G E O M A T I C S IB

(Subject code: GMTB101)

PRACTICAL MANUAL
Surveying a brighter future for all1South
Page of 25 Africans”- Together we can
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar

2020
Date: October 2020
Covid-19
TABLE OF CONTENTS:

1. Important Notes Pg 3

2. Geomatics practical details Pg 4

3. Practical exercise Pg 5

4. Project 1 brief – Triangulation Pg 6

5. Project 2 brief – Trigonometrical Heighting Pg 11

6. Practical activity – Staking out Horizontal curve Pg 15

7. Annexures Pg 18

 Annexure A: Co-ordinate list Pg 19

 Annexure B: Triangulation Control Plan Pg 21

 Annexure : Field book Pg 23

8. Declaration sheet Pg 24

Page 2 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
IMPORTANT NOTES:
 Practical’s form an integral part of learning. Practical’s are specifically
designed to enhance student participation.
 All students must fully participate in prac work to fully grasp the theory aspects
and to develop their skills required for Industry/work place learning.
 Students who unfortunately do not participate will encounter problems and
will not have the practical skills to cope with higher level subjects in year 2 and
year 3 of the programme.
 There is an allocation of 3 periods Practical instruction per week.
 All Practical’s are conducted in a group including the project submission.
 It is compulsory for students to fully attend all practical sessions during the
semester. A penalty (-10%) will be applied for every practical session
not attended at the discretion of the lecturer concerned. (refer to study
guide).
 Great care and precaution must be taken with Survey apparatus. Any
student caught mishandling the equipment as a result of negligence or
misuse will be severely penalized and will have to pay for damages as a
result.
 Students are required to dress appropriately for the survey practical’s as they
will be working out in the veld. They recommended attire is jeans or long
pants for all students. No dresses, sandals and open shoes will be allowed.
Students must also carry a hat or cap when working outdoors and a water
bottle to remain hydrated as we are working in hot and humid conditions.
 Students must use the appropriate reflective gear (safety bibs/vests) when
working alongside roads and intersections. Traffic cones and red flags must
also be used accordingly. These are available from the storeroom.
 All students must abide by the institutions code of conduct. Any student
found guilty of ill-discipline and misconduct will be dealt with accordingly
and could face suspension from the University.
 All students must maintain strict social distancing of between 1.5m to 2m
apart as per Covid-19 regulations.
 All students must wear a mask at all times.
 All students must sanitize their hands regularly and disinfect frequently
touched surfaces and objects.
 Only one observer per setup and one booker per setup.
 There is departmental sub-minimum of 50% on the practical work which is one
of the compulsory requirements to gain admission into the exam.
 The breakdown of the practical’s are as follows:-

Page 3 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
GEOMATICS PRACTICAL DETAILS:
This is divided into a set of two projects and one activity:

TOPIC: DESCRIPTION: MARK:


1) Triangulation  One point fixed by Intersection 60
 One point fixed by Resection
 One point fixed by GPS methods

2) Trigonometrical heighting  Three points fixed by backward observation 40


 One point fixed by forward observation

3) Setting out circular  Calculate, tabulate and sett out a circular 0


curve curve by the Deflection/Chord method.

Total: 100

Note: There is a sub-minimum of 50% for the practical work.

Page 4 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
DEPARTMENT OF CIVIL ENGINEERING & GEOMATICS
PRACTICAL EXERCISE FOR WEEK 1:

This basic exercise is ideal preparation for Project 1. Past experiences has shown that
some learners still experience difficulty in the basics of setting up the instrument,
setting and reading the horizontal circle, reading a vertical angle and recording the
observations in a methodical order in a field book.

In light of this, today’s task has been developed in preparation for the first project,
which will be conducted on the premises of the University of Kwa-zulu Natal
commencing next week.

Instruction – You are each required to carry out the following task:

• Set up and level the Total station over a ground peg.


• An arc of horizontal observations (CL and CR) must be carried out to a
minimum of at least 4 points excluding the R.O.
• Observe and record the vertical angle to at least one Trig point (CL and CR).
• Neatly book your observations in the required format.
• All relevant details must be indicated in your field book i.e. station name,
observer, booker, date, weather conditions, instrument number, instrument
height, serial no. etc.
• Reduce the field book observations (mean) and present the results to the
lecturer or technician for evaluation.

