Stage 3C – Construction
documents
Phase 3C
Code KSP-RBT-RAC-CD-CAL-SAN-0003.docx
Date: 20.03.2023
Date: 21.03.2023
Recipient RBTA
Notes Revision 01
Change tracker
Main modification Review of calculation according minor changes in network geometry (KSP
from stage 3c network connection update)
KSP-RBT-RAC-DD-CAL-SAN-0003 ...................................................................................................................................................... 1
1. Sanitary network.................................................................................................................................................................................. 5
Index of Tables
1.1. Description
Three routes are planned to collect sanitary water from buildings D1, D2, D3, D5 and D6. Run
B-W collects water mainly from buildings D1, D6 and D5. Run B-SE collects water from the
southern buildings D2 and D3. Run B-NE collects water from the northern buildings D2 and
D3
This calculation pack contains the calculations used to size the external sanitary network at
Plot A of the RAC.
The Plot B network has not been updated with respect to the Schematic Design phase as flow
rates and location of discharge points are under review.
The Water Consumption Method estimates the design flow at each discharge point into the
KSP network, based on a proportion (85%) of the water consumption, multiplied by a peaking
factor, in accordance with guidance from Omrania.
P= Population
Daily consumption data has been converted into an average flow rate in litres per second
assuming 10h occupancy per day.
The flow rate calculated by the Discharge Unit method has been used to size the on-plot
network. Autodesk Storm and Sanitary Analysis 2020 hydraulic modelling software has been
used to calculate flows in each pipe in the network which has been sized accordingly to
ensure no full bore flow within the network (SBC 701).
Flows discharged to each manhole per type of buildings have been calculated as shown
below:
The calculation of flow generated in each building made in the schematic design needs to
be adjusted to estimate the flow discharged to each of the manholes in a given building.
For this purpose, the DU factor has been considered by distributing the estimated global
flow according to the DU number of each outlet.. MEP report KSP-RBT-RAC-ENG-BSE-CAL-
5013 calculates these DU values.
Average
Flow (l/s)
10 hours
per day
Building Potential DU AWC PWC (l/d) Water to SWADD M (Peak Gravity Peak
ocupants l/d Sanitary Coeficient) flow (l/s)
Flow
Factor
D1&D6 Performing Arts 1320 52.9 30 7457.60057 85% 0.18 4.40 0.77
and Music/Heritage 0.00
46.5 30 6555.35778 85% 0.15 4.40 0.68
43.4 30 6118.33393 85% 0.14 4.40 0.64
8.5 30 1198.29121 85% 0.03 4.40 0.12
10.2 30 1437.94945 85% 0.03 4.40 0.15
44 30 6202.91919 85% 0.15 4.40 0.64
3.2 30 451.121396 85% 0.01 4.40 0.05
15.7 30 2213.31435 85% 0.05 4.40 0.23
48.7 30 6865.50374 85% 0.16 4.40 0.71
