DMM 12 9 2023
DMM 12 9 2023
ESP FIELDS
Spark rate 1A6-6 , 765 Spark rate 2D6-7,
MAXIMUM SPARK
MA 740MA
RATE / CURRENT
U#1 U#2
Pass A1-
442 361
>331/450/450
Pass A2-
383 390
331/450/450
Pass B1-
390 383
331/450/450
Pass B2-
ADPH Shut off 397 375
331/450/450
Vacuum/ Line
Vacuum(mmHg) Pass C1-
427 397
331/450/450
Pass C2-
420 346
331/450/450
Pass D1-
427 353
331/450/450
Pass D2-
397 383
331/450/450
U#1 U#2
Carbon % 11-Sep Btm Ash <1.5 0.3 0.2
Fly Ash < 0.5 0.6 0.5
Hopper Temp.
BA 26/29/28/49 46/46/52/31
A/B/C/D
Stage-1
IAD -1 IAD -2
9-Sep-23 9-Sep-23
-34.2 -48.5
Chem (-)VE Value
IA Dew point
-60 -56.7
Online (-)VE Value
COC Turbidity
Stage-1 - -
11-Sep Stage-2 <3.0 2.78 29
11-Sep Stage-3- 5.0 4.83 66
Oil Chemistry
Moisture Limits U#1
25-Aug FRF-NAS 8 7
Units #1
BFP A 100/50 49
BFP B 100/50 63
8-Sep
BFP C 100/50 54
Limit
4-Sep-23 ID FAN#2A 100
ID FAN#2B 100
ID FAN#2C 100
Chemistry Parameters
SILICA (ppb)
150 10
(LAB)
Chloride-LAB
500 112
(ppb)
pH (O/L) 9.0-9.6 9.28
ACC(µs/cm) - 0.71
D.O -O/L(ppb)/
1-10 11.3/6.7
Lab(ppb)
8.8-9.2 (st-1) 9.2-9.6
Feed /11-Sept pH (O/L) 9.24
(st-2&3)
SILICA(ppb) 20 3
ACC(µs/cm) 0.2 0.098
D.O -O/L(ppb)/
20 30.61/18.8
Lab(ppb)
ACC(µs/cm) 0.2 0.081
Condensate/
11-Sept 8.8-9.2 (st-1) 9.2-9.6
pH (O/L) 9.26
(st-2&3)
SILICA(ppb) 20 5
SODIUM(ppb) 2 0.58
SODIUM(ppb) 2 0.56
SILICA(ppb) 20 5
Main steam
8.8-9.2 (st-1) 9.2-9.6
Main steam pH (O/L) 9.27
(st-2&3)
ACC(µs/cm) 0.2 0.062
CPU SERVICE 1B
Stage-1 Stage-2
Bunker Floor fire
water hydrant
1.0 4.0
pressure(Kg /Cm2 )
Total no. of
Zones:120
TP-20A/B to TP-25
9/11/2023
9/11/2023
EQMS
PH Temp TOC TSS
43 33 55 66
41 32 49 60
38 34 50 68
43 33 56 60
Spark rate
Spark rate 3A24-5, Spark Rate:5C14- Spark rate 6D11-
4A22-9, 246mA
167mA 8, 5C19-1656mA 8,6C17- 1994mA
4D24-9- 282mA
- - 1:6 1:10
8.4 1.0 1:4 1:5
7.96 1.0 1:4 1:8
Oil Chemistry
U#2 U#3 U#4 U#5 U#6
49 236/132/200 53 42 45
41 43 45 42 47
468 1169 312 956 1045
8 6 5 7 7
50 48 45 98 46
65 42 39 282/176 41
Working/Lube Working/Lube Working/Lube Working/
45 Lube
53/47 50/42 58/45 80/69
Moisture MI
297 43.7
349 49.7
396 45.6
Chemistry Parameters
8 13 16 12 38
4 6 5 4 6
0.06 0.11 0.082 0.092 0.106
4 5 6 3 5
0 0.35 0.22 0 0.38
0 0.33 0.21 0 0.34
3 5 5 3 4
9.26 9.22 9.25 9.35 9.27
Stage-2 Stage-3
4.0 4.0
TH-2 TH-3
11.0 12.0
-1.28 -6.3
-11.1 -8.4
11.09.2023 UNIT #6
Load 472
Coal Flow 264
11-Sep-23 + 50 -100
1A 0.5 93
1B 0.6 90
1C
1D 0.1 96
1E 0.4 94
