Goverment of Nepal

Rawa Besi Rural Municipality Office


Kubindae, Haramtar, Khotang
1 No. province Nepal
Detail of Mesurment and Valuation Sheet
Fiscal year : 2077/78
Date: 2077/08/28
Name of project : Gaughar Clinic Toylet Nirman
Location : Rawa Besi- 3
mesurment
S.N. Particular item Quantity Unit Remarks
No L(m) B(m) H(m)
1 E/W In Excavation
Long Wall 2 3 0.7 0.5 2.1 cum
Short Wall 3 2.1 0.7 0.5 2.205 cum

2 Stone masonary Wall


Mud mortar
Long Wall 2 3 0.6 0.4 1.44 cum
Short Wall 3 2.1 0.6 0.4 1.512 cum

stone masonary Wall


Mud mortar Super
2.1 Structure
Long Wall 2 3 0.45 2 5.4 cum
Short Wall 3 2.1 0.45 2 5.67 cum

3 Deduction
Door 2 0.9 1.9 1.539
0.45
Ventilation 2 0.6 0.6 0.324
0.45
1.863 cum
Actual Stone masonary Wall 12.159 cum
4 Local Wooden Work
Chaukhat Long 4 0.075 0.075 1.9 0.04275
Chaukhat Shork 4 0.9 0.075 0.075 0.02025
Ventilation Chauthat 8 0.4 0.075 0.075 0.018
Purlin 5 3 0.075 0.075 0.08438
Rafter 4 3 0.08 0.08 0.0768
Total QTY= 0.24218 cum
5 GCI Sheet 17 sqm
Stone solling Work 2 1.5 1.35 0.12 0.486
PCC Work 2 1.5 1.35 0.075 0.30375
Pan set 1 1 Nos Ls
Tab 2 2 Nos
Pipe 16 mm dia hdpe 1 10 10 RM
90mm Dia pipe 3 RM

6 Septi tank
E/W In Excavation 1 1.5 1.5 2.5 5.625 cum
7 Slab PCC Work 1:2:4 1 1.6 1.6 0.075 0.192 cum
8 Rebar 13.3 kg
Plastering Work 1:4 C/S
Inner Sitr 2 2.1 2.25 9.45
2 1.1 2.25 4.95
Outer Site 2 4 2.25 18
2 3.1 2.25 13.95
Total QTY= 46.35 sqm
Septi Tank Solling Work
in Ploingth Area 1 1.5 1.5 0.12 0.27 cum

Prepared by Checked by Approve by


Goverment of Nepal
Rawa Besi Rural Municipality Office
Kubindae, Haramtar, Khotang
1 No. province Nepal
Abstract cost Of Quantities

Fiscal year : 2077/78


Date: 2077/08/28
Name of project : Gaughar Clinic Toylet Nirman
Location : Rawa Besi- 3

S.N. Particular item Quantity Unit Rate(Rs) Amount(Rs) Remarks

1 E/W In Excavation 9.93 cum 368.23 3656.52


Stone masonary Wall
2 12.159 cum 4850.07 58972.00
Mud mortar
3 Local Wooden Work 0.242175 cum 45791.11 11089.46
4 GCI Sheet 8.5 sqm 1014.46 8622.91
5 Stone solling Work 0.756 cum 3316.5 2507.27
6 PCC Work 0.49575 cum 15232.98 7551.75
7 Pan set 1 nos 1200 1200.00
8 Tab 2 nos 120 240.00
9 Pipe 16 mm dia hdpe 10 Rm 37.6 376.00
10 90mm Dia pipe 3 Rm 178.4 535.20
12 Rebar 0.0133 Mt 95514.1 1270.34

13 Plastering Work 1:4 C/S 46.35 Sqm 398.34 18463.06

Total BudgetRS= 100000 Total 114484.52

User@≥10% Rs. 14484.52


Rawa. Besi R.M. Rs. 95000.00
contingencies
charge@3.5% Rs. 3500.00
Maintenance fund 1.5% RS. 1500.00
Total Rs. 114484.52

