Professional Documents
Culture Documents
Sac Myp Qa (p4) Pan 0005
Sac Myp Qa (p4) Pan 0005
SERVICES (MYP)
PROACTIVE NOTIFICATION
1. SEPCO(To complete):
Project Title/No:
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES (MYP)
PN No:
SAC-MYP-QA(P4)-PAN-0005
Location /
Package 4.
Date Identified:
Date: 01-18-20
Responsibility:
Construction
Violation / No Violation:
No Violation
Description of Notification:
It is found during routine surveillance of HUTA fabrication yard that assembling of steel cage(1200mm DIA) for
PTP-07 is in process but numbers of MAIN bars(25mm) is not as per approved IFC drawing(RA-622283), at site
found 20 nos bars every part of steel cage but actual as per drawing need 24 nos bars.
This is proactively informed to HUTA to follow the IFC drawing.
Page1 of 2
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND
SERVICES (MYP)
PROACTIVE NOTIFICATION
Verification:
Verification by:
Name:
Signature:
Date:
Closed:
SEPCO QC Supervisor
Name:
Signature:
Date
SEPCO QC Manager:
Name:
Signature:
Date:
Page2 of 2