PT BUMI PRATAMA KHATULISTIW

Division : 2
DAILY REPORT FOR MANURING AND EFB/ DECANT

(FC:Bambang.S) Block No of Output per Today Todate Completed


No Activities No Ha Workers manday Ha Ha %

01/09/2023 KAPTAN 142 122.25 9 2.24 20.16 93.9 76.80%


02/09/2023 KAPTAN 142 122.25 11 2.21 24.38 118.28 96.75%
04/09/2023 KAPTAN 147 71.55 10 2.32 23.23 23.23 32.46%
05/09/2023 KAPTAN 142 122.25 2 1.98 3.97 122.25 100.00%
KAPTAN 147 71.55 7 2.08 14.62 37.85 52.90%
06/09/2023 KAPTAN 147 71.55 10 2.16 21.62 59.47 83.11%
07/09/2023 KAPTAN 147 71.55 5 2.41 12.08 71.55 100.0%
KAPTAN 048 25.47 4 2.44 9.76 9.76 38.31%
08/09/2023 KAPTAN 048 25.47 8 1.96 15.71 25.47 100.00%
KAPTAN 143 86.04 2 2.77 5.54 5.54 6.43%
09/09/2023 KAPTAN 143 86.04 9 2.64 23.8 29.34 34.10%
KAPTAN 130 93.23 2 2.77 5.55 5.55 5.95%
11/09/2023 KAPTAN 143 86.04 11 2.20 24.25 53.59 62.28%
12/09/2023 KAPTAN 143 86.04 11 2.67 29.47 83.06 96.53%
13/09/2023 KAPTAN 143 86.04 2 1.5 3.02 86.04 100%
KAPTAN 139 59.73 9 2.85 25.67 25.67 42.97%
14/09/2023 KAPTAN 139 59.73 11 2.72 29.95 55.62 93.11%
15/09/2023 KAPTAN 139 59.73 2 2.05 4.11 59.73 100.00%
KAPTAN 140 99.18 8 2.65 21.21 21.21 21.38%
16/09/2023 KAPTAN 140 99.18 10 2.22 22.26 43.47 43.82%
Mill Waste Utilisation (M
Block No of Output per Today Todate Completed
No Ha Workers manday Ha Ha %
2 EFB Mulching

3 Decanter Cake

4 Bunch Ash

Prepared by Report by

Field Officer Manager


MA KHATULISTIWA
From : 01 September 2023
G AND EFB/ DECANTER CAKE APPLICATION
Fertiliser (Mt)
NPK/NK Kies/Dol MOP RP Dosage
Tdy Tdte Tdy Tdte Tdy Tdte Tdy Tdte Kg/palm

SOA/Urea Borate Kaptan Others Dosage


Tdy Tdte Tdy Tdte Tdy Tdte Tdy Tdte Kg/palm
12.4 57.7 5
15.6 73.3 5
15.3 15.3 5
2.45 75.75 5
9.8 25.1 5
14.2 39.3 5
7.75 47.05 5
6.3 6.3 5
10.25 16.55 5
3.55 3.55 5
15.4 18.95 5
3.5 3.5 5
15.45 34.4 5
18.95 53.35 5
1.95 55.3 5
17 17 5
19 36 5
2.35 38.35 5
13.4 13.4 5
14.05 27.45 5
Mill Waste Utilisation (Mt)
EFB Decanter Bunch Ash Others Rate
Tdy Tdte Tdy Tdte Tdy Tdte Tdy Tdte mt/ha
To : 16 September 2023
PT BUMI PRATAMA KHATULISTIWA
Division : 2 Block No : 130 Date :

Block Hectarge: 93.23


Harv Interval : 10 Today Todate % Completed
5 79.92 85.72 %
DAILY REPORT FOR HARVESTER GANG PRODUCTIVITY
Gang/Mandor : Apiau FC : M.Zainuri
Target Output per Avg Bunch Output/manday Unripe Underripe Overripe Loosefruit
No Name
Bch/day Bch/ day Wt Kg MT Ha Bunches Bunches Bunches Kg
1 Paustinus 104 77 9.636 742 1
2 Hendra 104 87 9.636 838 1
3 Rohmad 104 50 9.636 482 1
4 Marluwi 104 122 9.636 1,176 2
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0

336 3,238 5 0 0

Prepared by Checked by Approved by


Field Conductor Field Officer Manager

PT BUMI PRATAMA KHATULISTIWA


Division : 2 Block No : 128 Date :

Block Hectarge: 90.03


Harv Interval : 15 Today Todate % Completed
6.25 75.36 83.71 %
DAILY REPORT FOR HARVESTER GANG PRODUCTIVITY
Gang/Mandor : Akiang FC : M.Zainuri
Target Output per Avg Bunch Output/manday Unripe Underripe Overripe Loosefruit
No Name
Bch/day Bch/ day Wt Kg MT Ha Bunches Bunches Bunches Kg
1 Marselus 119 116 8.472 983 1.42
2 Bolang 119 113 8.472 957 1.42
3 Akhun 119 70 8.472 593 0.85
4 Marwan 119 194 8.472 1,644 2.56
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
493 4,177 6.25 0 0

