Professional Documents
Culture Documents
Public Prosecution
Public Prosecution
Public Prosecution
PROPOSED 3D VISUAL VIEW FOR CUSTOMER COUNTER DESK: (DWG. NO.: AR-010)
PROPOSED FLOORING TILES LAYOUT AT GROUND FLOOR: (DWG. NO.: AR-013)
P52: REMOVE CAREFULLY EXISTING FLOORING TILES AND SKIRTING.
P53: SUPPLY & FIX NEW SKIRTING 300MM HIGH GRANITE.
P54: SUPPLY & FIX INTERNAL 1200X1200 MM NEW MARBLE TILES SEMI-GLOSSY
POLISHED WITH BORDER AND PATTERN.
P55: SUPPLY &FIX EXTERNAL 1200X1200 MM NEW GRANITE TILES RAFF FINISH WITH
PATTERN.
P56: PROVIDE MOCKUP SAMPLE FOR THE NEW FLOORING FOR CLIENT APPROVAL.
NEW PARTITION:
F38: SUPPLY AND FIX NEW GYPSUM BOARD PARTITIONS (12.7MMTHICK), WITH
ACOUSTICALLY ENHANCED SOUND PROOFING GYPSUM.
U10: PREPARE NEW GYPSUM BOARD PARTITIONS SURFACE AND APPLY 1 COAT PRIMER
AND 2 COATS EMULSION PAINT.
F40: PROVIDE NEW DOOR OPENING INTO NEW GYPSUM BOARD PARTITION.
G01A: SUPPLY AND FIX NEW DOOR FRAME FOR SINGLE DOOR OF SIZE 50MM X 100MM
WITHOUT TRANSOM.
G14A: SUPPLY AND FIX NEW 45MM THICK SOLID TIMBER OPENABLE DOUBLE LEAF
PANEL DOOR.