Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

BALAJI HARIKRISHNAN

Senior Engineer – Civil & Structural

Ce.balaji@gmail.com
Mobile no : + 968 98258867

Summary
16+yrs of experience in Front End Engineering and Detailed engineering and design of RCC and Steel

Structures, modular pipe racks, equipment foundations, Co-ordination of all engineering and design activities

using international standards (ASTM, BS, BS-EN, IS, GOSH etc), inter-discipline co-ordination, review/check

and approval of vendor documents, Compliance with requirement of project standards and specifications,

conversant with GASCO, ADNOC, BP, Shell DEP’s, PDO specifications and guidelines. Well-versed in design

tools like STAAD Pro, ETABS, SAFE, MAT-3D, FOUNDATION 3-D & STAAD FDN. Good knowledge in AutoCAD,

3D Modeling package PDMS & Navisworks. Attending HAZOP review, client meetings and site progress

meetings for timely execution of the projects Including DEM1/DE2 standards, As-Built Drawing compliances,

involved in project Manhour estimate on IMC contract, preparation of specifications and material take-off.

Extensive work experience in Oman , UAE & India on various LNG, Oil and Gas Utility & Industrial projects.

Experience Highlights

2015 - Present SENIOR CIVIL ENGINEER, WORLEY, MUSCAT, OMAN

 GREATER BIRBA CLUSTER PROJECT- EPCM , SULTANATE OF OMAN (2015-2022)

 IMC CONTRACT , SULTANATE OF OMAN, (2019-TILL NOW)

 GREATER AL HUWAISAH AREA DEVELOPMENT-PDO FEED CONTRACT (2020-2021)

 BP OMAN BLOCK 61 ,SULTANATE OF OMAN (2018-2019)

 ADNOC- MAXIMIZING ETHANE RECOVERY AND MONETIZATION PROJECT (MERAM)

 OLNG POWER PLANT – AS-BUILT

CV_Balaji.Harikrishnan_Senior Civil engineer


BALAJI HARIKRISHNAN

Experience Details

2015 - Present SENIOR CIVIL ENGINEER, WORLEY, MUSCAT, OMAN

Achievements:-
PDO Shukran Al-Noor Critical Project - Certificate of outstanding Achievement,
PDO Shukran Harweel 2 AB project shutdown - Certificate of outstanding Achievement,

PDO –Greater Al Huwaisah Area Development – Phase 1 ,SULTANATE OF OMAN,


Involved on analysis, design and documentation of following structures as per PDO and Shell
DEP standard inline with BS-EN code.
 GGP on plot Facility – Test Separator foundation,

 Pipe support, Goal post and trestle.

 RV platform structure with Fire proofing ( 7.5m x 14.6m x 14.m ht)

 ESDV valve platform.

 RMS 1,2,& 3 - Pipe support, Access platform

 Flange pit,

 Equipment Sunshade,

 Ventilation unit foundation

 Misc foundation - CCTV , Light pole FSM pit , Solar panel.

 Attended all model reviews with client, PMC & Contractor

 Foundation location

 Scope of work preparation for Geotechnical investigation

 Preparation of Civil & Structural design basis

 Preparation of SOW for Fire proofing on structures

 Support for CCMS/As-built activities.

 Co-ordination with other disciplines and complete on Schedule on time with Client.
 Checking of drawings prepared by detailers in accordance with the design documents
and submitting the same for client approval.

IMC CONTRACT , Sultanate of Oman,

KGP Fire water system project (DD)

Involved on analysis, design and documentation of following structures as per PDO and Shell
DEP standard inline with BS-EN code.
 Fire water tank foundation, Piperack, Pipe support and
associate’s
CV_Balaji.Harikrishnan_Senior Civil engineer
BALAJI HARIKRISHNAN

 Jockey & diesel Pump Foundation

 Pump sunshade and access Platfrom

 Hydrants, Monitors, Valve pit, Road crossing protection slab


 Day tank sunshade and vessel design,
 Development of drawing as per Fire water tank as per Shell DEP standard.

 Preparation of Site grading and Fencing layout.


 Foundation location plan
 Co-ordination with other disciplines for all activities pertaining to the job.
 Checking of drawings prepared by detailers in accordance with the design documents
and submitting the same for client approval.

GREATER BIRBA CLUSTER PROJECT- EPCM , Sultanate of Oman,

AL-NOOR PRODUCTION STATION

Involved on analysis, design and documentation of following structures as per PDO and Shell
DEP standard inline with BS-EN code.

 Involved in the Preparation of Site grading and Fencing layout extension.

 Involved in the design of Pipe supports, Platforms, Sleepers in Manifold area

 Drain vessel Foundation, Flare and Dead man foundation, Review and approval of
Vendor Documents

 Involved in the design and analysis of Auxiliary Buildings, HVAC Foundation.

 Design of Sunshade, platform and Foundation for Instrument and nitrogen receiver.

 Fencing and Grading Drawings, Standard notes and drawing for project. Reviewing
Topographic survey report.