One person must carry out this task at a time and one booker will record the readings.
Thereafter after sanitizing the equipment and accessories, the next two will have an
opportunity and so on. You will be provided with a field book, and may request that
a group member assist with the booking. Once you have completed your
observations you must reduce the field book in your own time and present the results
to the lecturer or technician. Please ensure that all equipment borrowed is returned
to the storeroom.

Page 5 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
DEPARTMENT OF CIVIL ENGINEERING & GEOMATICS
GEOMATICS 1B
(GMTB101)

PROJECT BRIEF
SUB-GROUP ........ MEMBERS ............................................

...........................................

...........................................

...........................................

...........................................

TRIANGULATION : PROJECT No. 1


NOTE: THIS PRACTICAL COUNTS 60% TOWARDS YOUR PRAC MARK

1. IMPORTANTS GUIDELINES:

1.1 Cooperation between groups and between individuals is essential to the


successful completion of the project.
1.2 Each group must carry out the field work together as a team and submit a
group project collectively for assessment.
1.3 Booking of the field observations and reductions will be a group effort so that
all members are satisfied that the field data recorded is indeed correct.
1.4 Booking must be done in pencil and must include the following details:
Station name (e.g. PLAT), date, time, observer, booker, instrument type (e.g.
Nikon DTM 352), serial number, weather conditions etc.
1.5 All paper must be A4 size.
1.6 The project must be typed. Marks will be deducted for untidy work.
1.7 Layout and presentation is essential. On completion the contents of the project
must be filed in the correct order.

Page 6 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
1.8 No copying from other groups is permitted. If there is any evidence of copying
between groups, severe penalties will be imposed on the culprits and may
result in suspension from the University. (Refer to study guide)
1.9 We are fortunate to be using the venue and facilities of UKZN at their courtesy.
Any unruly or disruptive behaviour which discredits DUT or the department will
be totally unacceptable and disciplinary action which will be taken against
such individuals.

2. PRAC LOCATION:

DUT prac area / S- Block / Sports field

3. INSTRUCTIONS:

3.1 Three points must be fixed horizontally as follows:-

o AR1 – AR4 to be fixed by means of Intersection.


o RESEC1 – RESEC4 to be fixed by means of Resection.
o CH80, CH90, CH100, CH110, CH120 OS80, OS90, OS100, OS110, A2, B2,
Z1, Z2, P1 to be located and fixed by GPS methods.

3.2 AR1 – AR4 must be observed forward from a minimum of two Control points i.e.
DUT1 – DUT4.

3.3 Only horizontal directions are required.

3.4 One ARC of observation must be observed at the two known points i.e.
DUT1 – DUT4.

3.5 Note: An ARC of observation is a set of observations complete circle left and
circle right.

3.6 Two ARCS of observations must be made at the unknown points i.e. AR1 – AR4.

3.7 A minimum of between 4 – 6 Trig stations must be observed up to a maximum


of 8 points.

3.8 Each person must be given an equal opportunity to operate the instrument
and observe an Arc of observations.

No one is allowed to observe part of an Arc only. In other words, if a person


starts observing an Arc, then that person must observe both CL and CR.

3.9 At your resected point RESEC1 – RESEC4, you must use the following arbitrary
directions:
Page 7 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
@ RESEC1 – ∆BWT: 354º 50' 30”
@ RESEC2 – ∆BWT: 354º 50' 30”
@ RESEC3 – ∆BWT: 354º 50' 30”
@ RESEC4 – ∆BWT: 354º 50' 30”

4. SUBMISSION:

Students are given a reasonable time to complete the work taking into
account progress in both practical and theory lectures. The final submission
date for the completed project will be announced on Moodle. Late
submissions will be penalized as per Study guide.

4.1 The calculations must be submitted in the following format only:

Projects must be submitted in a suitable plastic file similar to the ones shown
below. Flip files will not be accepted.

4.2 The layout should be as follows:

Page 1: Cover sheet with a suitable title of the project, Geomatics IB sub
group number, group member’s names, group member’s student
numbers etc.

Page 2: Declaration note (signed and dated by all members)

Page 3: Table of Contents (including page no’s)

Page 4: A copy of this project brief.

Page 5: A locality sketch (use Google Earth)

Page 8 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
Page 6: A co-ordinate list including the three fixed points (AR1, RESEC1, A2,
B2, Z1, Z2, P1, CH120 etc.) showing the Y and X values. (Trig
beacons first followed by the fixed points in alphabetical order).

