Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

FIELD RECORD OF CONCRETE


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date Submittal prepared: Record Reference:

Concreting area:

Poured item:
loading Concrete Air Inspectors
Truck No. Qty (m2) Pour started Pour finished Slump Cube Nos.
started Temp. Temperature signature

Contractors Authorised Signature: Date:

Engineers comments:

Project Manager: Date: Resident Engineer: Date:


1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

METHOD STATEMENT SUBMITTAL


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date Submittal prepared: Submittal Reference: Rev. No.
09.03.09
MSS-01A
Description of works:

Tower Crane - Loads and Reactions on Fixing Angles

Contractor to provide full Method Statement of the works as an attachment to this form.
Location: Basement Category:

Spec. ref.:

B.O.Q. ref.: Purpose:

Expected start date:

Contractors comments:

Contractors Authorised Signature: Date:

Engineers comments:

Status:
Project Manager: Date: Engineer: Date:
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

MATERIAL INSPECTION REQUEST


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date prepared: Request Reference: Rev. No.

1. Details of Material / Equipment:


Material descriptio

Manufacturer:

Model No. Serial No:

Country of origin:

Material Submittal ref. No. Date of approval:

B.O.Q. ref.: Quantity:

Specification ref.

Storage location: Delivery date:

Contractors Authorised Signature: Date:

2.Inspection report

Physical damage?

Details given above correct?

Conform with approved submittal?

Accessories / spare parts included?

Details:

Remarks:

3. Engineer's comments:
The above material has been inspected on site and found at the time of inspection to be :

for incorporation into the permanent works.

The Engineer's approval of this inspection shall not relieve the Contractor of his responsibilities to incorporate in the Works only such
materials that are in conformity with the contract requirements.
Project Manager: Date: Engineer: Date:
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

SITE INSPECTION REQUEST


Contractor: Al Mazrouei Bowyer Building Consultant Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52

Date request prepared: Insp. request referen Rev. No.


27/06/09
IR-P316-E-04
Item to be inspected: Conduits layed for ligting, Power, Emergency lights ,Fire alarm and CCTV

Location: ground Floor slab This inspection requires the following disciplines:

✘ Drawing attached. Architect ✘ Inspector


Spec. ref.: Structural Eng QA/QC
B.O.Q. ref.: Mechanical Engineer Surveyor
Date / time requested: 28/06/09 at 8 a.m ✘ Electrical Engineer …………………………….
Contractors comments:

Contractors Authorised Signature: Date:

Engineers comments:

Architect
Structural Engineer
Mechanical Engineer
✘ Electrical Engineer
Inspector
Surveyor
QA/QC
………………...
Resident Engineers comments:

Status:

Approved Approved with comments Not Approved revise and resubmit Rejected as comments

Project Manager: Date: Engineer: Date:


…………….

omments
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

SITE INSPECTION REQUEST


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52

Date request prepared: Insp. request reference: Rev. No.


15/03/2009
IR/P316/E 01
Item to be inspected: Conduit in raft

Location: This inspection requires the following disciplines:

✘ Drawing attached. Architect ✘ Inspector


Spec. ref.: Structural Eng QA/QC

B.O.Q. ref.: Mechanical Engineer Surveyor

Date / time requested: ✘ Electrical Engineer …………………………….

Contractors comments:

Contractors Authorised Signature: Date:

Engineers comments:

Architect
Structural Engineer
Mechanical Engineer
Electrical Engineer
Inspector
Surveyor
QA/QC
………………...
Resident Engineers comments:

Status:

Approved Approved with comments Not Approved revise and resubmit Rejected as comments

692311225.xls 09/19/2023
Project Manager: Date: Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

SHOP DRAWING SUBMITTAL


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date Submittal prepared: Submittal Reference: Rev. No.
10.02.09
SDS-01
Drawing title: Dewatering well points Drawing No: A/J326/01

Manufacturer: Supplier

Address: Address:

Location: Basement Category:


Architectural Mechanical Builders Work
Spec. ref.:
Structural Electrical As Built
B.O.Q. ref.: Purpose:

Date Material required on site: Approval Record Other

Contractors comments:

Contractors Authorised Signature: Date:

Engineers comments:

Emp.

