Professional Documents
Culture Documents
V2R04
V2R04
Base Document
Demolition Works
Current Version Version 02 – September 2009 (10 September 2009)
Revision Revision 03 – April 2010 (15 April 2010)
C Articles and Conditions of C/8 Replace “Damage to the Property:” to “Damage to Third Party
Contract Property”.
Clause 11 – Damage to
Third Party Property
D.1 Preliminaries and General D.1/18 Item reference moved from paragraph 3 to paragraph 2.
CONTRACTOR-
PROCURED
INSURANCE