Cost X-Fast Report Document
Cost X-Fast Report Document
1 Sub Structure
EXCAVATION
EARTHWORK SUPPORT
To Collection 765,210
FORMWORK
Piling Works
To Collection 3,759,100
COLLECTION
Page 1: 765,210
Page 2: 3,759,100
Sub Structure
Carried to Summary: 4,524,310
2 Architectural
G - MASONRY WORK
External Walls
Internal Walls
H - WATERPROOFING
Horizontal area
To Collection 44,530
2 Architectural (Continued)
Internal floor
External wall
Internal wall
Internal ceiling
2 Architectural (Continued)
SKIRTING FINISHES
Internal
Architectural 1,109
To Collection 66,720
2 Architectural (Continued)
COLLECTION
Page 4: 44,530
Page 5: 463,612
Page 6: 66,720
Architectural
Carried to Summary: 574,862
3 MEP
Plumbing
Electricity
POINT WIRING
To Collection 25,660
3 MEP (Continued)
Ground floor
Ground floor
ACMV
MEP 729
To Collection 583,553
3 MEP (Continued)
COLLECTION
Page 8: 25,660
Page 9: 583,553
MEP
Carried to Summary: 609,213