Archt.

S.Eng.

M.Eng.

E.Eng

I.Des.

Status:

Approved Approved with comments Not Approved revise and resubmit Rejected as comments

Project Manager: Date: Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

Sub-Contractor Nomination
Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
P.O. Box 51445 Consultant Architects & Engineers
Dubai P.O. Box 3670, Dubai, UAE.
United Arab Emirates
Sub-Contractor
Planned Planned Required on
Nomination Category Sub-Contractors Name Actual Submittal date Actual Submittal date STATUS
sumittal date approval date site
Reference
0 1 2 3 0 1 2 3

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 14 of 38


Comments

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 15 of 38


1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

SUBCONTRACTOR APPROVAL REQUEST


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Date Submittal prepared: Submittal Reference: Rev. No.
31.01.09 J326_SCAR-05

Description of works be subcontracted: Waterproofing

(Al Shirawi Cont. Co.)

Location: Substructure and Wet Area Spec. ref.:

Expected start date: B.O.Q. ref.:

Dear Sir,
Please find attached supporting documents in respect to our proposed subcontractor for
the above works.
1. Name and classification. ✘

2. Details of recent performance. ✘

3. Type, number and current location of plant/equipment to be deployed on the project. ✘

4. Full list of names, qualifications and experience of staff proposed for this project. ✘

5. Outline method statement of proposed work and performance. ✘

6. Written confirmation that the proposed subcontractor will act and comply, in full conformity ✘

with the contract and the main contractor's construction programme.


7. Certificates and Licenses from all relevant Authorities. ✘

Contractors comments:

Al Shirawi Cont. Co. will comply with the contract

Contractors Authorised Signature: Date:

Engineers comments:

Emp.

Archt.

S.Eng.

M.Eng.

E.Eng

Status: I.Des.

Approved Approved with comments Not Approved revise and resubmit Rejected as comments

Project Manager: Date: Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

Sub-Contractor Approval
Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
P.O. Box 51445 Consultant Architects & Engineers
Dubai P.O. Box 3670, Dubai, UAE.
United Arab Emirates
Sub-Contractor
Planned Planned Required on
Submittal Category Sub-Contractors Name Actual Submittal date Actual Submittal date STATUS
sumittal date approval date site
reference
0 1 2 3 0 1 2 3

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 17 of 38


Comments

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 18 of 38


1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

Sub-Contractor Drawings Approval


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
P.O. Box 51445 Consultant Architects & Engineers
Dubai P.O. Box 3670, Dubai, UAE.
United Arab Emirates
Planned Planned Required on
Drawing Number Category Drawing Title Actual Submittal date Actual Submittal date STATUS
sumittal date approval date site

0 1 2 3 0 1 2 3

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 19 of 38


Comments

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 20 of 38


1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

TEST REPORT SUBMITTAL


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date Submittal prepared: Submittal Reference: Rev. No.
23.02.09
TRS-01
Please find attached the following Test Reports for approval:

Ref: Description / Item Status

SR/0901004 PLATE LOAD TEST - BELOW RAFT SLAB SATISFACTORY

SR/0902034.Rev02 DM CONFIRMATION LETTER FOR PLATE LOAD TEST SATISFACTORY

Contractors Authorised Signature: Date:

Engineers comments:

Emp.

Archt.

S.Eng.

M.Eng.

E.Eng

I.Des.

Project Manager: Date: Resident Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

REQUEST FOR INFORMATION


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date request prepared: Request Reference: Rev. No.
05.02.09
RFI-01
We request clarification of the following:

REF. 3RD BASEMENT PLAN AIRCONDITIONING LAYOUT C001 REV. - CO DATED 13.01.2009 ISSUED FOR CONSTRUCTION

REF. 2ND BASEMENT PLAN AIRCONDITIONING LAYOUT C002 REV. - CO DATED 13.01.2009 ISSUED FOR CONSTRUCTION

REF. 1ST BASEMENT PLAN AIRCONDITIONING LAYOUT C003 REV. - CO DATED 13.01.2009 ISSUED FOR CONSTRUCTION

REF. GROUND FLOOR PLAN AIRCONDITIONING LAYOUT C004 REV. - CO DATED 13.01.2009 ISSUED FOR CONSTRUCTION

KINDLY CLARIFY THE FRESH AIR SUPPLY (FRESH AIR FAN) FOR THE BASEMENT VENTILATION SYSTEM TO ALLOW US PROCEED

THE WORK AHEAD

Contractors Authorised Signature: Date:

Engineers comments:

Emp.