Page 7: A Ray diagram (size A3) to a scale of 1:10 000 showing all relevant
points, observed rays (in red), observed directions, grid lines, scale
and a north point. You have the option of producing the plan on
Model maker CAD or by manual drawing practices.

Page 8: Joins and Polar calculations

Page 9: The group’s field book neatly presented (in pencil). Reductions
may be in ink.

Page 10: Abstract sheet

Page 11 Direction Sheet

Page 12: Intersection calculations for AR1


Page12a: Triangle calculation (Sine Rule or Tangent Method)
Page12b: Error Cuts
Page12c: Weight Calculations

Page 13 Error figure for AR1 (on graph paper)

Page 14: Resection calculation for RESEC1 (Blunt’s method or Q-Point


method)
Page14a: Triangle calculation (Sine Rule or Tangent Method)
Page14b: Error Cuts

Page 15: Least squares computer solution for RESEC1 utilising (Model maker
or SurPAC) survey software

Page 16a: GPS data files (Leica or Trimble)


Page 16b: Spreadsheet comparison of all surveyed points (AR1, RESEC1, A2,
B2, Z1, Z2, P1, CH80, CH90, CH100, CH110, CH120 OS80, OS90,
OS100, OS110, etc.)

Page 17: Survey report as per the following structured headings:-

 Introduction
 Date of survey
 Aim of survey
 Details of the equipment and accessories used including
Name, number and graduated accuracy of the Total station.
 Weather conditions
Page 9 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
 Method of approach
 Your contribution
 Difficulties or abnormalities encountered
 General comments

Page 10 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
DEPARTMENT OF CIVIL ENGINEERING & GEOMATICS
GEOMATICS 1B
(GMTB101)

PROJECT BRIEF
SUB-GROUP ........ MEMBERS ............................................

...........................................

...........................................

...........................................

...........................................

TRIGONOMETRICAL LEVELLING : PROJECT No. 2


NOTE: THIS PRACTICAL COUNTS 40% TOWARDS YOUR PRAC MARK

1. IMPORTANTS GUIDELINES:

1.1 Cooperation between groups and between individuals is essential to the


successful completion of the project.
1.2 Instruments will be rotated for each practical. Your will therefore be required
to use a different instrument for project 2. The technician will issue you with
the respective machines.
1.3 Each group must carry out the field work together as a team and submit a
group project collectively for assessment.
1.4 Booking of the field observations and reductions will be a group effort so that
all members are satisfied that the field data recorded is indeed correct.
1.5 Booking must be done in pencil and must include the following details:
Station name (e.g. FIELD), date, time, observer, booker, instrument type (e.g.
Leica TC307), serial number, weather conditions etc.

Page 11 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
1.6 No copying from other groups is permitted. Each group must submit their own
reductions, and Trig heighting tabulations. If there is any evidence of copying
between groups, severe penalties will be imposed on the culprits and may
result in suspension from the University. (Refer to study guide)
1.7 The project must be typed. Marks will be deducted for untidy work.
1.8 Layout and presentation is essential. On completion the contents of the
project must be filed in the correct order.
1.9 We are fortunate to be using the venue and facilities of UKZN at their courtesy.
Any unruly or disruptive behaviour which discredits DUT or the department will
be totally unacceptable and disciplinary action which will be taken against
such individuals.

2. PRAC LOCATION:

DUT prac area / S- Block / Sports field

3. INSTRUCTIONS:

3.1 Each group must select and fix three points (DUT1, DUT2, DUT3, DUT4) by
backward heighting and one point (KI-HSE) by forward heighting, from DUT1,
DUT2, DUT3, DUT4.

3.2 You are required to measure the height of instrument (HI) at each station.

3.3 Pay careful attention to the rotational cycle.

3.4 Each pair of vertical circle left and vertical circle right observations is called a
"Set". The set for each point is completed before continuing to the next point.

3.5 One set of Vertical observations (circle left and circle right) should be recorded
to a minimum of four known points of known height. (e.g. ΔGlass, ΔEagle,
ΔHCT, ΔWoodls, AR1, AR2, AR3, AR4 etc.).

