LIST MATERIAL

INSTANSI/SATKER : DINAS PEKERJAAN UMUM KAB. RAJA AMPAT


PEKERJAAN : PEMBANGUNAN GEREJA DI KAMPUNG KAPADIRI
LOKASI : KAMPUNG KAPADIRI, DISTRIK SUPNIN KABUPATEN RAJA AMPAT
TAHUN ANGGARAN : 2023
NO. & TGL KONTRAK : ……………………………………
NILAI KONTRAK : ……………………………………
NILAI PELAKSANAAN : ……………………………………
KONTRAKTOR PELAKSANA : CV / PT….
KONSULTAN PENGAWAS : CV / PT….

NO. URAIAN PEKERJAAN VOLUME

1 Semen 6.116,40 / 40 = 152,91 zak


2 semen warna / putih 955,69 / 240 = 3,98 zak
3 Pasir pasang 28,67 / 1 = 28,67 m3
4 granit 60x60cm 637,13 / 1,44 = 442,45 dos dibulatkan 465
5 Plamur 115,31 = 115,00 kg
6 cat interior/eksterior 415,13 / 20 = 20,76 pile
7 Cat meni 22,27 = 22,00 kg
8 cat kayu 47,87 = 50,00 kg
9 pengencer/ thinner 3,34 = 5,00 kg
10 Amplas 22,27 = 25,00 lbr
11 papan kayu 2,44 = 3,00 m2
12 Lem kayu 16,96 = 20,00 kg
13 kunci tanam biasa 10,00 = 10,00 psg
14 engsel pintu 4'' 42,00 = 42,00 psg
15 engsel pintu 3'' 72,00 = 72,00 psg
16 Grendel pintu 30,00 = 30,00 bh
17 Grendel jendela 72,00 = 72,00 bh
18 Kait angin 144,00 = 144,00 bh
19 Stop Kontak Inbow 16,00 = 16,00 bh
20 Saklar Ganda Inbow 8,00 = 8,00 bh
21 kabel nym 3x2,5mm 100,00 = 100,00 m
22 kabel nym 2x1,5mm 100,00 = 100,00 m
23 MCB 6,00 = 6,00 bh
24 box panel 1,00 = 1,00 bh
25 lampu LED 18 watt 8,00 = 8,00 bh
26 Lampu TL 40 Watt 28,00 = 28,00 bh
27 Steinlees steel 33,50 = 33,50 m'