Archt.

S.Eng.

M.Eng.

E.Eng

I.Des.

This clarification does not constitute a variation to the Contract Sum or Contract Period.
Project Manager: Date: Resident Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

REQUEST TO REMOVE EQUIPMENT OR MATERIAL OFF SITE


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date Submittal prepared: Submittal Reference: Rev. No.

We request permission to remove the following materials / equipment from site:

Ref: Description / Item Reason

Contractors Authorised Signature: Date:

Engineers comments:

Project Manager: Date: Resident Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

MATERIAL SUBMITTAL
Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date Submittal prepared: Submittal Reference: Rev. No.
10.02.09
J326_MS-07
Material description: EMACO R303 Catalouge ref:

Manufacturer: BASF Construction Chemicals UAE LLC Supplier BASF Construction Chemicals UAE LLC

Address: PO Box 37127, Dubai Address: PO Box 75370, Dubai


Tel 04 8090800 Fax04 885 1002 Tel: 04 324 5282 Fax: 04 324 5292
Location: Substructure Production Period: Weeks

Spec. ref.: Delivery Ex-works: Weeks

B.O.Q. ref.: Total Delivery time: Weeks

Date Material required on site: Expected date of delivery to site:

Delvery method:

Overland Sea Freight Air Freight Other

Contractors comments:

If Alternative Material submitted, attach full comparison to that specified.


Attachments/enclosures:
Catalogues Drawings Samples Other

Contractors Authorised Signature: Date:

Engineers comments:

Emp.

Archt.

S.Eng.

M.Eng.

E.Eng

I.Des.

Status:

Approved Approved with comments Not Approved revise and resubmit Rejected as comments

Project Manager: Date: Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

CONTRACTORS DAILY SITE REPORT PAGE 1

Date: 11.03.09
Contracto Al Mazrouei Bowyer Building ConsultaArif& Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address P.O. Box 3670
United Arab Emirates Dubai, UAE.
A. Weather conditions:
Max. Temp. Max. Rh
Rain Dusty ✘ Sunny Cloudy
Min. Temp Min.Rh.
B. MAN POWER (Main Contractor)

PM. ENG. FOR. Clerk Ch. Hand SF Mason Carp Helper Scaff. O/Boy Watch M Operator TOTAL
1 1 1 1 1 46 1 3 16 2 1 1 75

C. MAN POWER (Sub-Contractor)

Ref. Sub Contractor ENG. FOR. Fitter Op Ch. Hand Labour Total
1 MEP
2 Al Shirawi 5 5
3 Saleh Construction

Total Labour (B+C) 80


D. EQUIPMENT

Ref. Item Qty Ref. Item Qty


1 Loader / Shovel 9 Welding Equipment
2 Bar bending machine 1 10 Air Compressor
3 Bar cutter 1 11 Generator 2
4 Concrete vibrator 12 Tower crane
5 Carpentry machine 1 13 Hoist 1
6 Power Float 14 Excavator
7 Pick-up truck 1 15 Jack Hammer
8 Water cooler 1 16 Bobcat

E. MATERIAL DELIVERED TO SITE

Ref. Material description. MIR. No. Unit Qty

Contractors Authorised Signature: Date:


Project Manager: Date: Resident Engineer: Date:

1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

CONTRACTORS DAILY SITE REPORT PAGE 2

Contracto Al Mazrouei Bowyer Building ConsultaArif& Bintoak


Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address P.O. Box 3670
United Arab Emirates Dubai, UAE.
Record Reference:
Date: 11.03.09

F. WORK EXECUTED

Item Description of work Location Qty

Contractors Authorised Signature: Date:


Project Manager: Date: Resident Engineer: Date:

1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

CONTRACTORS DAILY SITE REPORT PAGE 3

Contracto Al Mazrouei Bowyer Building ConsultaArif& Bintoak


Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address P.O. Box 3670
United Arab Emirates Dubai, UAE.
Date: Record Reference:

G. WORK TO BE EXECUTED THE FOLLOWING DAY

Item Description of work Location Qty


1
2
3
Contractors Authorised Signature: Date:

Project Manager: Date: Resident Engineer: Date:


1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

CONTRACTORS DAILY SITE REPORT PAGE 1

Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak


Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
A. Weather conditions:
Max. Temp. Max. Rh
Rain Dusty ✘ Sunny Cloudy
Min. Temp Min.Rh.
B. MAN POWER (Main Contractor)
PM. ENG. FOR. SF MAS SURV C.MAN DRIVER LABOUR TOTAL
1 1

C. MAN POWER (Sub-Contractor)


Ref. Sub Contractor ENG. FOR. Total

Total Labour (B+C) 0

D. EQUIPMENT
Ref. Item Qty Ref. Item Qty
1 Loader / Shovel 9 Welding Equipment
2 Roller 10 Air Compressor
3 Dumper 11 Generator
4 Cocrete vibrato 12 Tower crane
5 Carpentry machine 13 Mobile crane
6 Power Float 14
7 Pick-up truck 15
8 Water cooler 16

E. MATERIAL DELIVERED TO SITE


Ref. Material description. MIR. No. Unit Qty

Contractors Authorised Signature: Date:

Project Manager: Date: Resident Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

CONTRACTORS DAILY SITE REPORT PAGE 2

Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak


Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Date: Record Reference:

F. WORK EXECUTED
Item Description of work Location Qty

Contractors Authorised Signature: Date:

Project Manager: Date: Resident Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

CONTRACTORS DAILY SITE REPORT PAGE 3

Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak


Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Date: Record Reference:

G. WORK TO BE EXECUTED THE FOLLOWING DAY


Item Description of work Location Qty
1
2
3

Contractors Authorised Signature: Date:

Project Manager: Date: Resident Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

CONFIRMATION OF VERBAL INSTRUCTION


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-Contractor
Address: Tel:337 28 88 Fax:337 03 52
Date CVI prepared: CVI Reference:

Instruction By:

To: The Resident Engineer

We confirm that we have received the following verbal instruction(s):

Project Managers Signature Date:

Engineers comments (if required)

Emp.

Archt.
S.Eng.

M.Eng.

E.Eng

I.Des.

Project Manager: Date: Resident Engineer: Date:

692311225.xls 09/19/2023
1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

TECHNICAL SUBMITTAL
Contractor: Al Mazroie Bowyer Building Consultant: Arif & Bintoak
Address: P.O. Box 51445 Consultant Architects & Engineers
Dubai Address: P.O. Box 3670
United Arab Emirates Dubai, UAE.
Sub-ContracAMBB MEP
Address: Tel:337 28 88 Fax:337 03 52

Date Submittal prepared: Submittal Reference: Rev. No.


04.03.09
J326_TS/02
Description of Submittal:
Inssurance - Contractors All Risks including Third Party Liability

Location: Category:
Spec. ref.:
B.O.Q. ref.: Purpose:
Expected start date:
Contractors comments:

Contractors Authorised Signature: Date:

Engineers comments:

Status:

Project Manager: Date: Engineer: Date:


1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

MATERIAL SUBMITTAL REGISTER


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
P.O. Box 51445 Consultant Architects & Engineers
Dubai P.O. Box 3670, Dubai, UAE.
United Arab Emirates
Material
Planned Planned Required on
Submittal Category Item description Actual Submittal date Actual Submittal date STATUS
sumittal date approval date site
reference
0 1 2 3 0 1 2 3

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 35 of 38


1399
Commercial & Office Building on Plot No. 373-1343 at Al Barsha First Dubai

MATERIAL SUBMITTAL REGISTER


Contractor: Al Mazrouei Bowyer Building Consultant: Arif & Bintoak
P.O. Box 51445 Consultant Architects & Engineers
Dubai P.O. Box 3670, Dubai, UAE.
United Arab Emirates

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 36 of 38


Comments

692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 37 of 38


692311225.xls 09/19/2023 09/19/2023 09:31:54 Page 38 of 38

You might also like