1F 0.3 95
1G 0.5 92
1H
NIT #6
472
264
1960
13.0/0.0
15.4/21.0
13.0/0.0
16.2/28.0
-200
>70
-200
72
70
80
75
76
71
fjgUn lqij FkeZy ikoj LVs'ku fjgUn
esfUVusUl eSustesaV lfoZl ¼vuqj{k.k izcU/ku lsok½
izzpkyu ,oa vuqj{k.k dh izfrfnu lqcg dh la;kstu cSBd
Meeting duration: 00:30 hrs 12-Sep-23
Noti. No Noti. Dt. Description Deptt. Trgt Dt REV-1
UNIT#1
106368427 1-Jul BFP-1A LEAK OFF V/V SWYD SIDE PASSING TMD
PTW 9-Sep SOOTBLOWERS 5,8,39,42,85 BLANKED DUE TO POPPET VALVE BMD
13-Sep
UNIT#2
PTW 8-Sep Mill-2B under OH BMD 20-Sep
8-Sep Mill 2D corner-3 velocity variation +13.3 % BMD
PTW 5-Sep AWRS PUMP-5 HIGH VIBRATION MNDE H 84 MM/S AHD 15-Sep
PTW 5-Sep AWRS PUMP-2 HIGH VIBRATION MNDE H 42 MM/S AHD 10-Sep 12-Sep
106517374 7-Sep DIESEL FIRE HYDRANT P/P COOLING WATER LEAKAGE. OFS 12-Sep
PTW 9-Sep MRC-A OIL LKG FROM GEAR BOX TMD 11-Sep
11-Sep Stage-2 Service Building screw chiller-1 not taking start C&I
STAGE#2 Chemistry
31-Aug CPU stage 2 Effluent priming tank-T3S inspection OFS 20-Sep
UNIT#5
12-Sep MANY SH AND RH METAL TEMP POINTS GETTING BAD C&I
PTW 12-Sep INTERMITTENTLY
MILL-5H U/P FOR PM BMD
UNIT#6
5-Sep GOODS LIFT NOT AVAILABLE DUE TO PULLEY PROBLEM EMD 16-Sep
PTW 11-Sep MILL-6G/FEEDER-6G PM BMD 12-Sep
STAGE#3: COMMON
WASTE WATER P/Ps MODULE OFF FOR ETP CLARIFIER TURBO
4-Sep OFS 13-Sep
WORK
DRAIN SEPARATION PUMP-A TRIPPING ON OVERLOAD
4-Sep OFS 5-Sep 6-Sep
AFTER SOMETIME
PTW 12-Sep LP SEAL WATER PUMP A GLAND LEAKAGE AHD
PTW 12-Sep ASH SLURRY LINE C PIPE REPLACEMENT AHD 12-Sep
12-Sep ASH SLURRY LINE D SUCTION CHOKE AHD
STAGE#3 Chemistry
106413969 22-Jul CPU REGENERATION ARU CONSEP REPLACEMENT OFS 30-Aug 30-Sep
PTW 21-Aug ETP-3 turbo drive abnormal sound OFS 13-Sep
STATION: COMMON
PTW required
PTW required
PTW required
Material N/A
After Mill-D
Emergency Available
OH required
STAGE#3:CHP
CCTV camera T/H-3 NEW,T/H-1, WT HOPPER,34A/B H,33 A/B H,38 A/B H,39
9-Sep C&I
A/B TAIL not working.(Total 05 Nos) .
Camera cleaning reqd. T/H-3 BELOW MCC END ,38 H,39 T,46 T. (Cleaning
9-Sep C&I
reqd. )
S/R-3 Phone not working properly .(Malfunctioning) 9-Sep EM
S/R-3 Belt weigher not working . 11-Sep C&I
CHP-COMMON
PA System not working:
Stage-1: ALL OK.
11-Sep CHP-EMD
Stage-2: ALL OK .
Stage-3:02 (44 T,40A H)
Sump p/p not working:
Stage-1:NIL (POPULATION 06)
11-Sep
Stage-2:NIL(POPULATION-12)
Stage-3: NIL(POPULATION 12)
MGR
STAGE#2:CHP
Description Noti. Dt. Noti. No Deptt.