 Switchyard Transformer Foundation, Capacitor Bank Foundation and Site co-ordination


for
Construction activities.

 Involved in the design and analysis of Telecom Buildings.

 Co-Ordination with All Departments in-house (Viz: Design, Quality / Production Etc) for
Timely and Logical Outputs to Optimize Project Completion.

 Co-ordination with other disciplines for all activities pertaining to the job.
Resolving Site query, Review and Approving Method of Statement.

 Involved in existing HP separator integrity and retrofitting work, Involved in development


of Passive fire proofing scope of work

 Involved in Analysis and Design of HP - Knock Out (KOD) vessel foundation,

 Analysis and design of 32” flare header line pipe Trestle and access platform design

 72m meter height flare foundation with Dead man foundation and IR scanner foundation
package.

 Preparation of SOW Topo survey & Geotechnical report

 Preparation of SOW for Slit trench report,

CV_Balaji.Harikrishnan_Senior Civil engineer


BALAJI HARIKRISHNAN
 Involved in Building Doors MR preparation, TQ, TBE actives and review and approval of
Vendor Drawings.

 Client/Vendor Interaction.

 Site construction and Procurement support.

 Support for CCMS/As-built activities.


 Checking of drawings prepared by detailers in accordance with the design documents
and submitting the same for client approval.

BIRBA PRODCUTION STATION

Involved on analysis, design and Documentation of following structures as per PDO and Shell
DEP standard inline with BS-EN code.

 Compressor sunshade & Sunshade foundations with 20 Mt capacity. (33m length x 24m
wide x 22m ht)

 Control room building (33m length x 16.5m wide x 7.8m height)

 Auxiliary buildings (69m length x 25m wide x 8.5m height)

 Launcher and receiver foundation

 Compressor Platform

 Piperack and pipe support

 Dampener Foundation,

 Substation building (50.5m length x 14.5m wide x 9.45m height)

 Analysis and design of pipe support package, Pipe bridge and Goal post, Trestle
foundation.

 HVAC foundation, Transformer and Bus duct foundation etc.,


 Checking of drawings prepared by detailers in accordance with the design documents
and submitting the same for client approval.

STANDARD HOOK-UP SKID WELL HEAD PROJECT


 Reviewing Vendor Drawing and Design Document for Well head skid.

 Involved in the design and analysis of Skid Foundation, Flange pit and pipe supports

 Co-ordination with other disciplines and L&T for all activities pertaining to the job.

HARWEEL PRODCUTION STATION


 Involved in the design and analysis of Trestle and RV Platform in HMPS area

 Co-ordinate with RHIP project for construction interface feasibility for Foundation.

GHAFEER A2C DEVELOPMENT PROJECT

Involved on analysis, design and Documentation of following structures as per PDO and Shell
DEP standard inline with BS-EN code.

 Pipe support foundation, Launcher receiver Foundation,

CV_Balaji.Harikrishnan_Senior Civil engineer


BALAJI HARIKRISHNAN
 interface with existing Project Design of RV platform and Foundation,

 Design of Flange pit foundation,

 Drain vessel foundation, vent supporting structure.

 Involved in preparing Scope of Work and Design basis for project.

 Preparation of Fencing and Grading for RGMS station.

RHIP (RABAB HARWEEL INTEGRATED PROJECT, Sultanate of Oman)

 Involved in the design of Pipe supports, Platforms, Sleepers in On-plot

 Co-ordination with other disciplines for all activities pertaining to RGMS & RIMS.

 Involved in the design Injection and Production Well head Foundation and Pipe supports

 Co-ordination with other disciplines for all activities pertaining to the job.

BP OMAN BLOCK 61 ,SULTANATE OF OMAN

Khazzan Brownfield Portfolio EPC Services,


Involved on analysis, design and Documentation of following structures as per BP standard in line
with BS-EN code.
 Involved in the On plot and Off plot services, Field maintenance, modifications,
turnarounds Preparation of Job estimate based on scope of work,
 EPC scheduling and work pack Input preparation
 Attending review meeting with client, site visit, Review and approval of As-built drawing.
 Involve in design of water Tank structure, Pipe support, Camp layout, Platform, etc., as
per BP standard.
 Co-ordination with other disciplines for all activities pertaining to the job.
 Focus on Engineering Costs as TIC.,

ADNOC - MERMMAXIMIZING ETHANE RECOVERY AND MONETIZATION, Abu-dhbai


 Involved on analysis, design and Documentation of feed Piperack structures with 3 tire
for 84” line +80” line as per ADNOC standard in line with American code.
 STG shelter – Preparation of design documents in accordance with American standards
for client approval.
 Checking of drawings prepared by detailers in accordance with the design documents
and submitting the same for ADNOC approval.
 Checking of drawings prepared by detailers in accordance with the design documents
and submitting the same for ADNOC approval

OLNG -POWER PLANT, Oman,


 Support for As-built activities.
 Co-ordination with other disciplines for all activities pertaining to the job.

