GENERAL NOTES AND SPECIFICATION

PANEL BOARD SINGLE SINGLE LINE DIAGRAM


1. ALL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH LINE DIAGRAM WITH ASSUMED FAULT POINTS
THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL
CODE(PEC), ORDINANCES ENFORCED BY THE BUILDING POWER
OFFICIALS, RULES AND REGULATIONS OF THE LOCAL FROM UTILITY FUSE
ELECTRIC COOPERATIVE. c COMMON
DISTRIBUTION
TRANSFORMER
Tapping
Point
7,620V
2. SERVICE VOLTAGE SHALL BE 230V SINGLE PHASE 60Hz.
f Sef KWHr

2-8.0 mm² THHN


Assuming 25 kVA,
7,620V/240V/120V, 60Hz, T
3. ELECTRICAL WIRING INSTALLATION SHOULD BE AN OPEN C2 C1 in a 25 mmØ Distribution Transformer.
WIRING , EXCEPT FOR THE MAIN SERVICE ENTRANCE R.T.LIM Municipal Hall

PB RMC (For Fault Computation and


CONDUIT WHICH IS RIGID METAL CONDUIT (RMC). PB Analysis purposes only)
30AT,30AF,
e 2-8.0 mm² THHN
in a 25 mmØ 10KAIC,2P,
RMC 240V,60Hz,
4. ALL WIRES SHALL BE PDX SOLID CONDUCTORS EXCEPT MCCB
FOR THE SERVICE ENTRANCE CONDUCTOR WHICH SHALL b A
BE THERMOPLASTIC INSULATED ( THHN OR TW).
Sabc
30AT C1

5. THE MOUNTING HEIGHT OF ALL WIRING DEVICES SHALL BE C1 20AT 15AT C2


AS FOLLOWS: B
d
MCB
A. LIGHT SWITCHES 1400 MM ABOVE FLOOR FINISHED;
B. CONVENIENCE OUTLETS 300 MM ABOVE FLOOR FINISHED
OR AS REQUIRED;
Scd PB PB
GROUND
ELECTRODE
1-5.5mm² THHN(G)
F1
C. PANEL BOARDS SHALL BE INSTALLED 1800mm ABOVE c a
FLOOR FINISHED LINE
D C
6. ALL ELECTRICAL INSTALLATION SHALL BE DONE UNDER
THE DIRECT SUPERVISION OF A DULY LICENSED AND CB-1 CB-2
EXPERIENCED ELECTRICAL ENGINEER OR A REGISTERED
MASTER ELECTRICIAN.
LIGHTING LAYOUT POWER LAYOUT F1 F2

THIS SCALE NTS SCALE NTS


SITE

TIMUAY DANDA
ALLIANCE CHURCH

NATIONAL
ROAD

TIMUAY DANDA
ELEM. SCHOOL

LOCATION PLAN
SCALE NTS

LEGEND AND SYMBOLS:


CEILING SOCKET
WITH LED BULB C1 CIRCUIT
PB HOMERUN
CONVENIENCE OUTLET
AT FAULT 1 AT FAULT 2 AT FAULT 3
Sa SINGLE GANG LIGHT SWITCH TRANSFORMER

Sab DOUBLE GANG LIGHT SWITCH GROUNDING


(GROUND ELECTRODE) ZU ZUP ZUP
Sabc TRIPPLE GANG LIGHT SWITCH ZT Isc ZC Isc ZD
Isc
PB ZUP ZA
PANEL BOARD IMPEDANCE
ZB
E=1.0 E=1.0 E=1.0
F FAULT pu pu pu
CIRCUIT BREAKER
POINT -3
-2

-1
ACU AIR CONDITIONING UNIT MCB CB-1 CB-3

F1 F2 F3
T8 18W T8 LED FLUORESCENT LIGHT

PROFESSIONAL ELECTRICAL ENGINEER PREPARED BY: OWNER: PROJECT TITLE: SHEET CONTENT : SHEET NO:
LOCATION PLAN
ELECTRICAL SYSTEM DESIGN OF A
RICHARD O. LIZARDO ENGR BRYAN LLOYD C. PALLEGA
GABREDO, MERLINA RAGURO
ONE(1) STOREY RESIDENTIAL BUILDING
GENERAL NOTES AND SPECIFICATIONS
LEGEND/SYMBOLS
ELECTRICAL LAYOUT E
ECR ENGINEERING AND SUPPLIES SERVICES
Buenavista St., Brgy Sto Niño, Zamboanga City,
TELEPHONE:
MOBILE :
955 6021/ 990 1011
0917 777 2322
PRC No
VALIDITY
: 003615 PTR No: 256 5483 DATE ISSUED:24 JAN 2023 PRC No
: 14 APR 2026 TIN: 172 634 729 ISSUED AT: ZAMBO CITY VALIDITY
: 006 4487 PTR No: 259 9267 DATE ISSUED: 17 JAN 2023
: 27 JAN 2026 TIN: 313 977 084 ISSUED AT: ZAMBO CITY LOCATION: TIMUAY DANDA, KABASALAN, ZAMBOANGA SIBUGAY
1 1
Email : richard.lizardo@yahoo.com