The daily safety report summarizes activities from a project installing ballistic windows and doors at location LOCK 2. On the date reported, the activities involved finishing sealant and installing door stoppers on two locks. Three workers were on site and no safety incidents were reported.
The daily safety report summarizes activities from a project installing ballistic windows and doors at location LOCK 2. On the date reported, the activities involved finishing sealant and installing door stoppers on two locks. Three workers were on site and no safety incidents were reported.
The daily safety report summarizes activities from a project installing ballistic windows and doors at location LOCK 2. On the date reported, the activities involved finishing sealant and installing door stoppers on two locks. Three workers were on site and no safety incidents were reported.
DAILY SAFETY REPORT 14-Jul-23 DATE DAILY NO. No. Location Time Activitie 1 LOCK 2 08.00 - 17.00 Finishing sealant & install door stoper 2 LOCK 2 08.00 - 17.00 Finishing sealant windows
Man Power Qty Meeting Qty Accident /Incident TODAY
Indolok Bakti Utama 1 Toolbox Meeting 1 Fatality / Kematian 0 Ballistic Door & Window 2 Lost Time Injury (LTI) 0 Safety Officer - Non Lost Time Injury (NLTI) 0 First Aid 0 Inspection Qty Near Miss 0 Total Man Power 3 Operation site Inspection Property/Asset damage 0 PPE - Man Hours 24 Tools Over Time : prsn X 4 hrs Manajemen Visit Yesterday Man Hours Total Today 0 Cumm Man Hours 24 Training Qty Weather : S: Sunny C: Cloudy R: Rain Material Safety Data Sheet - 08.00 : S 13.00 : S 09.00 : S 14.00 : S Safety Induction - 10.00 : S 15.00 : S 11.00 : S 16.00 : S Total Today 0 12.00 : S 17.00 : S Activity in site Area