KING ABDULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGY

FACILITIES MANAGEMENT
HARBOR BUILDINGS RECTIFICATION PROJECT
S. A. BAYTUR INSPECTION CHECKLIST
S.A. BAYTUR QA/QC DIVISION - 20-02-18 - REV.00
PROJECT TITLE Contract Number CONTRACTOR / SUBCONTRACTOR

HARBOR BUILDINGS RECTIFICATION PROJECT CW6373 S.A.BAYTUR CONSTRUCTION CO.

LOCATION:
ACTUAL INSPECTION DATE & TIME WORK PERMIT
RFI-PLUMB-
/ / @ YES o NO o

SAB-IC-P-0102: PRESSURE TESTING OF WATER DISTRIBUTION PIPING SYSTEM INSPECTOIN

ITEM
ACCEPTANCE CRITERIA PASS FAIL N/A RE-INSP DATE
No.

A General

Water supply piping shall be hydro tested after installation is approved.


A1
Approved installation RFI shall be attached.
Gauges used for testing are calibrated & pressure test shall be as per below
sketch procedure.

A2

A3 Pressure gauges are installed at end of line to read pressure.

The entire system in each apartment shall be tested to 10.35 Bar (150 psig)
A4
and checked for completely functional operational and water distribution.

A5 The branch lines shall be tested at 1-1/2 times the normal working pressure.

This pressure shall be held for at least 2 hours. The water utilized for tests
A6
shall be obtained from a potable source of supply.
Portion completed shall be tested and proved tight under a water pressure not
A7
less than the working pressure of the system.

A8 Open ends of piping shall be capped after pressure test is approved

Page 1 of 2
REMARKS:

REFERENCE DOCUMENTS:
1. International Plumbing Code(IPC), 2006.
2. Construction Specifications Section 15410, 15050.
3. Building Services Piping ASME B31.9.

PERSON RESPONSIBLE FOR COMPLETION OF QUALITY WORK/TEST


NAME DATE SIGNATURE
Work is Complete and Ready for Inspection
SITE ENGINEER

Witnessed Hold
QC INSPECTOR

Witnessed Hold
KAUST HRP Representative

Page 2 of 2