SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY

TENDER DOCUMENT
Tender No: KRISHNA-RIVER-BR-195-EPC Closing Date/Time: 17/11/2023 15:00

Chief Administrative Officer, Construction acting for and on behalf of The President of India invites E-Tenders against Tender No
KRISHNA-RIVER-BR-195-EPC Closing Date/Time 17/11/2023 15:00 Hrs. Bidders will be able to submit their original/revised bids upto
closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored.

1. NIT HEADER

Construction of Important Bridge No.195 at CH: 147/385 across Krishna river in Gadag
Name of Work
(GDG) - Wadi (WADI) New Line Project (257 Km)
Bidding type EPC [ Single Stage ]
Tender Type Open Bidding System Two Packet System
Tender Closing Date Time 17/11/2023 15:00 Date Time Of Uploading Tender 22/08/2023 13:34
Pre-Bid Conference
Yes Pre-Bid Conference Date Time 15/09/2023 11:00
Required
2nd Pre-Bid Conference 2nd Pre-Bid Conference Date
No Not Applicable
Required Time
Advertised Value 2812993913.44 Tendering Section TENDER SEC
Single Rate for Each Schedule
Bidding Style Bidding Unit
Item
Earnest Money (Rs.) 14065000.00 Validity of Offer ( Days) 180
Tender Doc. Cost (Rs.) 0.00 Period of Completion 24 Months
Contract Type Works Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 03/11/2023 Yes
allowed to bid
Ranking Order For Bids Lowest to Highest Expenditure Type Capital (Works)
Docs. Receipt Confirmation Required

2. SCHEDULE

S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Code Unit
Schedule M-Lumpsum item 2812993913.44
Above/
Lump Sum 2812993913.44 AT Par 2812993913.44
Below/Par
1
Description :- Construction of Important Bridge No.195 at CH: 147/385 across Krishna river in Gadag (GDG) -
Wadi (WADI) New Line Project (257 Km).

3. ITEM BREAKUP

No item break up added

4. ELIGIBILITY CONDITIONS

Important : All documents uploaded and remarks / confirmation entered by the bidders against any eligibility condition
shall be opened as part of technical bid only

5. COMPLIANCE

Important : All documents uploaded and remarks / confirmation entered by the bidders against any compliance
condition shall be opened as part of technical bid only.

Commercial-Compliance

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading

Pa g e 1 o f 3 Ru n Da te/Time: 12 /0 9 /2 0 2 3 18 :5 2 :0 5
SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
TENDER DOCUMENT
Tender No: KRISHNA-RIVER-BR-195-EPC Closing Date/Time: 17/11/2023 15:00

Please submit a certificate in the prescribed format for verification


/confirmation of the documents submitted for compliance of eligibility/qualifying
criteria. Non-submission of the certificate, or submission of certificate either Allowed
1 No No
not properly filled in, or in a format other than the prescribed format shall lead (Mandatory)
to summary rejection of your offer. (Format attached in document description
"FORMAT FOR MANDATORY DOCUMENT" under heading Documents).
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
2 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.
Allowed
3 Please refer RFP document attached. Yes Yes
(Optional)

General Instructions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
1 Please refer RFP document attached. No No Not Allowed

Special Conditions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
1 Please refer RFP document attached. No No Not Allowed

Technical-Compliances

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Allowed
1 Technical Capacity as per RFP document attached. No No
(Mandatory)
Allowed
1.1 Financial Capacity as per RFP document attached. No No
(Mandatory)
Allowed
1.1.1 Any other document(s) as per RFP attached. No No
(Mandatory)

Undertakings

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
I/ We have visited the works site and I / We am / are aware of the site
1 No No Not Allowed
conditions.

Physical Docs Mandatory Submission

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Allowed
1 As per RFP Documents. No No
(Mandatory)

Custom

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading

6. Documents attached with tender

S.No. Document Name Document Description


1 BITUMENROADSECTION.pdf BITUMEN ROAD SECTION
2 CONCRETEROADSECTION.pdf CONCRETE ROAD SECTION
3 DRAINSECTION.pdf DRAIN SECTION
4 TROLLEYREFUGEINEMBANKMENT.pdf TROLLEY REFUGE IN EMBANKMENT
5 RFPDOCUMENT.pdf RFP Document

Pa g e 2 o f 3 Ru n Da te/Time: 12 /0 9 /2 0 2 3 18 :5 2 :0 5
SWR-CONST-HQ-ENGG/SOUTH WESTERN RLY
TENDER DOCUMENT
Tender No: KRISHNA-RIVER-BR-195-EPC Closing Date/Time: 17/11/2023 15:00

6 EPCtenderforImportantBridgeNo.1951.pdf EPC Draft Agreement


7 CORRIGENDUMTORFPDOCUMENT.pdf Corrigendum to RFP document
FORMAT FOR MANDATORY DOCUMENT
8 FORMATFORMANDATORYDOCUMENTVERIFICATION.pdf
VERIFICATION

This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Induswww Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.

As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violate provisions of
GFR regarding procurement through GeM.

Signed By: TS SURAJ KUMAR

Designation : Dy.CE/CN/WORKS/BNC

Pa g e 3 o f 3 Ru n Da te/Time: 12 /0 9 /2 0 2 3 18 :5 2 :0 5