CHP CONTROL ROOM AC DUCT FAN MOTOR NOT WORKING 22-Apr CHP- EMD/MM
CCTV camera Conv33H,34H, WT Hopper, 39H & 40A Tail not working. 28-Sep C&I
12-Sep
11-Sep
11-Sep
5/18 balance
(long pending)
11-Sep
To be checked
Available
Tar. Dt Remarks
Trgt Dt Remarks
Spare N/A cash
purchase to be done
Long Pending
30-May Long Pending
July’22 Long Pending
Long Pending
Long
Trgt Dt Remarks
Long Pending
Long Pending
PO Placed
Long Pending
Spare N/A
Long Pending
Long Pending
Long Pending
Trgt Dt Remarks
UNIT#1
Equipment
COLTCS
LRSB 212
Mill-1C
UNIT#2
Equipment
LRSB 211
MILL 2A
STAGE#1 COMMON
Equipment
H2 Compressor-A
CWP/P-1B
UNIT#3
Equipment
LRSB-105
UNIT#4
Equipment
MS ERV-SV-10
STAGE#2: COMMON
Equipment
DMP-2
PA System
UNIT#5
Equipment
LRSB-105
LRSB-124
UNIT#6
Equipment
STAGE#3: COMMON
Equipment
PA System
TAC-6C
H2 plant Compressor-A
H2 plantCompressor-B
UNIT#1
Description Noti. Dt. Noti. No
COLTS B2 bottom not closing fully 1/20/2023
BLANKED 3/7/2023
MILL & FEEDER 1C UNDER R&M 7/16/2023
UNIT#2
STAGE#1 COMMON
Description Noti. Dt. Noti. No
H2 Compressor-A is out of order: Needs revival or
4/5/2023
replacement.
CWP/P-1B PUMP BRG ABNORMAL SOUND 5/25/2023
UNIT#3
Description Noti. Dt. Noti. No
Lance bend 9/17/2022
UNIT#4
Description Noti. Dt. Noti. No
Passing 11/16/2022
STAGE#2: COMMON
Description Noti. Dt. Noti. No
UNIT#5
Description Noti. Dt. Noti. No
Lance bend 4/29/2019
Lance bend 12/31/2018
UNIT#6
Description Noti. Dt. Noti. No
STAGE#3: COMMON
Description Noti. Dt. Noti. No
Not available
TAC-6C MOTOR Bearing damaged 3/29/2023
Compressor-A is out of order from more than 02 year. Its
4/5/2023
Unloader is not working.
TMD
OFS
EMD
TMD
TMD
S/D Jobs
UNIT#1
Sr.No. Description Deptt.
1 ESP FIELD 1D6 & 1D5 SHORT AHD
2 ID FAN 1B COUPLING OIL PRESSURE LOW BMD
3 COAL FEEDER 1E FEEDER 0/L GATE JAM BMD
4 Discharge line of Drain pot near 25m HAID lE is narrow BMD
and choke, overflowing water falling continuously over
cables
5 ID 1C FAN DE/NDE SIDE OIL LKG BMD
6 ID FAN1B GSWWATER LKG UNDERGROUND BMD
REMARKS
1 BCP 2B MOTOR ABNORMAL SOUND EMD/BMD
2 Boiler start up vent 5A stem bend, manually closed BMD
3 ESP-2C FLUE GAS O/L GATE JAM BMD
Long pending
S/D Jobs
UNIT#3
Sr.No. Description Deptt.
1 CTT-3B2 & 3C2 CHECKING AS WHENEVER IN SERVICE SLOW AHD
ASH EVACUTION
2 ALL CTT NOZZLES DEFECTIVE AHD
3 U-3 CG LINE 3B2 AND 3A1 PASSING AHD
4 CD CORNER 3 ATMOISING STEAM LKG BMD
5 LRSB 105 JAMMING. BMD
6 NEAR MILL 3G HAD GRATING AND RAILING REQUIRED , BMD
REPORTED IN SAFETY APP.