Prepared by Checked by Approved by

Field Conductor Field Officer Manager

PT BUMI PRATAMA KHATULISTIWA


Division : 2 Block No : 132 Date :

Block Hectarge: 88.16


Harv Interval : 10 Today Todate % Completed
1.14 51.77 58.72 %
DAILY REPORT FOR HARVESTER GANG PRODUCTIVITY
Gang/Mandor : T.Rusli FC : Pandri
Target Output per Avg Bunch Output/manday Unripe Underripe Overripe Loosefruit
No Name
Bch/day Bch/ day Wt Kg MT Ha Bunches Bunches Bunches Kg
1 Acui 117 60 8.538 512 1.14
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0

60 512 1.14 0 0

Prepared by Checked by Approved by

Field Conductor Field Officer Manager

PT BUMI PRATAMA KHATULISTIWA


Division : 2 Block No : 139 Date :

Block Hectarge: 59.73


Harv Interval : 12 Today Todate % Completed
5.41 32.43 54.29 %
DAILY REPORT FOR HARVESTER GANG PRODUCTIVITY
Gang/Mandor : Sani FC : Abror.M
Target Output per Avg Bunch Output/manday Unripe Underripe Overripe Loosefruit
No Name
Bch/day Bch/ day Wt Kg MT Ha Bunches Bunches Bunches Kg
1 Juheri 97 80 10.226 818 1.28
2 Ridhoi 97 56 10.226 573 1.14
3 Dedy.S 97 81 10.226 828 1.28
4 Yusup.E 97 120 10.226 1,227 1.71
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0

337 3,446 5.41 0 0

Prepared by Checked by Approved by

Field Conductor Field Officer Manager

PT BUMI PRATAMA KHATULISTIWA


Division : 2 Block No : 144 Date :

Block Hectarge: 122.44


Harv Interval : 13 Today Todate % Completed
19.09 77.18 63.03 %
DAILY REPORT FOR HARVESTER GANG PRODUCTIVITY
Gang/Mandor : Nasrul/Sabinus FC : Angga.S
Target Output per Avg Bunch Output/manday Unripe Underripe Overripe Loosefruit
No Name
Bch/day Bch/ day Wt Kg MT Ha Bunches Bunches Bunches Kg
1 Santo 126 71 7.89 560 0.85
2 Sugiarto 126 91 7.89 718 0.85
3 Suparman 126 63 7.89 497 0.85
4 Alpian 126 165 7.89 1,302 1.71
5 M.Suni 126 170 7.89 1,341 1.71
6 Marwan 126 160 7.89 1,262 1.71
7 Tohir 126 129 7.89 1,018 1.71
8 Istanto 126 128 7.89 1,010 1.71
9 M.Hori 126 133 7.89 1,049 1.71
10 Na'em 126 100 7.89 789 1.71
11 Hendra 126 180 7.89 1,420 2.00
12 Masrodi 126 294 7.89 2,320 2.57
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0

1684 13,287 19.09 0 0

Prepared by Checked by Approved by

Field Conductor Field Officer Manager


MI PRATAMA KHATULISTIWA
16 September 2023

FOR HARVESTER GANG PRODUCTIVITY

REMARKS

Pindah Block
Pindah Block
Pindah Block
Pindah Block
MI PRATAMA KHATULISTIWA
16 September 2023

FOR HARVESTER GANG PRODUCTIVITY

REMARKS

Pindah Block
Pindah Block
Pindah Block
Ngendel
MI PRATAMA KHATULISTIWA
16 September 2023

FOR HARVESTER GANG PRODUCTIVITY

REMARKS
MI PRATAMA KHATULISTIWA
16 September 2023

FOR HARVESTER GANG PRODUCTIVITY

REMARKS

Pindah Block
Pindah Block
Pindah Block
MI PRATAMA KHATULISTIWA
16 September 2023

FOR HARVESTER GANG PRODUCTIVITY

REMARKS
PT BUMI PRATAMA KHATULISTIWA
Division : 2
DAILY REPORT FOR MAINTENANCE WORK

Block No of Output per Today Todate Completed


No Activities No Ha Workers manday Ha Ha %
1 Pruning

2 Circle/Path Spray

3 Slashing

Block Target Today Todate Completed


No Meter meter meter %
4 Road Maintenance
Road grader
Compactor
Backhoe

Block Target Today Todate Completed


No No. of units Units Units %
5 Culvert and Bridges

6 Palm Mounding

Prepared by Report by

Field Officer Manager


HATULISTIWA
From : 01 September 2023 To : 16 September 2023
TENANCE WORK
Operating material (Lit or gm)
Supremo Met Sulf Basta Garlon
Tdy Tdte Tdy Tdte Tdy Tdte Tdy Tdte

Remarks
Remarks