Prepare by Checked by Approve by


Government of Nepal
Rawa Besi Rural Municipality Office
Kubhinde Haramtar Khotang
1 No. Province, Nepal
Detail Estimate & Abestract of cost
Name of Project : Bhupal Chok Dubekhola Tallogau Sadak Marmat Fiscal Year:- 2076/77
Location:- Rawa Besi-5 Dubekol Page No B Date:-2076/08/012
CH Mean dis. C/A Mean Qty of Classificat of Soil
(sqm) C/A(sqm) cutting(Cum) B.M.S.+OS(%) Qty(Cum) O.R/M.R.( Qty(Cum) H.R.% Qty(Cum) Remarks
0+000 20 2.7 1.35 27 100 27 0 0 0 0
0+020 20 0.54 1.62 32.4 100 32.4 0 0 0 0
0+040 20 0.72 0.63 12.6 100 12.6 0 0 0 0
0+060 20 1.98 1.35 27 100 27 0 0 0 0
0+080 20 1.35 1.665 33.3 100 33.3 0 0 0 0
0+100 20 2.25 1.8 36 100 36 0 0 0 0
0+120 20 1.8 2.025 40.5 100 40.5 0 0 0 0
0+140 20 3.15 2.475 49.5 100 49.5 0 0 0 0
0+160 20 2.88 3.015 60.3 100 60.3 0 0 0 0
0+180 20 0.72 1.8 36 100 36 0 0 0 0
0+200 20 1.08 0.9 18 100 18 0 0 0 0
0+220 20 1.98 1.53 30.6 100 30.6 0 0 0 0
0+240 20 1.44 1.71 34.2 100 34.2 0 0 0 0
0+260 20 0.81 1.125 22.5 100 22.5 0 0 0 0
0+280 20 1.17 0.99 19.8 100 19.8 0 0 0 0
0+300 20 1.35 1.26 25.2 100 25.2 0 0 0 0
0+320 20 0.81 1.08 21.6 100 21.6 0 0 0 0
0+340 20 0.54 0.675 13.5 100 13.5 0 0 0 0
0+360 20 1.35 0.945 18.9 100 18.9 0 0 0 0
0+380 20 0.72 1.035 20.7 100 20.7 0 0 0 0
0+400 20 1.44 1.08 21.6 100 21.6 0 0 0 0
0+420 20 2.5 1.97 39.4 100 39.4 0 0 0 0
0+440 20 1.65 2.075 41.5 100 41.5 0 0 0 0
0+460 20 0.9 1.275 25.5 100 25.5 0 0 0 0
0+480 20 1.5 1.2 24 100 24 0 0 0 0
0+500 20 0.54 1.02 20.4 100 20.4 0 0 0 0
0+520 20 1.8 1.17 23.4 100 23.4 0 0 0 0
0+540 20 3.3 2.55 51 100 51 0 0 0 0
0+560 20 1.35 2.325 46.5 100 46.5 0 0 0 0
0+580 20 2.25 1.8 36 100 36 0 0 0 0
0+600 20 0.405 1.3275 26.55 100 26.55 0 0 0 0
0+620 20 1.32 0.8625 17.25 100 17.25 0 0 0 0
0+640 20 5.375 3.3475 66.95 100 66.95 0 0 0 0
0+660 20 3.9 4.6375 92.75 100 92.75 0 0 0 0
0+680 20 1.8 2.85 57 100 57 0 0 0 0
0+700 20 3.75 2.775 55.5 100 55.5 0 0 0 0
0+720 20 1.65 2.7 54 100 54 0 0 0 0
0+740 20 4.4 3.025 60.5 100 60.5 0 0 0 0
0+760 20 4.4 4.4 88 100 88 0 0 0 0
0+780 20 4.4 4.4 88 100 88 0 0 0 0
0+800 20 1.65 3.025 60.5 100 60.5 0 0 0 0
0+820 20 2.42 2.035 40.7 100 40.7 0 0 0 0
0+840 20 1.65 2.035 40.7 100 40.7 0 0 0 0
0+860 20 2.75 2.2 44 100 44 0 0 0 0
0+880 20 3.3 3.025 60.5 100 60.5 0 0 0 0
0+900 20 2.2 2.75 55 100 55 0 0 0 0
0+920 20 3.85 3.025 60.5 100 60.5 0 0 0 0
Item L B H
1 Drainage Work with Excavator 240 1.5 0.7 252
A E/W InUsers Parts >10%
Excavation With Man
1 Drain 200 0.9 0.7 126

Total OS+B.M.S Soil Cutting work= 2129.3


Prepare By Checked by Approve by
Government of Nepal
Rawa Besi Rural Municipality Office
Kubhinde Haramtar Khotang
1 No. Province, Nepal
Abstract of Estimated Cost
Fiscal Year:- 2075/75
Date:-2075/08/21
Name of Project:- Nunthala Jaubari nigale Sadak Nirman
Location:- Rawa besi-1 Kubhinde

S.N. Particulars of items Quantity Unit Rate (Rs.) Per Amount (Rs) Remarks
1 B.M.S. cutting 12894.57 Cum 64.63 Cum 833376.059
2 Ordinary Soil Cutting 28866.46 Cum 51.7 Cum 1492395.98
3 O.R./M.R. 7865.085 Cum 172.35 Cum 1355547.4
4 H/R Cutting 156.825 Cum 870.1 Cum 136453.433
5 Site clearance 25000 sqm 21.6 sqm 540000
6 Dry Wall 978.95 Cum 4400.79 Cum 4308153.37
7 Stone Solling 122 Cum 3352.68 Cum 409026.96
9074953.2

