Assembly

Perform the Camshaft Assembly Procedure. Yes No Completed

Once preparation is completed, participants should


perform the following camshaft assembly:
 Camshaft Assembly
– Once protected, slide the shouldered composite
bushing onto the camshaft until it rests against
the cam as shown.
Step 1

– Participant will install a boot cover at the opposite


end of the camshaft. Ensure the sealing edge is
oriented correctly.

Step 2

– Participants will install a snap ring and back-up


washer. Slide composite bushing onto camshaft.

Step 3 Note:
 Do not apply green Loctite.

– Participants will install back-up washer and snap


ring.
Step 4

Instructor Confirmation

LatchFree™ Link Removal and Install Procedure 3/28/18


Module 13 – Camshaft Assembly
AEXQ2341_ INSV1.0
Caterpillar: Confidential Green

Caterpillar: Confidential Green


Cat® LatchFree Link Removal-Install Procedures
Camshaft Assembly

Participant confirms that he/she has completed all the steps as required by the procedure and that the equipment and/or machine is secured
and ready to return to operation.

Participant Name Location

Instructor Name Date

Instructor Additional Comments:

LatchFree™ Link Removal and Install Procedure 3/28/18


Module 13 – Camshaft Assembly
AEXQ2341_ INSV1.0
Caterpillar: Confidential Green

Caterpillar: Confidential Green


Cat® LatchFree Link Removal-Install Procedures
Camshaft Assembly

Participant Additional Comments:

“CAT”, “CATERPILLAR”, their respective logos, “Caterpillar Yellow” and the “Power Edge” trade dress as well as corporate and
product identity used herein, are trademarks of Caterpillar and may not be used without permission.
© 2018 Caterpillar All Rights Reserved

LatchFree™ Link Removal and Install Procedure 3/28/18


Module 13 – Camshaft Assembly
AEXQ2341_ INSV1.0
Caterpillar: Confidential Green

Caterpillar: Confidential Green

You might also like