Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Fine Tuning Procedures c.

Installation
Dead Band • VRP-SB-CH pilot should be installed as close as possible
to the control valve.
VRP-SB-CH pilot should be adjusted at the minimum dead band
without steady-state bleed gas. In control, the dead band can be • For actuators size 70 and larger, use ½ inch tubing between
widened to decrease bleed gas further. The control accuracy will diaphragm motor and output of VRP-SB-CH pilot.
be reduced.
• Orifices are adjusted at the maximum value #6.
When adjusting deadband, make sure to first loosen the sensitivity If stability cannot be achieved, supply and exhaust orifices
drum locking set screw. should be set at different values.
Once adjustment is complete, re-tighten locking screw as 1.2. Stability Adjustment for Small Downstream System
described in step 11 above.
The VRP-SB-CH pilot may be used with a damping tank.Supply and
Note: Steady state can be judged only when the control valve is exhaust orifices are marked “M”, while the standard tank orifice is
stationary. not marked.
Speed of Response or Stability Adjustment This configuration is used for control valves installed for a short
downstream system (for power plants use VRP-SB-PID controller).
1. VRP-SB-CH pilot with globe-style control valve (spring and
diaphragm actuator). a. Start up the system with supply and exhaust orifices at the
maximum value #6. The tank orifice should be at #1.
1.1. Standard Configurations
b. If the control valve is unstable slowly increase the tank orifice
a. Power Gas until stability is achieved.
35 psig for 6-30 psig spring c. If the control valve continues to cycle the supply and exhaust
20 psig for 3-15 psig spring orifices should be set at different values.
150 psig – maximum supply to VRP-SB-CH
Note: Supply or exhaust orifices should not be set less than #2
b. Supply and exhaust orifices opening. If desired control is achieved with an orifice less than #2
 Control valve “M”-medium, monitor valve “L” -large. If applica- opening, the orifice barrel should be replaced with a smaller one.
tion is not known at the time of ordering, “M” orifices will be d. If desired control cannot be achieved, VRP-SB-PID controller
provided. should be used.

Direct acting shown


(Spring to open)

FLOW

Figure 8

9 | GE Oil & Gas © 2017 General Electric Company. All rights reserved.

You might also like