Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

16/3/2020 Recommended Practices

Published Recommended Practices


ID TITLE REV. DATE
10S-90 Cost Engineering Terminology 2019/10/10
Free to the general public: [HTML] - [PDF]
11R-88 Required Skills and Knowledge of Cost Engineering 2013/06/18
[Look Inside]
13S-90 Recommended Method for Determining Building Area 1990/11/01
[Look Inside]

14R-90 Responsibility and Required Skills for a Project Planning and 2006/09/19
Scheduling Professional
[Look Inside]
15R-81 Profitability Methods 2008/07/16
[Look Inside]
16R-90 Conducting Technical and Economic Evaluations – As Applied for the 1991/04/01
Process and Utility Industries
[Look Inside]

17R-97 Cost Estimate Classification System 2019/03/06


[Look Inside]

18R-97 Cost Estimate Classification System – As Applied in Engineering, 2019/03/06


Procurement, and Construction for the Process Industries
[Look Inside]

19R-97 Estimate Preparation Costs in the Process Industries 1998/06/19


[Look Inside]
20R-98 Project Code of Accounts 2003/01/27
[Look Inside]
21R-98 Project Code of Accounts – As Applied in Engineering, Procurement, 2003/01/27
and Construction for the Process Industries
[Look Inside]
22R-01 Direct Labor Productivity Measurement - As Applied in Construction 2004/04/26
and Major Maintenance Projects
[Look Inside]
23R-02 Identification of Activities 2007/05/03
[Look Inside]

24R-03 Developing Activity Logic 2004/03/26


[Look Inside]

25R-03 Estimating Lost Labor Productivity in Construction Claims 2004/04/13


[Look Inside]
27R-03 Schedule Classification System 2010/11/12
Look Inside]

28R-03 Developing Location Factors by Factoring – As Applied in 2006/10/19


Architecture, Engineering, Procurement, and Construction
[Look Inside]

29R-03 Forensic Schedule Analysis 2011/04/25


[Look Inside]

30R-03 Implementing Project Constructability 2009/05/20


[Look Inside]
31R-03 Reviewing, Validating, and Documenting the Estimate 2009/05/12
[Look Inside]
32R-04 Determining Activity Durations 2012/01/14
[Look Inside]

33R-15 Developing the Project Work Breakdown Structure 2016/03/01


[Look Inside]
34R-05 Basis of Estimate 2014/05/02
[Look Inside]
35R-09 Development of Cost Estimate Plans – As Applied for the Building 2015/02/14
and General Construction Industries
[Look Inside]
36R-08 Development of Cost Estimate Plans – As Applied in Engineering, 2019/10/10
Procurement, and Construction for the Process Industries
[Look Inside]

https://www.aacei.org/resources/publications/recommended-practices 1/4
16/3/2020 Recommended Practices
37R-06 Schedule Levels of Detail—As Applied in Engineering, Procurement, 2010/03/20
and Construction
[Look Inside]
38R-06 Documenting the Schedule Basis 2009/06/18
[Look Inside]
39R-06 Project Planning – As Applied in Engineering and Construction for 2011/12/08
Capital Projects
[Look Inside]
40R-08 Contingency Estimating – General Principles 2008/06/25
[Look Inside]

41R-08 Risk Analysis and Contingency Determination Using Range 2008/10/27


Estimating
[Look Inside]

42R-08 Risk Analysis and Contingency Determination Using Parametric 2011/05/26


Estimating
[Look Inside]

43R-08 Risk Analysis and Contingency Determination Using Parametric 2011/12/28


Estimating – Example Models as Applied for the Process Industries
[Look Inside]

44R-08 Risk Analysis and Contingency Determination Using Expected Value 2012/12/04
[Look Inside]
45R-08 Scheduling Claims Protection Methods 2009/06/01
[Look Inside]
46R-11 Required Skills and Knowledge of Project Cost Estimating 2013/01/16
[Look Inside]

47R-11 Cost Estimate Classification System – As Applied in Engineering, 2019/07/25


Procurement, and Construction for the Mining and Mineral Processing
Industries
[Look Inside]
48R-06 Schedule Constructability Review 2009/08/28
[Look Inside]

49R-06 Identifying the Critical Path 2010/03/05


[Look Inside]
50R-16 Trending and Forecasting of CPM Schedules 2019/02/27
[Look Inside]
52R-06 Prospective Time Impact Analysis – As Applied in Construction 2017/05/04
[Look Inside]

53R-06 Schedule Update Review – As Applied In Engineering, Procurement 2008/08/14


and Construction
[Look Inside]

54R-07 Recovery Scheduling—As Applied in Engineering, Procurement, and 2010/11/19


Construction
[Look Inside]

55R-09 Analyzing S-Curves 2010/11/10


[Look Inside]
56R-08 Cost Estimate Classification System – As Applied in Engineering, 2019/03/06
Procurement, and Construction for the Building and General
Construction Industries
[Look Inside]

57R-09 Integrated Cost and Schedule Risk Analysis Using Risk Drivers and 2019/07/09
Monte Carlo Simulation of a CPM Model
[Look Inside]

