TTP2 Project
Daily Inspection Report
NO OF
INSPECTION NO: TTP2 / 1935 DATE / TIME: 16/06/2023 / 1500 hrs PAGES
05
Responsible Person
S/N Findings Location Rectifications / Preventive Actions
(Company)
Geoharbour
01 Geoharbour
PVD RIG
Action Taken: Grad rail
Findings: Openings seen on the have been installed
top of the engine. opening on the top of the
Recommendation: Additional engine.
guardrail (top & mid-rail) to be in Date Closed: 18.06.2023
place.
Geoharbour
02 Geoharbour
PVD RIG
Page1
Safety Inspection Report
Geoharbour
03 Geoharbour
PVD RIG
Geoharbour
04 Geoharbour
PVD RIG
Action Taken: Top rail
have been raised to 1m
in height.
Page 2
Safety Inspection Report
Geoharbour
05 Geoharbour
PVD RIG
Date Closed:19.06.2023
Findings: Tripping hazard
observed at access/egress point.
Recommendation: Warning
signage to be in place prominently
for awareness purpose.
Geoharbour
06 Geoharbour
PVD RIG
Page 3
Safety Inspection Report
Findings: Daily pre-operational Geoharbour
07 Geoharbour
checklist seen not prepared PVD RIG
pictorial.
Recommendation: Daily pre-
operational checklist is to be
prepared pictorial.
Geoharbour
08 Geoharbour
PVD RIG
Page 4
Safety Inspection Report
Geoharbour
09 Geoharbour
PVD RIG
Page 5
Safety Inspection Report