7.8 30 1099.6084 85% 0.03 4.40 0.11
D5 Auditorium 319 3.8 30 1010.16667 85% 0.02 4.40 0.10
5.8 30 1541.83333 85% 0.04 4.40 0.16
17.4 30 4625.5 85% 0.11 4.40 0.48
9 30 2392.5 85% 0.06 4.40 0.25
Average
Flow (l/s)
10 hours
per day
Building Potential DU AWC PWC (l/d) Water to SWADD M (Peak Gravity MANHOLE OUTLET
ocupants l/d Sanitary Coeficient) Peak flow
Flow (l/s)
Factor
D3 Visual Art 1518 9.8 30 1725.13 85% 0.04 4.60 0.19 MHB-W-30 OUTLET-FW-D3-05
Academy
44 30 7745.50 85% 0.18 4.60 0.84 MHB-W-32 OUTLET-FW-D3-06
24.6 30 4330.44 85% 0.10 4.60 0.47 MHB-SE-1 OUTLET-FW-D3-07
21.4 30 3767.13 85% 0.09 4.60 0.41 MHB-SE-3 OUTLET-FW-D3-08
27.9 30 4911.35 85% 0.12 4.60 0.53 OUTLET-LW-D3-08
18.8 30 3309.44 85% 0.08 4.60 0.36 MHB-NE-4 OUTLET-FW-D3-04
26 30 4576.88 85% 0.11 4.60 0.50 OUTLET-LW-D3-04
19.4 30 3415.06 85% 0.08 4.60 0.37 MHB-NE-2 OUTLET-FW-D3-03
24.6 30 4330.44 85% 0.10 4.60 0.47 MHB-NE-1 OUTLET-FW-D3-02
20.8 30 3661.51 85% 0.09 4.60 0.40 MHB-W-1 OUTLET-FW-D3-01
21.4 30 3767.13 85% 0.09 4.60 0.41 OUTLET-LW-D3-01
TOTAL 4.95
Average
Flow
(l/s)
10
hours
per day
Building Potential DU AWC PWC (l/d) Water to SWADD M (Peak Gravity MANHOLE OUTLET
ocupants l/d Sanitary Coeficient) Peak flow
Flow (l/s)
Factor
D2 Performance 1287 59 30 11424.22 85% 0.27 4.75 1.28 MHB-SE-5 OUTLET-FW-D2-04
Art Academy
22 30 4259.88 85% 0.10 4.75 0.48 MHB-SE-7 OUTLET-FW-D2-05
11.6 30 2246.12 85% 0.05 4.75 0.25 MHB-SE-8 OUTLET-FW-D2-06
-- 85% 0.00 4.75 0.00 MHB-SE-12 OUTLET-FW-P4-03
-- 85% 0.00 4.75 0.00 MHB-SE-10 OUTLET-FW-P4-02
11.6 30 2246.12 85% 0.05 4.75 0.25 MHB-NE-9 OUTLET-FW-D2-03
42 30 8132.50 85% 0.19 4.75 0.91 MHB-NE-8 OUTLET-FW-D2-02
53.2 30 10301.16 85% 0.24 4.75 1.16 MHB-NE-6 OUTLET-FW-D2-01
TOTAL 4.33
Run B-W collects sanitary water from buildings D1, D6 and D5.
The flow rate of 7.21 l/s corresponds to the gravity flow value. The buildings have several
pumps for intermittent use. The flow rates are as follows:
D1 OUTLET- 5
MHB-W-24 FW-D1-01
D1 OUTLET-
MHB-W-26 FW-P4-01 5
D1 OUTLET-
MHB-W-28 FW-D1-02 5
MHB-W-3
OUTLET-
D6 5
FW-D6-05
MHB-W-5
OUTLET-
D6 5
FW-D6-04
MHB-W-9 OUTLET-
D6 5
FW-D6-02
MHB-W-11
OUTLET-
D6 5
FW-D6-01
D3 OUTLET- 1.6
MHB-W-30 FW-D3-05
D3 OUTLET- 9.34
MHB-W-32 FW-D3-06
For the calculation of the network, the flow rate of the highest flow pump per building has
been considered together with the gravity flow rate.
The following table shows the calculation of the run B-W showing the correct functioning of
the network.
The flow rate of 4.02 l/s corresponds to the gravity flow value. The buildings have several
pumps for intermittent use. The flow rates are as follows:
D2 MHB-NE-8 OUTLET-FW-D2-02 5
OUTLET-FW-D3-04 5
D3 MHB-NE-4 6.12
OUTLET-LW-D3-04
D3 MHB-NE-2 OUTLET-FW-D3-03 5
For the calculation of the network, the flow rate of the highest flow pump per building has
been considered together with the gravity flow rate.
The following table shows the calculation of the run B-NE showing the correct functioning of
the network.
