TEST REPORT OF L.

V FURNACE
M/S: ALLWIN ENGINEERING INDUSTRIES
Insulation resistance test at 1KV FOR 1 minute

Sr.no Description Measured value Time Status


1 R-phase to ground 1GΩ to ∞ 60s OK
2 Y-phase to ground 1GΩ to ∞ 60s OK
3 B-phase to ground 1GΩ to ∞ 60s OK
L.V Furnace Coil resistance Value at 28℃
Sr.no Description Measured value Time Status
1 Red Phase Coil 7.41Ω 60s OK
2 Yellow Phase Coil 7.42Ω 60s OK
3 Blue Phase Coil 7.42Ω 60s OK
Physical inspection of Furnace power control Circuit:

Equipment name Physical Condition Working Condition


3 pole 250A Input Breaker Healthy Fine
Thyristor control 150A AC supply Healthy Fine
Magnetic Contactor Healthy Fine
All Equipment of the L.V Furnace working fine and healthy in condition so you can turn ON
power of your L.V Furnace.
Recommendation:

For the batter protection of the L.V Furnace you can use L.V Overcurrent relays on each phase
of power supply by using protection C.T.
Thanks with Regard

For TRAFO ENGINEERING

BARKAT ALI