3.6 One set of Vertical observations (circle left and circle right) should be recorded
to the unknown point ∆ KI-HSE.

3.7 Each person must be given an equal opportunity to operate the instrument.
A set of observations must be completed by one observer, and a different
person should observe at each setup.

3.8 This instrument is transited after the first observation to each point. The
observations are therefore taken in the following order as shown in the
example below:-

Page 12 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
Point: Vertical Circle left Vertical Circle right
ΔSport 1st reading 2nd reading
ΔBiesh 4th reading 3rd reading
ΔRekaju 5th reading 6th reading
ΔPines 8th reading 7th reading
Shrine 9th reading 10th reading

3.9 The above procedure is followed so that the time lapse between the
observations to each point will be approximately equal, thereby maximising
the possible improvement in refractive conditions, while at the same time
minimising the effects of deteriorating conditions.

3.10 One must always ensure that horizontal cross hair is set exactly on the intended
target point each time when observing.

4. SUBMISSION:

Students are given a reasonable time to complete the work taking into
account progress in both practical and theory lectures. The final submission
date for the completed project will be announced on Moodle. Late
submissions will be penalized as per Study guide.

4.1 The calculations must be submitted in the following format only:

Projects must be submitted in a suitable plastic file. Flip files and plastic sleeve
pockets will not be accepted.

4.2 The layout should be as follows:

Page 1: Cover sheet with a suitable title of the project, Geomatics IB sub
group number, group member’s names, group member’s student
numbers etc.

Page 2: Declaration note (signed and dated by all members)

Page 3: Table of Contents (including page no’s)

Page 4: A copy of this project brief

Page 5: A co-ordinate list including the three fixed points (DUT1, DUT2, DUT,
DUT4, KI-Hse) showing the Y, X and Z values and all other relevant
points used. (Trig beacons first followed by the fixed points in
alphabetical order).

Page 6: The group’s field book neatly presented (in pencil). Reductions
may be in ink.

Page 13 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
Page 7: Joins and Polar calculations

Page 8: Backward Trig Heighting tabulation for DUT1

Page 9: Backward Trig Heighting tabulation for DUT2

Page 10: Backward Trig Heighting tabulation for DUT3

Page 11: Backward Trig Heighting tabulation for DUT4

Page 12: Forward Trig Heighting tabulation for ∆KI-HSE

Page 13: Survey report as per the following structured headings:-

 Introduction
 Date of survey
 Aim of survey
 Details of the equipment and accessories used including
Name, number and graduated accuracy of the Total station.
 Weather conditions
 Method of approach
 Your contribution
 Difficulties or abnormalities encountered
 General comments

Page 14 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
DEPARTMENT OF CIVIL ENGINEERING & GEOMATICS
GEOMATICS 1B
(GMTB101)

PRACTICAL ACTIVITY B R I E F
SUB-GROUP ........ MEMBERS ............................................

...........................................

...........................................

...........................................

...........................................

STAKING A HORIZONTAL CURVE WITH AN EDM


NOTE: THIS IS A PRACTICAL ACTIVITY AND DOES NOT CONTRIBUTE TOWARDS
YOUR PRAC MARK.

1. IMPORTANTS GUIDELINES:

1.1 Cooperation between groups and between individuals is essential to the


successful completion of the project.
1.2 Instruments will be rotated for each practical. Your will therefore be required
to use a different instrument for project 2. The technician will issue you with the
respective machines.
1.3 Each group must carry out the calculations together as a team and submit the
results as a group project. This includes the field book, curve calculations and
setting out data (Deflection/chord method).
1.4 The curve will be sett out on an arbitrary (local) system on the sport’s field.
1.5 Booking must be done in pencil. and must include the following details: Station
name (e.g. FIELD), date, time, observer, booker, instrument type (e.g. Leica
TC307), serial number, weather conditions etc.

Page 15 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
1.10 No copying from other groups is permitted. Each group must submit their own
calculations and tabulations. If there is any evidence of copying between
groups, severe penalties will be imposed on the culprits and may result in
suspension from the University. (Refer to study guide)
1.11 The project must be typed.
1.12 Layout and presentation is essential. On completion the contents of the
project must be filed in the correct order.
1.13 Any unruly or disruptive behaviour is totally unacceptable and disciplinary
action which will be taken against such individuals.

