PVD Machine Daily Safety Inspection On Date 16.06.2023

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

PENTA-OCEAN / HYUNDAI / BOSKALIS / JOINT VENTURE

TTP2 Project
Daily Inspection Report
NO OF
INSPECTION NO: TTP2 / 1935 DATE / TIME: 16/06/2023 / 1500 hrs PAGES
05

INSPECTED BY: DAVID / ALI ASRAF

ACKNOWLEDGED BY: GEOHARBOUR

AREA OF INSPECTION: GEOHARBOUR PVD RIG

Responsible Person
S/N Findings Location Rectifications / Preventive Actions
(Company)

Geoharbour
01 Geoharbour
PVD RIG
Action Taken: Grad rail
Findings: Openings seen on the have been installed
top of the engine. opening on the top of the
Recommendation: Additional engine.
guardrail (top & mid-rail) to be in Date Closed: 18.06.2023
place.

Geoharbour
02 Geoharbour
PVD RIG

Action Taken: A safe


Findings: Unsafe positioning of platform with gird rail
footrest. have been installed.
Recommendation: To in place a
safe platform for footrests. Date Closed: 18.06.2023

Page1
Safety Inspection Report
Geoharbour
03 Geoharbour
PVD RIG

Findings: Gaps seen in between


guard rails. Action Taken: The gap
Recommendation: To provide has been closed by chain
chain barriers ( top & mid-rail). barrier.

Date Closed: 18.06.2023

Geoharbour
04 Geoharbour
PVD RIG
Action Taken: Top rail
have been raised to 1m
in height.

Date Closed: 18.06.2023

Findings: Top guard rail seen less


than 1m in height.
Recommendation: Top rail is to be
raised to 1m in height.

Page 2
Safety Inspection Report
Geoharbour
05 Geoharbour
PVD RIG

Action Taken: Warning


signage have been
displayed.

Date Closed:19.06.2023
Findings: Tripping hazard
observed at access/egress point.
Recommendation: Warning
signage to be in place prominently
for awareness purpose.

Geoharbour
06 Geoharbour
PVD RIG

Action Taken: The side


Findings: The mirror was observed mirror has been
to be blurred. replaced.
Recommendation: The mirror is to
be replaced for a clearer view. Date Closed: 17.06.2023

Page 3
Safety Inspection Report
Findings: Daily pre-operational Geoharbour
07 Geoharbour
checklist seen not prepared PVD RIG
pictorial.
Recommendation: Daily pre-
operational checklist is to be
prepared pictorial.

Action Taken: Daily pre-


operational checklist has
been prepared pictorial.

Date Closed: 18.06.2023

Geoharbour
08 Geoharbour
PVD RIG

Findings: Access/egress to the


operator cabin seen without Action Taken: Access
handhold. have been provided with
Recommendation: handhold.
Access/egress to be provided
with handhold. Date Closed: 18.06.2023

Page 4
Safety Inspection Report
Geoharbour
09 Geoharbour
PVD RIG

Action Taken: Removed


unnecessary platforms
and all the rest of it has
been displayed proper
Findings: PVD rig walk platforms signages.
seen without guard rails.
Recommendation: Warning Date Closed: 19.06.2023
signages to be in place to prevent
persons to walk on the platform &
then guard rails to be provided to
the walk platforms.

Page 5
Safety Inspection Report

You might also like