Preliminary sizing
(i) to fire resistance
span L
(ii) to , ratio = = 26
Depth D
4500
Maximum longest span = =¿ 173.1mm
26
8
Overall depth 173+50+25+ = 256.1 mm
2
Take, D=450 mm
H=600mm
Width =450 x 0.4=240 mm
Take width=300mm
Load on beam
Load combination
12
lx
B ly B
`
UTMOST CONSULTING Job no: 08 sheet no: 1/2 rev: 01
ENGINEERS UTM-PT 14/02/ 2021
consultation sheet RC BEAM DESIGN
JOB TITTLE: PROPOSED MIXED USE COMMERCIAL BUILDING AT Org. ref. STR/UTM-PT/14/02/2021
MUGUTHA, RUIRU KIAMBU COUNTY: PLOT 1/10246 made by MMM date: 14/11/21 chd FMG
1st, 2nd,3rdand 4th. floor typical beams Signature…………… Signature……………
BEAM DESIGN
Load transfer from slab to beam on yield line method
DESIGN OF BEAM 01
SKETCH
n=10.94kN/m
ly 3341
K= = = 1.13
lx 2964
nlx 1
P= {1− 2 }
2 3k
P=11.98 KN/m
ly 3920
K= = = 1.32
lx 2964
nlx 1
P= {1− 2 }
2 3k
P=13.1 KN/m
ly 3414
K= = = 1.36
lx 2517
nlx 1
P= {1− 2 }
2 3k
P=11.3 KN/m
Load on span12/”-F’-I
ly 3414
K= = = 1.36
lx 2517
nlx 1
P= {1− 2 }
2 3k
P=11.3 KN/m
=2
5k
N/
m
JOB TITTLE: PROPOSED MIXED USE COMMERCIAL BUILDING AT Org. ref. STR/UTM-PT/14/02/2021
MUGUTHA, RUIRU KIAMBU COUNTY: PLOT 1/10246 made by MMM date: 14/11/21 chd FMG
1st, 2nd,3rdand 4th. floor typical beams Signature…………… Signature…………………….
BEAM DESIGN
Fy 460N/mm2
Fcu 30N/mm2
B 200mm
H 500mm
Cover 25mm
References Calculations Ou
tp
ut
Membe AC” C”A C”E E”C’ ’E”F’ F’E” F’I I F’
r
DF 0 0.4731 0.5269 0.5440 0.4560 0.5647 0.535 0
3
FEM -80.18 +80.18 -46.62 +46.62 -34.12 +34.12 - +79.63
79.73
Bal 0 - 15.88 -17.68 -6.8 -5.7 +25.76 +25.4 0
2
CO -7.94 0 -3.4 +8.84 +12.88 -2.80 0 +12.71
Bal 0 +1.79 +1.79 -2.198 +1.842 +1.581 +1.22 0
CO +0.895 0 -1.098 +0.895 +0.790 -0.921 0 +0.61
5
bal 0 +0.5195 +0.579 -0.9170 -0.690 -0.520 -0.52 0
CO +0.2598 0 -0.4185 +2.90 -0.260 - 0 -0.274
0.3845
Total -86.97 +66.61 -66.61 +29.05 -29.05 +58.7 -58.7 +92.8
Let ΣMD=0
3.45 VAD
=
25 X 3.45²
=-37.39
2
VA = 48.64kN
Let Σfy=0
VA.x-VD=86.25-48.64=37.61KN
VD=37.61
29.53 x 3.5²
3.5VD-37.39- = - 27.59KN
2
VD=71.93kN
Let fy=0
VD+VG=(39.53X3.5)=130.36KN
VG =138.36-71.98=66.43KN
Maximum span moment
39.53 x ²
Mx= VDX - 37.39 - = 71.98x2-37.39-19.8x2
2
δm x
=Qx =71.98-19.8x
δx
Maximum Bending moment at zero shear
71.98-19.8x=0
x=1.68 m
Bmmax=71.98(1.68)-37.39-19.8(1.682) =-28.22kNm
SPAN (G-K)
Let ΣMk=0
3.45VG -
27.59 -
25 x 3.45²
2
= - 49.63
VG = 36.74 kN
Let Σfy=0
VG+VK=(25x3.45)=86.25
VK = 86.25 - 36.74 =49.51kN
25 x ²
Mx=VGX-27.59- =36.74x-27.59-12.5x2
2
δm x
=Qx =36.74-12.5x
δx X=1.9052m
SPAN (K-M)
Let ΣMV=0
41.82 x 4.6²
4.6VK -49.63- = 0
2
VK=104.15KN
Let fy=0
VK+VM=(41.82x4.6)=192.372KN
VM=192.372-106.98=88.22KN
Span Moment
41.82 x ² 106.98 41.82 x ²
Bm .max=Vkx-49.63- = -49.63-
2 2 2
δm x 106.98
=Qx = -20.91x
δx 2
Bm.Max=80.1kNm
X=2.558m
UTMOST CONSULTING Job no: 08 sheet no: 1/2 rev: 01
ENGINEERS UTM-PT 14/02/ 2021
consultation sheet RC BEAM DESIGN
JOB TITTLE: PROPOSED MIXED USE COMMERCIAL BUILDING AT Org. ref. STR/UTM-PT/14/02/2021
MUGUTHA, RUIRU KIAMBU COUNTY: PLOT 1/10246 made by MMM date: 14/11/21 chd FMG
1st, 2nd,3rdand 4th. floor typical beams Signature…………… Signature…………………….