7 SD -42 BONNET LEAKAGE BMD
8 GH Elevation Oil guns to be made available BMD/C&I/
OPN
9 ALL 4 O2 TRANSMITTERS CALIBRATIONS REQUIRED C&I
10 MAIN TURBINE PEDESTRAL AND SHAFT VIB 3Y HUNTING C&I
16 HPT 1st stage pressure txr spare point v/v passing C&I/TMD
17 SEAL OIL P/P-A TAKING AUTO-START. NRV PASSING C&I/TMD
SUSPECTED
18 GT 3B BANK-C PUMP ABNORMAL SOUND EMD
19 GT 3Y BANK-B PUMP ABNORMAL SOUND EMD
20 GT-R D-BANK LOWER FAN ABNORMAL SOUND EMD
21 ID FAN-3B MOTOR WATER LKG ALARM EMD
22 SST-3A ODAT01 B-ph WINDING TEMP HUNTING EMD
23 UAT-3A OIL LVL LOW, OIL LKG, WT ERRETIC IN OWS EMD
24 UAT-3B OIL LKG CONSERVATOR TANK EMD
25 CPU v/v checking to be done OFS
26 CPU-3A Flow restriction to be checked OFS
27 Fire water leakage near Mill-3A OFS
S/D
S/D
S/D
S/D
S/D
Approach problem
Unsafe condition
OPPORTUNITY
Opportunity
Isolation problem
S/D
S/D
Long Pend
U/O
U/O
U/O
O/H
S/D
S/D
S/D
Opp
S/D
Over ground to be
done
Opportunity
S/D Job
Opportunity
s/D
S/D
U/O, OH
Long Pending
S/D Jobs
UNIT#4
S.No Description Deptt.
1 CG- 4B2 SLUICE GATE PASSING AHD
2 Bunker-4F liner damage 2 feet below bunker floor. BMD
3 Drum level validation system left side not working BMD
4 Drum safety valve RIGHT SIDE SV1 PASSING BMD
5 ERV SV10 passing BMD
6 Feeder-4G I/L chain gate free. BMD
7 ID FAN-4A IGV DE-LINKED BMD
8 LRSB 107 LANCE DAMAGE BMD
9 Mil-4H HAG jamming / inoperative. BMD
10 Mill-4J HAD passing. BMD
11 PAPH 4A AIR O/L DAMPER ACTUATOR IN REMOVED CONDITION BMD
Y
Y
Y
S/D Jobs
UNIT#5
S.No. Description Deptt.
1 PA FAN 5A FAN VIBRATION X HIGH(7.26 mm/Sec) BMD
2 RH spray SD-17Passing 10T BMD
3 SB C/V SD-24 PASSING BMD
4 GH Elevation Oil guns to be made available BMD/C&I/OPN
5 C&I
C&I DRAWOUT CONSOLE RELEASE BUTTON 'FALSE' FORCED.
6 RH SPRAY BLOCK V/V SD-12 INOPERATIVE C&I
7 TG Bearing & Shaft-2X Vib. Hunting C&I
8 U#5 ALL CTT ASH I/L VLV LIMIT SWITCH BYP C&I
9 MS Pr at Boiler O/L(LHS) Impulse line lkg C&I/BMD
11 CPU v/v checking to be done OFS
12 MOT COOLER B OIL SEEPAGE FROM TOP TMD
13 SCS-A GEAR MOTOR ACTUAL OVERLOAD/TAKING HIGH TMD
CURRENT AS PER EMD
14 Tur Exciter Brg Shaft vib-7x vib high (180MIC) TMD
15 TDBFP 5A CONIACL STRNR DRAIN LINE PASSING TMD
Remarks
Remarks
Opportunity
S/D
Opportunity
Long pending
SD
Opp
S/D
S/D Job
Opp
Spare N/A
S/D
S/D
S/D Jobs
UNIT#6
S.No. Description Deptt.
Remarks
Contract for EQMS shifting OFS/C&I
Long Pending
Committee required
for proposal initiation
fjgUn lqij FkeZy ikoj LVs'ku fjgUn
esfUVusUl eSustesaV lfoZl ¼vuqj{k.k izcU/ku lsok½
izzpkyu ,oa vuqj{k.k dh izfrfnu lqcg dh la;kstu cSBd
UNIT#2
Equipment Description Noti. Dt. Noti. No Deptt.
STAGE#1 COMMON
Equipment Description Noti. Dt. Noti. No Deptt.