User@≥10% Rs. 1074953.2


Maintances Fund @1.5% Rs. 120000

Contengiencies charge
5% Rs. 400000

Prepare by Checked by Approve by


Goverment of Nepal
Rawa Besi Rural Municipality Office
Kubindae, Haramtar, Khotang
1 No. province Nepal
Detail of Mesurment and calculation Of Quantities
Fiscal year : 2075/76
Date: 2075/08/21
Name of project : Nunthala Jaubari nigale Sadak Nirman
Location : Rawa Besi-1 kubhinde
mesurment
S.N. Particular item Quantity Unit Remarks
No L(m) B(m) H(m)
1 Site clearance 1 5000 5 25000 sqm
2 stone solling
1 60 3.5 0.2 42 Cum
1 100 3 0.2 60 Cum
1 15 4 0.2 12 Cum
1 6 4 0.2 4.8 Cum
1 4 4 0.2 3.2 Cum
Total Qty= 122
3 Dry Wall
1 12 1.5 1.5 27 Cum
1 9 1.5 1.5 20.25 Cum
1 15 1.5 1.5 33.75 Cum
1 8 2 1 16 Cum
1 14 2 1.5 42 Cum
1 9 4 2 72 Cum
1 15 5 1 75 Cum
1 10 4.5 0.5 22.5 Cum
1 12 3 0.5 18 Cum
1 10 4 0.5 20 Cum
1 13 3 1 39 Cum
1 10 3 2.5 75 Cum
1 15 3 1.5 67.5 Cum
1 11 2 0.5 11 Cum
1 12 1.5 2 36 Cum
1 9 1.5 1.5 20.25 Cum
1 14 1.5 1.7 35.7 Cum
1 7 1 2 14 Cum
1 12 4 1.5 72 Cum
1 14 2 2 56 Cum
1 14 4 2 112 Cum
1 15.5 2 2 62 Cum
1 16 4 0.5 32 Cum
Total Qty= 978.95 Cum

Prepared by Checked by Approve by


/fjf j];L ufpkflnsf `
ufpF sfo{kflnsfsf] sfof{no
x/d6f/ s'le08]]]]] , vf]6fª
FINAL BILL
ljnsf] qmd ;+Vof M– cg';'rL ^(
Name of Project : Judi mahadeb Easthan Bebasthapan e'QmfgL ef}r/ g+= M–
pkef]Qmf ;ldltsf] gfd M– gfkL lstfj g+= sf] k[i7 g+=
;Demf}tf ;+Vof M– cfO6dafOh sfo{ clen]v vftfsf] k[i7 g+=
cl3Nnf] e'QmfgL ljnsf] qm=;= ;Demf}tf ;DaGwL n
cl3Nnf] e'QmfgL ljnsf] ef}=g+= M– pkef]Qmf ;ldltsf] vf
sfd z'? ug{ cfb]z lbPsf] ldlt M– sfd ;DkGg x'g] ldlt
k[i7df sfdsf] ljj/0f PsfO{ n=O{= kl/df0f xfnsf] sfd फरक s}lkmot
kl/df0f b/ hDdf kl/df0f b/ hDdf kl/df0f b/ hDdf
1
E/W In Excavation cum 9.93 368.23 d"No3656.52 9.93 368.23 d"No 3656.5239 0.00 368.23 d"No 0
2
Stone masonary Wall Mud 12.16 4850.07 58972.0011 0.00 4850.07 0
mortar cum 12.159 4850.07 58972.00
3 0.242175 45791.11 11089.46 0.24 45791.11 11089.4621 0.00 45791.11 0
Local Wooden Work cum
4 8.5 1014.46 8.50 1014.46 8622.91 0.00 1014.46 0
GCI Sheet sqm 8622.91
5 0.756 3316.5 0.76 3316.5 2507.274 0.00 3316.5 0
Stone solling Work cum 2507.27
6 0.49575 15232.98 0.50 15232.98 7551.74984 0.00 15232.98 0
PCC Work cum 7551.75
7 1 1200 1.00 1200 1200 0.00 1200 0
Pan set nos 1200.00
8 2 120 2.00 120 240 0.00 120 0
Tab nos 240.00
9 10 37.6 10.00 37.6 376 0.00 37.6 0
Pipe 16 mm dia hdpe Rm 376.00
10 3 178.4 3.00 178.4 535.2 0.00 178.4 0
90mm Dia pipe Rm 535.20
11 0.0133 95514.1 0.01 95514.1 1270.33753 0.00 95514.1 0
Rebar Mt 1270.34
12 46.35 398.34 46.35 398.34 18463.059 0.00 398.34 0
Plastering Work 1:4 C/S Sqm 18463.06
Total 114484.52 114484.517 0.00
Total Rupees
of] ljn adf]lhd hDdf ? 114484.52
cl3Nnf] ljnjf6 e"QmfgL ePsf] ?= 0
user 19484.52
Total Budget RS:- 100000.00
Contigencies Charge 3.5% 3500.00
Maintaince fund@1.5% 1500
af+sL lbg" kg]{ ?= 95000.00