Hasil Pengukuran Arus (I) SNT GW - Cikarang

Panel UPS A
No MCCB Measurement Inst No
Phase R Phase S Phase T
1 Q0 12.7 A 10. 3 A 12.3 A 1
2 Q1 12.2 A 13.1 A 12.9 A 2
3 Q3 12.2 A 14.3 A 6.6 A Fluke Remote 3
Display Clamp
4 Q2-1 0.4 A 0.7 A 5.2 A Meter 381 4
5 Q2-2 1.3 A 1.5 A 0.6 A 5
6 Q2-3 11.6 A 12.5 A 2.2 A 6

Testing : 6 December 2022


Tester : Pak Rumanto, Pak Sidiq, Dadang
Panel UPS B
MCCB Measurement Inst
Phase R Phase S Phase T
Q0 10.6 A 10.7 A 10.3 A
Q1 12.7 A 10.3 A 10.3 A
Q3 8.6 A 7.2 A 15.8 A Fluke Remote
Display Clamp
Q2-1 6.5 A 1.4 A 1.2 A Meter 381
Q2-2 0.3 A 0.7 A 2.8 A
Q2-3 2.1 A 5.5 A 12.4 A