KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND

SERVICES (MYP)

PROACTIVE NOTIFICATION
1. SEPCO(To complete):
Project Title/No:
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES (MYP)

PN No:
SAC-MYP-QA(P4)-PAN-0005
Location /
Package 4.
Date Identified:
Date: 01-18-20
Responsibility:

HUTA Construction Group


Project Phase:

Construction

Violation / No Violation:

No Violation
Description of Notification:

It is found during routine surveillance of HUTA fabrication yard that assembling of steel cage(1200mm DIA) for
PTP-07 is in process but numbers of MAIN bars(25mm) is not as per approved IFC drawing(RA-622283), at site
found 20 nos bars every part of steel cage but actual as per drawing need 24 nos bars.
This is proactively informed to HUTA to follow the IFC drawing.

This is to prevent violation from company.

Reference Document (standards, specifications, drawings, etc.):

Proj Specs RE-614005 Rev.0 Sec 4.14.3.

SEPCO QC Supervisor: Name: Mr Salahudin Signature: Date:


Prepared by: Name: Wasim Javeed Signature: Date:

Received by Name: Signature: Date:


Construction
representative:

Page1 of 2
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND
SERVICES (MYP)

PROACTIVE NOTIFICATION

Action Required: YES NO


Action Taken:

Action by: Name: Signature: Date:

Verification:

Verification by:

Name:
Signature:
Date:

Closed:
SEPCO QC Supervisor
Name:
Signature:
Date
SEPCO QC Manager:

Name:
Signature:
Date:

Page2 of 2