Professional Documents
Culture Documents
C1000 Touch 2ndservice
C1000 Touch 2ndservice
Power Line Requirements Line Voltage Check: Record AC line voltage Pass Fail
Pass Fail
C1000-Touch Chassis S/N
Pass Fail
Alpha Reaction Block S/N
Diagnostic test
Pass Fail
The above referenced instrument has been installed and meets all Installation requirements. Comments:
11-2