BEAM DESIGN
Fy 460N/mm2
Fcu 30N/mm2
B 200mm
H 500mm
Cover 25mm
References Calculations Ou
tp
ut
m 44.5 x 10⁶
k= = = 0.0296
fcu .bd ² 30 x 300 x 409²
Cl 3.4.4.4
z k 0.0
=0.5+√ (0.25− )=0.97>0.95
d 0.9 88
Z=0.95x409=388.6 m 1<
m 0.1
Ast=
0.95 fyz
56
44.5 x 10⁶ 2
Ast = =262.05 m m /m He
0.95 x 460 x 388.6
nce
Provide 3T12 {339 mm2 /m}
no.
co
Minimum steel area check
mp
100 As 100 x 442
¿ = =0.65
bh 200 x 350 res
0.65 > 0.13 sio
Cl 3.12.6
Hence steel provided is ok n
Maximum Area of steel check rei
Tension nor compression reinforcement should not exceed 4% cross section area of concrete nfo
rce
me
nt
req
uir
ed
Pro
vid
e
3T
12(
To
p
{3
39
m
m2/
m}
Cl 3.4.5.5 c/c
{no
Cl 3.4.1.6 min
al}
UTMOST CONSULTING Job no: 08 sheet no: 1/2 rev: 01
ENGINEERS UTM-PT 14/02/ 2021
consultation sheet RC BEAM DESIGN
JOB TITTLE: PROPOSED MIXED USE COMMERCIAL BUILDING AT Org. ref. STR/UTM-PT/14/02/2021
MUGUTHA, RUIRU KIAMBU COUNTY: PLOT 1/10246 made by MMM date: 14/11/21 chd FMG
1st, 2nd,3rdand 4th. floor typical beams Signature…………… Signature…………………….
BEAM DESIGN
Fy 460N/mm2
Fcu 30N/mm2
B 200mm
H 450mm
Cover 25mm
References Calculations Ou
tp
ut
Cl 3.4.6 Check for deflection
Mid span of flange designed as a flange section
b 200
= =0.237<0.3
bw 844
Table 3.9
span
Basic [ ] =16
effectiv depth
Continuous beam
Cl 3.4.6.4 span
Basic [ ] =20.8
effectiv depth
Span of beam=4600mm
14.9
Modification factor of span [ ]=3.24
4.6
In this beam; the condition at support M is simply supported and continuous at K
Cl 3.4.6.4
Basic [ span
effectiv depth]= [
20.8+16
2
]==18.4
span 4600
Actual [ ]= [ ]=14.9
effectiv depth 309
span span
Allowable [ ] = Basic [ ] x F1x F2
effectiv depth effectiv depth
F1=modification factor for tension reinforcement
F2= modification factor for compression reinforcement
2 As rep 1
F S= fy x x
3 As provided Bb
2 739.81 1
F S= x460 x x =306.17 N/mm2
3 741 1
M 94.92 x 10⁶ =¿
= 1.18 N/mm2
bd ² 3092 x 844
477−Fs
(477−307.18)
F1=0.55+ 120(0.9+ m ) =0.55+ =1.24 < 2
2 120(0.9+1.18)
bd
span span
Allowable [ ] = Basic [ ] x F1x F2
effectiv depth effectiv depth
span
Allowable [ ] = 14.9 x1.24 x1= 18.5
effectiv depth
span span
Allowable [ ] > Actual [ ]
effectiv depth effectiv depth
(200 x 3 x 16)−2 x 8
Spacing of bars = =28.7 m
3
Vd=104.15-(41.82x0.1) =99.97kN
99.97 x 103
V= = 1.62N/mm2
200 x 309
Concrete shear stress
Area of tension reinforcement at a distance ‘d’ from face of support{50% of 741 mm 2=370.5
mm2/m provide 402 mm2}
400 400
[ ] ¼=[ ] ¼=1.067 >1
d 309
Shear reinforcement required
100 As 400 1 fcu
VC=0.79x[ ]⅓ x [ ] ¼ x1.067x x[ ¿⅓
bh d δm 25
1
=0.79x0.60x0.9975x x1.06=0.429 N/mm2
1.25
(200 x 3 x 16)−2 x 8
Spacing of bars = =28.7 m
3