DMP LP blower-1 poor discharge 28-Aug OFS
EQMS Contract for EQMS shifting 9-Aug OFS/C&I
LDO tank-1 Level transmitter erratic 25-Oct 105189667 C&I
(EEMG: 2.87m/ ows: 18m/ local
gauge not working)
SAC-4 Alarm to be provided in CCR 21-Oct C&I
Raw water pump -2 Raw water pump -2 & 3 VFD 29-Dec EMD
not working
ESP PASS ESP PASS EJECTORS VALVE 8-Feb AHD/C&I
EJECTORS 1B ,1H,2A&2C Inoperative
from remote.
UNIT#3
Equipment Description Noti. Dt. Noti. No Deptt.
CRH NRV CRH NRV STEAM LKG 25-Jul 105696356 TMD
U3 HPH-6B EXT.NRV PARTLY CLOSD 4-Oct 105834585 TMD/C&I
SUSPECTED
SEAL OIL P/P-A SEAL OIL P/P-A TAKING 11-Jan C&I/TMD
AUTO-START. NRV
PASSING SUSPECTED
SGECW 3A SGECW 3A PUMP BEARING 8-Jun TMD
Mill-B,C,E,F TEMP
MILL- RUNNING HIGH
C VIBRATION 8-Jun BMD
RUNNING HIGH
TDBFP-3B TDBFP-3B TURBINE VIB FJB 26-Jun TMD
& RJB VIBRATION
RUNNING HI
UNIT#4
Equipment Description Noti. Dt. Noti. No Deptt.
MILLs MILL 4C HAG OPEN 20-Jun 105628837 C&I
FEEDBACK NOT COMING
STAGE#2: COMMON
Equipment Description Noti. Dt. Noti. No Deptt.
DMP-2 MB blower-B poor discharge 12-Oct OFS
CW M/U-B Not stopping from OWS 16-Oct C&I
Road Road to be constructed 5-May Civil
between main road & CT 4B
CT4B CT4B TRANSFORMER LT 8-Feb EMD/C&I
BRKR I/O FROM REMOTE
UNIT#5
Equipment Description Noti. Dt. Noti. No Deptt.
U#5 ALL CTT SEGG U#5 ALL CTT SEGG VLV 11-Jun 105611867 C&I
LIMIT SWITCH BYP
MOT MOT COOLER B OIL 6-Jun 105600618 TMD
SEEPAGE FROM TOP
GH Elevation Oil guns to be made available 25-Jun BMD/C&I/
OPN
CT FAN 5B CT FAN 5B AREA WATER 31-May PROJECT
LOGGING / PERIPHERAL
DRAIN CHOKED
FIRE HYDRANT 106289623 24-May FIRE
LINE HYDRANT
LINE LKG
NEAR MILL
6E & 6B
GT-5R 106213398 20-May GT-5R HV
WINDING
TEMP
RUNNING
HIGH. (MAX
88 DEG)
UNIT#6
Equipment Description Noti. Dt. Noti. No Deptt.
FIRE HYDRANT Fire Hydrant Line Lkg Near 4-Jun 105597390 OFS
Feeder-6E
Stage-3 COMMON
STATION: COMMON
Equipment Description Noti. Dt. Noti. No Deptt.
Cooling system for old and 12-Jul TMD
new Compressors in St-1, MRC
Trgt Dt Remarks
Long pending
Long Pending
Long Pending
Long Pending
TMD/EMD LONG
PENDING
EMD U/O
Trgt Dt Remarks
Long pen
Long pen
TMD/EMD
U/O LONG
PENDING
Trgt Dt Remarks
Revised Offer awaited
Material not available
Long pending
Long Pending
Committee required
for proposal initiation
Long Pend
Long Pen
Trgt Dt Remarks
Over ground to be
Longdone
Pending
Long Pending
Long Pending
Long Pending
Long Pending
Trgt Dt Remarks
Spare N/A
Trgt Dt Remarks
OEM support
required
Spare N/A
Long pending
Long pending
Trgt Dt Remarks
Mat to be arranged
Spare N/A
Long pending
Long pending
OFS Isolation
required
EMD
U/O
Trgt Dt Remarks
Not isolating
Long Pending
Spare Problem
PR-100224386
Trgt Dt Remarks
Current
Temp
30'C