Professional Documents
Culture Documents
Dec 21 Report
Dec 21 Report
Dec 21 Report
201501035983 (1161303-X)
Lot PT 2611, Jalan Subang 7
Subang Industrial Park, 47500 Subang Jaya
Selangor Darul Ehsan
[IN COMPLIANCE WITH OCCUPATIONAL SAFETY AND HEALTH (SAFETY AND HEALTH OFFICER)
REGULATION 1997]
MARCH 2021
BUWANAH SELVARAJOO
HSE ANALYST
Approved by: Signature: Date:
VENOTH NAIR
HSE MANAGER
BUWANAH SELVARAJOO
HSE ANALYST
1 OSH (Safety Policy) Workers are not fully aware of - Displayed policies at various strategic
the content of the HSE Policy location and explain contents to
Regulation 1995
stakeholders.
Company OSH
Policy
2 Safety and Health HSE Committee Meeting - Should be conducted 3 months once
Committee basis or frequently.
Regulation 1996
-Appointment letters distributed to
HSE Committee members via email
3 Factory and PMA number not displayed at PMA numbers displayed at both goods
Machinery Act goods lift lift
2. Method of establishing and maintaining a safe and healthy working condition in the place of work
1 First aid Numbers of first aiders for FFM OTD Team to organize Basic
are not many Occupational First Aid (BOFA) for
stakeholders
2 Safety board Outdated notice board / safety Displayed safety policy and emergency
BUWANAH SELVARAJOO
HSE ANALYST
information
3 PPE The workers are seen working PPE should be supplied once the
without proper PPE supply is sufficient.
HSE ANALYST
1 One first aid case Cut on knee while coming down First aid treatment administered and
from mezzanine stairs the injured person was asked to rest
his leg for 5 minutes until the bleeding
subsides.
4. Machinery, plant, equipment, appliance, substances, manual labor liable to cause bodily injury or
any person working in the place of work and to minimize such risk
1 Poor housekeeping Workers and visitors might trip Arrange pallets and pallet jacks in a
over pallets way that does not distrupt the
pathway.
2 Fire extinguishers Expired fire extinguishers Fire extinguishers license has been
renewed.
3 Shredder machine Poor knowledge on how to use Training to commence once the
the shredder machine safely shredder training slides are ready
5. Machinery, plant, equipment, appliance, or any personal protective equipment required for the
purpose of minimizing any such risk
HSE ANALYST
- beside mezzanine N
2 Replenishment of Items inside first aid boxes List of items needed was emailed to
first aid kit items needs replenishment procurement for purchasing
6. Recommendation of alteration made to place of work for safety and health of persons.
- - - -
7. Work related to safety and health engaged by the employer in order to promote safety and health
in the place of work.
- - - -
BUWANAH SELVARAJOO
HSE ANALYST
2 LEV - -
3 Accident - -
graph/trend
-END OF REPORT-