2. PRAC LOCATION:

DUT prac area / S- Block / Sports field

3. INSTRUCTIONS:

3.1 The calculation and curve tabulations (two tables) must be done prior to the
practical session (see CURVE DATA on the next page) and be ready for
submission on the day of the exercise. Two tabular curve calculations must be
done, one staking out from the BC and the other staking out from the EC which
will serve as an essential check to ensure all pegs are correctly placed.

3.2 The BC and PI pertaining to your particular curve will be pointed out to you on
the sports field. Co-operation between members and groups is essential for the
success of this project.

3.3 Each member of the group must be given the opportunity to set out at least
one deflection angle while other members set out the polar distance and
place the peg concerned. The pegs will be placed radially from the BC using
the “Polar distance” which must be calculated in addition to the Chord length
prior to the prac session.

Once the pegs have been placed from the BC, they must all be checked from
the EC again by using “Polar distance”.

3.4 For orientation you are to use the directions provided for your group (below).
You are to also measure the long chord as a check.

4. CURVE DATA

 I = 45º Radius and Arc/Chord varies according to group.

You are required to calculate and set out the curves given the following information
below:-
Page 16 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
GROUP No. 1 2 3 4 5
RADIUS 90m 100m 110m 120m 80m
STD ARC LENGTH 9m 10m 11m 12m 8m
CURVE Left Right Left Right Right
STATION CH90 OS100 CH110 OS120 OS80
Direction: BC → PI 272◦ 04’ 35” 47◦ 04’ 46” 272◦ 05’ 25” 47◦ 04’ 44” 47◦ 04’ 35”
Direction: EC → PI (Check) 47◦ 04’ 35” 272◦ 04’ 46” 47◦ 05’ 25” 272◦ 04’ 44” 272◦ 04’ 35”

5. SUBMISSION:

Students are given a reasonable time to complete the work taking into
account progress in both practical and theory lectures. The final submission
date for the completed activity/project will be announced on Moodle. Late
submissions will be penalized as per Study guide.

Page 17 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
Annexures

Page 18 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
ANNEXURE A:
PROJECT 1: TRIANGULATION CO-ORDINATE LIST
Survey System: WG31º

Point: Y X Elevation: Description:

TRIGNOMETRICAL BEACONS AND MINOR CONTROL:


EAGLE -2166.35 3304483.12 94.00
EL-HSE -2563.25 3304572.24 57.30
EMB-SY -2775.95 3304508.45 0.00
GLASS -2120.08 3304347.34 145.40
HCT 1791.28 3305322.79 192.30
KI-HSE -1307.12 3300510.64 ?
TECH-E -500.96 3303953.30 0.00
TECH-W -362.74 3303912.41 0.00
BLUFF -5492.33 3306458.90 82.00
BWT -1180.32 3310297.36 117.30
IS-VW -3780.82 3308841.60 107.40
IS-VWT -3778.68 3308828.95 128.30
MOBENI 4237.67 3312685.18 76.40
WOODLS 4737.53 3311598.10 142.70
SIGMA -5572.38 3306345.60 0.00
WWT 4712.65 3311548.94 0.00

CONTROL POINTS:
A2 -728.26 3303964.85 18.88
AR1 -857.89 3303916.69 16.40
AR2 -858.34 3303905.60 16.32
AR3 -855.15 3303907.24 16.38
AR4 -854.83 3303915.52 16.42
B2 -727.72 3303950.13 18.53
BJ1 -461.28 3303911.94 27.47
BJ2 -476.46 3303899.86 26.17
BJ3 -479.73 3303874.65 27.19
BJ4 -598.16 3303868.18 22.43
BJ5 -371.32 3303848.35 29.74
CH100 -738.61 3303959.03 17.56
CH110 -738.22 3303969.02 17.59
CH120 -737.87 3303979.02 17.64
CH80 -739.33 3303939.03 17.53
CH90 -738.97 3303949.04 17.56
OS100 -810.32 3303932.33 16.74
Page 19 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
OS110 -817.14 3303939.65 16.73
OS120 -823.94 3303946.97 16.70
OS80 -796.72 3303917.70 16.88
OS90 -803.53 3303925.00 16.82
DUT1 -510.03 3303964.83 ?
DUT2 -507.41 3303977.78 ?
DUT3 -502.48 3303985.69 ?
DUT4 -502.11 3303993.22 ?
H1 -462.25 3303879.71 27.58
H10 -441.77 3303841.90 25.70
H11 -374.30 3303842.80 29.65
H12 -282.46 3303950.21 32.55
H14 -865.90 3303912.40 16.43
H15 -814.13 3303840.75 16.66
H16 -764.47 3303718.21 15.49
H17 -340.81 3303975.34 29.42
H18 -544.12 3304023.90 25.15
H19 -367.99 3303859.83 29.57
H2 -486.77 3303878.02 26.11
H20 -431.18 3303868.88 29.44
H21 -505.28 3303839.27 24.95
H22 -562.91 3303950.76 22.89
H23 -449.20 3303847.00 25.88
H3 -521.40 3303860.47 24.13
H4 -511.43 3303841.99 24.11
H5 -416.76 3303865.95 29.51
H6 -352.64 3303880.52 30.78
H7 -389.10 3303899.23 28.12
H8 -435.41 3303906.31 27.82
H9 -464.04 3303868.88 26.03
P1 -740.33 3303878.33 17.09
RESEC1 -343.19 3303938.12
RESEC2 -341.81 3303940.17
RESEC3 -342.34 3303943.10
RESEC4 -340.42 3303945.03
RESEC5 -340.72 3303948.39
Z1 -823.16 3303975.63 16.87
Z2 -724.10 3303960.70 19.55

