Doganer M12125D

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PREVENTIVE MAINTENANCE SCHEDULE

OF DOGANER BUSBAR MACHINE-(M12125D)

MONTH: Page: 1 - 2
S/N WEEK 1 WEEK 2 WEEK 3 WEEK 4 WEEK 5
Operator Mode
O. SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU FRI

1 Checking oil level (Hydraulic unit) Daily

2 Checking control system display Daily


Cleaning machine (Remove any copper wastes off
3 Daily
the machine)
Checking proper function Safety switch and
4 Daily
potentiometer
Wiping and cleaning moving and metal parts with
5 Weekly
thin mechanic oil.
Checking connection parts of hydraulic units for
6 Monthly
any oil leakage's
7 Checking oil level (refill it if necessary) Quarterly
Checking piercing punch sets and lubricate axis Semi-
8
setting gears with grease oil Annually
To be filled up by person assigned Day (Week 1-5)

OPERATOR: MAINTENANCE STAFF:

GENERATED BY: APPROVED BY:

Ralph Lawrence L. Cortez Lalit Mishra

FOR-M-001-PR

You might also like