MOPC-Procedure For Personnel (After Dupont Revision)
MOPC-Procedure For Personnel (After Dupont Revision)
ISSUE 1
July 2004
* Confidentiality *
This information is and shall remain confidential to The PIC Fertilizer Manufacturing.
Accordingly, PIC Fertilizer Manufacturing retains all copyrights and no copying in any
format of this document is permitted without written authorization from the CHSEC
Chairperson of PIC.
Date
PSM
PROCESS SAFETY MANAGEMENT Created on
Procedure No.
PROCEDURES Sept 19th , 2004
1- Introduction
2- PURPOSE
The purpose of this procedure is to define the steps, which will ensure that, safety is
taken into consideration prior to implementation.
3- SCOPE
This procedure applies any process, procedure, practices, and personnel change
which will directly impact any of PSM processes in PIC Fertilizer plant.
4- RESPONSIBILITIES
All employees are required to be aware of and understand the MOPC process.
The application and control of the MOPC program activity is the responsibility of Area
Management & the PSM committee.
5- Abbreviations
6- Reference
If the proposed personnel change affects one or more of the PSM elements,
then the MOPC process will have to be followed.
7.2 Promotion
9- Follow-up
The PSM committee will carry out this follow-up auditing: Once the
personnel change has been implemented there should be a follow-up
(auditing) to make sure that all precautions and preparations were handled
properly.
In particular, a check should be carried out to make sure that everyone
received the current training. In general, the following five actions will
provide a good framework.
9- Attachments
Department
Section Date
Location
Job Title
Type of change:
Newly Hired Employee
Promotion
Transferring Employees & Acting responsibility
Description of Proposed Personnel change:
Superintendent signature/Date:
Date
PSM
PROCESS SAFETY MANAGEMENT Created on
Procedure No.
PROCEDURES Sept 19th , 2004
Notes:
The minimum required score of Pass is 75%.
This form shall be filed in the concerned employee file & copy should be submitted
to T&C.
Completion certificate will be submitted to the passed employee.