Page 20 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
ANNEXURE B: TRIANGULATION CONTROL PLAN

Page 21 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
Page 22 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
FIELD BOOK OBSERVATIONS:

GROUP No: …….…

Names of Observer: …………………………………. Name of Booker: ……………………………..…….

Height of Instrument: …………….… Date: …………………….. Time: ……………….…

Temperature: ……………..… Pressure: ………………..

Instrument type: ……………………..… Serial No: ………………………

Station Horizontal Observations


Mean Direction Corr. Adjusted Direction Remarks
name
CL CR

At ˚ ' " ˚ ' " ˚ ' " " ˚ ' "

Station Horizontal Height of


Vertical Observations Mean Angle
name Measured Dist. object / target
At

Page 23 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
GROUP PROJECT DECLARATION:

EXTRACT FROM THE UNIVERSITY REGULATIONS:


Academic Integrity
Note: The credibility of the Institution as a proud provider of top calibre tertiary, career-specific education and training is
dependent on its academic integrity as embodied in the worthiness and honesty of its staff, students and graduates, and
consequently of the qualifications it awards.

“The Institution is uncompromising in safeguarding its academic integrity. The following fraudulent acts will be regarded as
undermining the Institution's academic integrity and will therefore be severely dealt with:

• falsification of academic records, e.g, the altering of results on a Senior Certificate or any authorised results
statement;
• plagiarism, ie, the submission by a student or group of students, without acknowledgement, of written, visual, or oral
material or an idea, originally produced by someone else, purporting to be one's own work or a group's own work.
The Institution's Plagiarism Policy and Procedures for staff and students also refers; and cheating, ie, the gaining of
an unfair advantage by a student in any assignment, test, practical, tutorial, experiential training or examination.”

DUT 2018. General Handbook for Students. Durban. P28

The following members have actively contributed to the construction and compilation of this
Project/assignment. Any student or group found copying another student’s or group’s work, or any student or
group found allowing another student or group to copy his/her or their work, will be subject to disciplinary
action as per DUT rules and regulations which may result in suspension from the University. Refer to the
relevant DUT policies and rules.

PROGRAMME : BACHELOR OF THE BUILT ENVIRONMENT: GEOMATICS

MODULE : GEOMATICS IB – (GMTB101)

TITLE OF ASSIGNMENT : PROJECT 1: TRIANGULATION OR


PROJECT 2: TRIGNOMETERICAL HEIGHTING

MAIN GROUP : MONDAY A1 TUESDAY A2 (Tick one)

SUB-GROUP : ?

DATE SUBMITTED : ?

Page 24 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020
DECLARATION:

We, Sub Group No. ? comprising of the following group members listed below:-

No: Cell number Work Signature


Name and Surname Student Number attempted
1
2
3
4
5
6
7

hereby declare that the Survey Project/Practical assignment for Geomatics IB (GMTB101), that we are submitting
comprise only of our own and original work, and further declare that all members have contributed equally in
participating and compiling the project/assignment.

Page 25 of 25
Geomatics IB (GMTB101) – Practical manual Compiled & Revised by A. Raghubar
Date: October 2020