3 Deduction
Door 2 0.9 1.9 1.539
0.45
Ventilation 2 0.6 0.6 0.324
0.45
1.863 cum
Actual Stone masonary Wall 12.159 cum
4 Local Wooden Work
Chaukhat Long 4 0.075 0.075 1.9 0.04275
Chaukhat Shork 4 0.9 0.075 0.075 0.02025
Ventilation Chauthat 8 0.4 0.075 0.075 0.018
Purlin 5 3 0.075 0.075 0.08438
Rafter 4 3 0.08 0.08 0.0768
Total QTY= 0.24218 cum
5 GCI Sheet 17 sqm
Stone solling Work 2 1.5 1.35 0.12 0.486
PCC Work 2 1.5 1.35 0.075 0.30375
Pan set 1 1 Nos Ls
Tab 2 2 Nos
Pipe 16 mm dia hdpe 1 10 10 RM
90mm Dia pipe 3 RM
6 Septi tank
E/W In Excavation 1 1.5 1.5 2.5 5.625 cum
7 Slab PCC Work 1:2:4 1 1.6 1.6 0.075 0.192 cum
8 Rebar 13.3 kg
Plastering Work 1:4 C/S
Inner Sitr 2 2.1 2.25 9.45
2 1.1 2.25 4.95
Outer Site 2 4 2.25 18
2 3.1 2.25 13.95
Total QTY= 46.35 sqm
Septi Tank Solling Work
in Ploingth Area 1 1.5 1.5 0.12 0.27 cum
S.N. Particulars of items Quantity Unit Rate (Rs.) Per Amount (Rs) Remarks
1 B.M.S. cutting 12894.57 Cum 64.63 Cum 833376.059
2 Ordinary Soil Cutting 28866.46 Cum 51.7 Cum 1492395.98
3 O.R./M.R. 7865.085 Cum 172.35 Cum 1355547.4
4 H/R Cutting 156.825 Cum 870.1 Cum 136453.433
5 Site clearance 25000 sqm 21.6 sqm 540000
6 Dry Wall 978.95 Cum 4400.79 Cum 4308153.37
7 Stone Solling 122 Cum 3352.68 Cum 409026.96
9074953.2
Contengiencies charge
5% Rs. 400000
p ; c hfFr ug]{ gfk hfFr ug]{ lx;fj hfFr ug]{ :jLs[t ug]{
gfd gfd gfd gfd
bhf{ bhf{ bhf{ bhf{