CV_Balaji.Harikrishnan_Senior Civil engineer


BALAJI HARIKRISHNAN
2014 - 2015 Senior Structural Engineer, FICHTNER Consulting Engineers / Technip, Chennai, India
YAMGAZ- YAMAL LNG
Preparation of STAAD model, calculation of dead load, pipe load & wind load for input to
STAAD analysis & interpretation of output. Preparation & checking of general
arrangement drawings & Structural Steel detailing based on the below designs.
 IN-Place Analysis
 Land Transportation Analysis
 Lifting Analysis
Feasibility study done and design are carried out using Russian Code and American code
as per company standard.

2011 - 2013 Senior Structural Engineer, DODSAL Engineering, Abu dhabi,

GASCO, (MAQTA MAINFOLD, EPC, Abu Dhabi.)


 52” Scrapper Launcher & Receiver Foundation,
 52” Anchor Block, Impact wall,
 Pipe sleepers and Supports ,
 52” & 48” pipeline Pipe Trench using STAAD Pro and their foundation using MAT
3D as per British Codes and Company standards. Checking of drawing as per
International standards and design requirements. Design Coordination between
Piping, mechanical & pipeline discipline.

GASCO, (TAWEELAH MAINFOLD, Abu Dhabi)


 Blast resilient Control Room Building,
 42” Scrapper Receiver Foundation,
 Gas Filter Foundation,
 Passive cool shelter and Solar panel Foundation,
 48” Anchor Block, Pipe sleepers and Supports, using STAAD Pro and their
foundation using MAT 3D as per British Codes and Company standards.

GASCO, (Valve station, Abu Dhabi)


 Pipe sleepers and Supports,
 Vent Guide structures using STAAD Pro and their foundation using MAT 3D as
per British Codes and Company standards.
 Checking of drawing as per International standards and design requirements.
Checking of Grading Drawing and Fencing and paving Layout.

Eithad Rail- Parson`s AECOM (Mirfa, Abu Dhabi)


 Analysis, Design and Document the structures as per requirements of the project
including checking drawing and validation of Bill of materials.
 Administration Building.
 LV substation Building

CV_Balaji.Harikrishnan_Senior Civil engineer


BALAJI HARIKRISHNAN
2008 - 2011 Structural Engineer, SPADE Consultants, Bangalore.
GMR Infrastructure LTD (EMCO Energy LTD- 2 X 300 MW TPP, Warora)
Analysis and design of RCC & Steel Structure Preparation of Design Calculation and
drawing for following structures and getting approval from client.
 Wagon tripper
 Stacker Reclaimer Foundation,
 Trestle for Gravity Take off,
 Junction Tower,
 Crusher House foundation

Project – AMARAVATHI Thermal Power Project (5 x 270 MW TPP)


Analysis and design of RCC Structure,
 Transfer House,
 Emergency Reclaimer Hopper,
 Conveyor Tunnel,
 Pent House.

Project – NTPC, Simhadri Super Thermal Power Project Stage-II (2 x 500MW)


Preparation of STAAD model, calculation of dead load & wind load for input to STAAD
analysis & interpretation of output. Preparation & checking of general arrangement
drawings
 Service Building,
 Time office,
 Water treatment Control Room Building,
 Gate complex.

Project – NTPC, BHUSAWAL T.P.S Expansion Project (2 x 500MW)

Analysis and design of RCC Structure & Steel structure Preparation of drawing for Pipe
Rack, Fire station Building.

Project – JINDAL Thermal Power plant (2x600 MW Thermal Project At Derang, Orissa)
Analysis and design of RCC Structure Preparation of drawing for Bunker Foundation Unit-I
& II Using Finite element Plate model by Staad pro.

2007 - 2008 Structural Engineer, SGT India Pvt ltd, Chennai.


Analysis and design of Commercial and residential building including Documentations and
check the structural integrity of Structural systems.

Achievements:-
SGT India PVt ltd., - Best employee of Month
CV_Balaji.Harikrishnan_Senior Civil engineer
BALAJI HARIKRISHNAN

2006 - 2007 Asst.Engineer, COINDIA, Coimbatore.


Design, Site Co-Ordination including Documentations, Quantity Estimation, Planning,
Billing and check the structural integrity of Structural systems.

Education

2002 - 2006 B.E Civil Engineering, Kumaraguru college of Technology, Coimbatore

Specialist skills/Technical Courses

 Staad pro V8i and Connect Edition


 E-Tabs
 Mat-3d and Foundation 3d
 Ram connection
 Auto cad and MicroStation
 Navis work

 PDO – Operation and Engineering Course Certification (valid Till Dec 2023)
 BP- BP Safe induction course attended
 H2S Escape hood course to handle toxic situations in Oil & gas on-shore installations.
 GCC Driving license (Valid till 2026-Muscat).

CV_Balaji.Harikrishnan_Senior Civil engineer

You might also like