58R-10 Escalation Estimating Principles and Methods Using Indices 2011/05/25


[Look Inside]
59R-10 Development of Factored Cost Estimates – As Applied in 2011/06/18
Engineering, Procurement, and Construction for the Process
Industries
[Look Inside]
60R-10 Developing the Project Controls Plan 2011/12/21
[Look Inside]
61R-10 Schedule Design – As Applied in Engineering, Procurement, and 2013/10/11
Construction

https://www.aacei.org/resources/publications/recommended-practices 2/4
16/3/2020 Recommended Practices
[Look Inside]
62R-11 Risk Assessment: Identification and Qualitative Analysis 2012/05/11
[Look Inside]
63R-11 Risk Treatment 2012/08/23
[Look Inside]
64R-11 CPM Schedule Risk Modeling and Analysis: Special Considerations 2012/05/02
[Look Inside]
65R-11 Integrated Cost and Schedule Risk Analysis and Contingency 2012/05/02
Determination Using Expected Value
[Look Inside]
66R-11 Selecting Probability Distribution Functions for use in Cost and 2012/08/24
Schedule Risk Simulation Models
[Look Inside]
67R-11 Contract Risk Allocation – As Applied in Engineering, Procurement, 2014/01/14
and Construction
[Look Inside]
68R-11 Escalation Estimating Using Indices and Monte Carlo Simulation 2012/05/02
[Look Inside]

69R-12 Cost Estimate Classification System – As Applied in Engineering, 2019/07/26


Procurement, and Construction for the Hydropower Industries
[Look Inside]
70R-12 Principles of Schedule Contingency Management – As Applied in 2013/10/16
Engineering, Procurement and Construction
[Look Inside]

71R-12 Required Skills and Knowledge of Decision and Risk Management 2013/06/17
[Look Inside]
72R-12 Developing a Project Risk Management Plan 2013/04/25
[Look Inside]
73R-13 Establishing Labor Productivity Norms 2014/01/14
[Look Inside]

74R-13 Basis of Estimate - As Applied for the Software Services Industries 2014/04/02
[Look Inside]
75R-13 Schedule and Cost Reserves within the Framework of ANSI EIA-748 2014/10/24
[Look Inside]
77R-15 Quality Control/Quality Assurance for Risk Management 2016/06/03
[Look Inside]

78R-13 Original Baseline Schedule Review - As Applied in Engineering, 2014/10/23


Procurement, and Construction
[Look Inside]
79R-13 Level of Effort Planning and Execution on Earned Value Projects - 2014/10/24
Within the Framework of ANSI EIA-748
[Look Inside]

80R-13 Estimate at Completion (EAC) 2019/12/03


[Look Inside]
81R-13 Required Skills and Knowledge of Earned Value Management 2014/05/01
[Look Inside]
82R-13 Earned Value Management (EVM) Overview and Recommended 2017/05/04
Practices Consistent with EIA-748-C
[Look Inside]
83R-13 Organizational Breakdown Structure and Responsibility Assignment 2014/05/01
Matrix
[Look Inside]
84R-13 Planning and Accounting for Adverse Weather 2015/09/15
[Look Inside]

85R-14 Use of Decision Trees in Decision Making 2014/11/14


[Look Inside]
86R-14 Variance Analysis and Reporting 2015/10/19
[Look Inside]
87R-14 Cost Estimate Classification System – As Applied in Engineering, 2019/07/31
Procurement, and Construction for the Petroleum Exploration and
Production Industries
[Look Inside]
88R-15 Tracking the Procurement Process using a CPM Schedule – As 2016/12/28

https://www.aacei.org/resources/publications/recommended-practices 3/4
16/3/2020 Recommended Practices
Applied in Construction
[Look Inside]
89R-16 Management Summary Schedule 2017/10/18
[Look Inside]
90R-17 Statusing the CPM Schedule – As Applied in Construction 2018/03/19
[Look Inside]
91R-16 Schedule Development 2018/03/20
[Look Inside]
92R-17 Analyzing Near-Critical Paths 2017/10/18
[Look Inside]
93R-17 Schedule Logs 2018/04/18
[Look Inside]
94R-18 Cost Control Software Requirements 2019/02/27
[Look Inside]
95R-18 Construction Photography to Document Project Status 2019/02/27
[Look Inside]
96R-18 Cost Estimate Classification System – As Applied in Engineering, 2019/07/31
Procurement, and Construction for the Power Transmission Line
Infrastructure Industries
[Look Inside]
97R-18 Cost Estimate Classification System – As Applied in Engineering, 2019/08/05
Procurement, and Construction for the Pipeline Transportation
Infrastructure Industries
[Look Inside]
98R-18 Cost Estimate Classification System – As Applied in Engineering, 2019/03/26
Procurement, and Construction for the Road and Rail Transportation
Infrastructure Industries
[Look Inside]
100R-19 Contract Change Management – As Applied in Engineering, 2020/02/27
Procurement, and Construction
[Look Inside]

101R-19 Roles and Responsibilities of a Project Cost Estimator 2019/07/10


[Look Inside]
102R-19 Cost Estimate Classification System – As Applied in Engineering, 2019/10/10
Procurement, Construction, and Qualification for the Pharmaceutical
and Related Industries
[Look Inside]

103R-19 Project Code of Accounts – As Applied in the Mining and Mineral 2019/10/10
Processing Industries to Facilitate Benchmarking
[Look Inside]
105R-19 Estimate Requirements Document – As Applied in Engineering, 2019/10/11
Procurement, and Construction for the Process Industries
[Look Inside]

106R-19 Development of Cost Estimate Basis – As Applied in Engineering, 2019/10/14


Procurement, and Construction for the Process Industries
[Look Inside]

107R-19 Cost Estimate Classification System – As Applied in Engineering,


Procurement, and Construction for the Environmental Remediation
Industries
[Look Inside]

https://www.aacei.org/resources/publications/recommended-practices 4/4

You might also like