SPECIALIZED INDUSTRIAL SERVICES CO. LTD.

REQUEST FOR QUOTATION

SAUDI ARABIAN OIL COMPANY (SAUDI ARAMCO)

CONTRACT FOR

UR MAINTAIN POTENTIAL PROJECT (URMPP)

SCOPE OF WORK
FOR

CONSTRUCTION OF FIRE STATION BUILDING (CLASS-C) INCL.


SUPPLY & INSTALLATION OF HVAC, E&I WORKS &
COMMUNICATION SYSTEM

REQUIRED FOR
CRPO # 03

PREPARED BY:
SPECIALIZED INDUSTRIAL SERVICES CO. LTD (SISCO).
PO Box # 11584, Jubail Industrial City-31961

Page | 1
SPECIALIZED INDUSTRIAL SERVICES CO. LTD.

VENDOR ACKNOWLEDGEMENT CHECKLIST

Sub.: CONSTRUCTION OF FIRE STATION BUILDING (CLASS-C)


INCL. SUPPLY & INSTALLATION OF HVAC, E&I WORKS &
COMMUNICATION SYSTEM

Binding Note:
By submitting the Quote, the subcontractor confirms that the
Quote is in conformity with the Material Description and
Specification submitted with the Request for Quote, and that
it confirms the following without any Qualification or
Deviation
Vendor has SAUDI ARAMCO Approval.

Quoted Material is SAUDI ARAMCO Approved.

Quotation is as per given scope of work.

There is no deviation in the Material Description and/or Specification provided


with the Quotation Request.
The offer shall meet Aramco's requirements. Any specification, alternate
options, and deviation mentioned in the offer shall not be considered.

Bid Validity – Three (3) Months.

VENDOR Remarks:

Sign: Stamp:
Name: Yazan Adam

Title: Project Manager

Page | 2
SPECIALIZED INDUSTRIAL SERVICES CO. LTD.

BASE PROPOSAL SHEET


• Base proposal shall be provided by keeping Food & Accommodation under subcontractor scope.

S.NO DESCRIPTION UNIT QTY UNIT RATE TOTAL PRICE REMARKS


CONSTRUCTION OF FIRE
1
STATION BUILDING
A ARCHITECTURAL WORKS LOT 1 2,056,506.00 2,056,506.00
B CIVIL WORKS LOT 1 2,504,774.70 2,504,774.70
C PLUMBING WORKS LOT 1 892,944.00 892,944.00
D STRUCTURAL WORKS LOT 1 958,054.50 958,054.50
CONSTRUCTION OF FIRE
2 LOT 1 827,012.00 827,012.00
TRAINING GROUND
SUPPLY & INSTALLATON OF
3 LOT 1 884,358.00 884,358.00
EQUIPMENTS
4 MECHANICAL & PIPING WORKS LOT 1 1,018,077.00 1,018,077.00
5 E&I WORKS LOT 1 778,493.68 778,493.68
SUPPLY & INSTALLATION OF
6 LOT 1 911,952.98 911,952.98
HVAC
7 COMMUNICATION SYSTEM LOT 1 622,731.98 622,731.98
8 ASPHALT WORKS LOT 1 256,604.80 256,604.80

ALTERNATIVE PROPOSAL SHEET


• Below sheet shall be filled as an alternative proposal by keeping Food & Accommodation under
SISCO scope.

S.NO DESCRIPTION UNIT QTY UNIT RATE TOTAL PRICE REMARKS


CONSTRUCTION OF FIRE STATION
1
BUILDING
A ARCHITECTURAL WORKS LOT 1
2,015,375.88 2,015,375.88
B CIVIL WORKS LOT 1
2,454,679.21 2,454,679.21
C PLUMBING WORKS LOT 1
875,085.12 875,085.12
D STRUCTURAL WORKS LOT 1
938,893.41 938,893.41
CONSTRUCTION OF FIRE
2 LOT 1
TRAINING GROUND 810,471.76 810,471.76
SUPPLY & INSTALLATON OF
3 LOT 1
EQUIPMENTS 866,670.84 866,670.84
4 MECHANICAL & PIPING WORKS LOT 1
997,715.46 997,715.46
5 E&I WORKS LOT 1
762,923.81 762,923.81
SUPPLY & INSTALLATION OF
6 LOT 1
HVAC 893,713.92 893,713.92
7 COMMUNICATION SYSTEM LOT 1
610,277.34 610,277.34
8 ASPHALT WORKS LOT 1
251,472.70 251,472.70