Professional Documents
Culture Documents
Allwin Engineering Industries Test Report
Allwin Engineering Industries Test Report
V FURNACE
M/S: ALLWIN ENGINEERING INDUSTRIES
Insulation resistance test at 1KV FOR 1 minute
For the batter protection of the L.V Furnace you can use L.V Overcurrent relays on each phase
of power supply by using protection C.T.
Thanks with Regard
BARKAT ALI