The document is a comment resolution sheet between Saudi Aramco and a contractor regarding approval of a batching plant. It details 4 items requiring resolution: 1) documents proving no impact approving the plant will have on other batch plants, 2) a company ownership profile, 3) a signed manufacturer compliance letter, and 4) responses to corrective action requests with a plan and completion dates. The contractor has noted and attached the requested documents and information to address each item.
The document is a comment resolution sheet between Saudi Aramco and a contractor regarding approval of a batching plant. It details 4 items requiring resolution: 1) documents proving no impact approving the plant will have on other batch plants, 2) a company ownership profile, 3) a signed manufacturer compliance letter, and 4) responses to corrective action requests with a plan and completion dates. The contractor has noted and attached the requested documents and information to address each item.
The document is a comment resolution sheet between Saudi Aramco and a contractor regarding approval of a batching plant. It details 4 items requiring resolution: 1) documents proving no impact approving the plant will have on other batch plants, 2) a company ownership profile, 3) a signed manufacturer compliance letter, and 4) responses to corrective action requests with a plan and completion dates. The contractor has noted and attached the requested documents and information to address each item.
CLIENT : SAUDI ARAMCO CTR REF NO : DTN-JGCP-LTS-SAO-0306
PROJECT TITLE : Jafurah Gas Compression Plants (GCPs) and Produced Water Injection Station (PWIS) (Package-1) COMPANY REF NO : JGCP-SA-LTE-T-0448 DISCIPLINE : CIVIL DATE: 28-May-23 DOC NUMBER QM-769-PL-2319 CRS NUMBER: : DOC REVISION B CRS REVISION B DOC DESCRIPTION ONE TIME BASIS APPROVAL OF BATCHING PLANT- HACO -AL-HASA-QATAR ROAD
COMPANY CONTRACTOR (1st Response) COMPANY CONTRACTOR
(2nd Response) COMPANY Resolution Resolution Revi (Accepted/ Justification/Reason for (Accepted/ Item No. Date Reviewer Name Page / Section No. Reviewer Comments Originator Response Originator Response Justification/Reason for Rejected Response sion Rejected/ Rejected Response Rejected/ Others as noted) Others as noted) The proposed BP QC personnel have previously been approved with control number. Accordingly, there is no need for an interview anymore. Hence, the needed documents are required that prove no impact on the other BP, such as release letter and updated Mohammad S. Al orhanization chart for both BPs. 1 28-May-23 B Noted. Sultan. In addition, kindly follow up for other documents that were requested from the batch plant to submit/send to BP&CTU to move forward for the preparation of Pre-approval package.
Mohammad S. Al Company Ownership Profile.
2 28-May-23 B Noted.Attached Sultan. Mohammad S. Al Signed Manufacturer compliance Letter. 3 28-May-23 B Noted.Attached Sultan. Submit/respond to CARs with Corrective Plan/Action and Mohammad S. Al Agreed Completion Date. (Initiate a separate CRM). 4 28-May-23 B Noted.Attached Sultan.