2 83 (25) MHB-NE-18 MHB-NE-12 36.55 1.8400 100.000 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
3 F111 MHB-NE-8 MHB-NE-10 28.20 1.0000 150.000 0.0090 0.5000 0.5000 0.910 0.62 13% 0.02 Calculated
4 F126 MHB-NE-12 Out-1F126 63.55 0.5000 200.000 0.0090 0.5000 0.5000 19.220 1.10 55% 0.11 Calculated
5 F15 MHB-NE-1 MHB-NE-2 35.17 0.5000 200.000 0.0090 0.5000 0.5000 15.670 1.05 50% 0.10 Calculated
6 F16 MHB-NE-2 MHB-NE-3 45.83 0.5000 200.000 0.0090 0.5000 0.5000 16.040 1.05 50% 0.10 Calculated
7 F17 MHB-NE-3 MHB-NE-5 13.80 0.5000 200.000 0.0090 0.5000 0.5000 16.040 1.05 50% 0.10 Calculated
8 F18 MHB-NE-7 MHB-NE-10 73.33 0.5000 200.000 0.0090 0.5000 0.5000 18.060 1.08 55% 0.11 Calculated
9 F63 MHB-NE-5 MHB-NE-7 30.60 0.5000 200.000 0.0090 0.5000 0.5000 16.900 0.93 55% 0.11 Calculated
10 F65 MHB-NE-10 MHB-NE-11 25.41 0.5000 200.000 0.0090 0.5000 0.5000 19.220 1.10 55% 0.11 Calculated
11 F66 MHB-NE-4 MHB-NE-5 22.80 1.0000 150.000 0.0090 0.5000 0.5000 0.860 0.48 13% 0.02 Calculated
12 F68 MHB-NE-6 MHB-NE-7 22.81 1.0000 150.000 0.0090 0.5000 0.5000 1.160 0.66 13% 0.02 Calculated
13 F69 MHB-NE-9 MHB-NE-10 22.62 1.0000 150.000 0.0090 0.5000 0.5000 0.250 0.42 7% 0.01 Calculated
14 F70 MHB-NE-11 MHB-NE-12 55.86 0.5000 200.000 0.0090 0.5000 0.5000 19.220 1.10 55% 0.11 Calculated
The flow rate of 3.43 l/s corresponds to the gravity flow value. The buildings have several
pumps for intermittent use. The flow rates are as follows:
D3 7.18
MHB-SE-1 OUTLET-FW-D3-07
4.63
D3 OUTLET-FW-D3-08
6.34
MHB-SE-3 OUTLET-LW-D3-08
D2
MHB-SE-5 OUTLET-FW-D2-04 5
D2
MHB-SE-7 OUTLET-FW-D2-05 5
D2
MHB-SE-12 OUTLET-FW-P4-03 5.85
D2
MHB-SE-10 OUTLET-FW-P4-02 1.6
For the calculation of the network, the flow rate of the highest flow pump per building has
been considered together with the gravity flow rate.
The following table shows the calculation of the run B-SE showing the correct functioning of
the network.
2 F104 MHB-SE-3 MHB-SE-4 26.50 1.0000 150.000 0.0090 0.5000 0.5000 0.940 0.62 13% 0.02 Calculated
3 F105 MHB-SE-2 MHB-SE-4 29.84 1.0000 150.000 0.0090 0.5000 0.5000 7.650 1.13 40% 0.06 Calculated
4 F106 MHB-SE-4 MHB-SE-6 32.50 1.0000 150.000 0.0090 0.5000 0.5000 8.590 1.17 47% 0.07 Calculated
5 F107 MHB-SE-6 MHB-SE-9 67.64 1.0000 150.000 0.0090 0.5000 0.5000 9.870 1.21 47% 0.07 Calculated
6 F121 MHB-SE-16 Out-1F121 13.96 0.9700 150.000 0.0090 0.5000 0.5000 16.450 1.34 67% 0.10 Calculated
7 F122 MHB-SE-15 MHB-SE-16 52.80 1.0000 150.000 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
8 F25 MHB-SE-14 MHB-SE-16 84.55 1.0000 100.000 0.0090 0.5000 0.5000 16.450 1.36 67% 0.10 Calculated
9 F26 MHB-SE-13 MHB-SE-14 75.46 0.6800 150.000 0.0090 0.5000 0.5000 5.850 0.91 40% 0.06 Calculated
10 F28 MHB-SE-1 MHB-SE-2 35.90 1.0000 150.000 0.0090 0.5000 0.5000 7.650 1.13 40% 0.06 Calculated
11 F77 MHB-SE-9 MHB-SE-14 24.74 1.0000 150.000 0.0090 0.5000 0.5000 10.600 1.23 47% 0.07 Calculated
12 F78 MHB-SE-8 MHB-SE-9 27.67 1.0000 150.000 0.0090 0.5000 0.5000 0.250 0.42 7% 0.01 Calculated
13 F79 MHB-SE-11 MHB-SE-13 17.51 0.7100 150.000 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
14 F80 MHB-SE-7 MHB-SE-9 27.16 1.0000 150.000 0.0090 0.5000 0.5000 0.480 0.49 13% 0.02 Calculated
15 F82 MHB-SE-12 MHB-SE-13 10.03 0.9100 150.000 0.0090 0.5000 0.5000 6.680 0.99 40% 0.06 Calculated