TRANSPORTADORA ASSOCIADA DE
Customer:
GÁS SA - TAG
GASFOR II - HORIZONTE CAUCAIA
Project:
SECTION
Report No.: RY-IR-TAG0059-22 - OIS-RN-045
Inspector/s: Fabio Vasconcelos
Visit Date/s: 22 to 26/08/2022
Inspection Report Report Date: Page 1of 7

1. Reference Section
Purchase Order: N/A RINA Job ID: TAG002-016
Inspection Notification: OIS-TAG-RN-044 Customer Reference: N/A
Main Vendor: N/A Main Vendor Location: N/A
Manufacturer: N/A Manufacturer Location: ROD.BR-020, KM 406, CAMPO
GRANDE, CAUCAIA/CE
Vendor sub-order No.: N/A
Name of Person Company / Position & Contact Details
Fabio Vasconcelos RINA / TAG
Other key Attendees:

Equipment / Material:
Inspection Activities
Stage/Intermediate Final Dispatch / Shipment
Performed:
Next Visit Date/s:

2. Overall Result of inspections

SATISFACTORY
UNSATISFACTORY
X PENDING ITEMS(S) Comments and recommendations in Item 7.4
PUNCHLIST RAISED PL No.:
NCR RAISED NCR No.:
IRN ISSUED IRN No.:

CUSTOMER ACTION REQUIRED YES NO


If yes, provide details here:

QUALITY FINDINGS(not subject to an NCR being raised, corrected at time of Inspection)

3. Time & Expenses Expenditure

works hours 40 Travel / Hours 35


Expenses km / miles 2,246

1 – fill in all the required fields (date, work and travel hours, distance)
2 – if the report is inclusive of more than one day of visit, please enter a row for each day of visit

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

TRANSPORTADORA ASSOCIADA DE
Customer:
GÁS SA - TAG
GASFOR II - HORIZONTE CAUCAIA
Project:
SECTION
Report No.: RY-IR-TAG0059-22 - OIS-RN-045
Inspector/s: Fabio Vasconcelos
Visit Date/s: 22 to 26/08/2022
Inspection Report Report Date: Page 2of 7

4. Documents Section
Detail all the applied Customer, Vendor docs and International Codes & Standards referenced

Document Number Rev. Title Code Status


PR-4717.11-6521-954-NEE-016 THE APPLICATION OF DENSOLEN COATING - AS50
ITS 8.5.45 0 WORK INSTRUCTION

5. Presented Quantities

PO/Tag Presented Rejected Accepted Qty for


Item Description ordered
Item This Visit This Visit This Visit Release
N/A N/A N/A N/A N/A N/A N/A

6. Details of Inspection & Test instruments Used

Equipment Name Manufacturer Serial No. / ID No. Next Calibration

DIGITAL HYGROMETER THERMO N/A THG - 042 07/02/2024


INFRARED THERMOMETER N/A TUES - 027 07/02/2024
ANALOG RUGOSIMETER N/A RUG - 002 02/11/2024
HOLIDAY DETECTOR N/A HOL - 001 01/06/2024
DYNAMOMETER N/A DIN - 002 07/26/2024

7. Detailed Results of Inspections


Summary table of the inspection activities performed & results

QCP / ITP Step Inspection Activity result


INSPECTION FOCUSED ON QUALITY,
EXECUTION OF THE COATING AND LOWERING
OF PROJECT COLUMNS. Accept reject Pending
GASFOR II – LOCATED ROD. BR – 020, KM 406,
CAMPO GRANDE CAUCAIA / CE.

Detailed results of inspections (QCP/ITP Activity No., Inspection Performed including quality findings)

TECHNICAL VISIT REPORT – WORK – GASFOR II – HORIZONTINA CAUCAIA SECTION.

BETWEEN AUGUST 22 TO AUGUST 26, 2022.


By: Fabio Vasconcelos

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

TRANSPORTADORA ASSOCIADA DE
Customer:
GÁS SA - TAG
GASFOR II - HORIZONTE CAUCAIA
Project:
SECTION
Report No.: RY-IR-TAG0059-22 - OIS-RN-045
Inspector/s: Fabio Vasconcelos
Visit Date/s: 22 to 26/08/2022
Inspection Report Report Date: Page 3of 7

7.1 PURPOSE

Check the execution parameters and quality control of the entire process of the application of Coating - Tape -
DENSOLEN - AS50.

7.2 REFERENCE DOCUMENTS

PROCEDURE: PR - 4717.11 - 6521 -954-NEE-016

WORK INSTRUCTION: ITS 8.5.45

7.3 SCOPE OF ACTIVITIES

- The technical documentation of the PR - 4717.11 - 6521 -954-NEE-016 and ITS 8.5.45 work was analyzed for
compliance with the execution and quality control items in the application of the coating, where a checklist and a
checklist were prepared.

- Audit performed with the field inspector at KM 71 and qualification of coaters in the DENSOLEN Tape process -
AS50 according to flash report records.

- All necessary documentation was provided by the company NORTENG through representatives Cezar Melo and
Alexandre Freire.

- All displacement and logistics support of the work was promoted by the company TRACTEBEL through Messrs.
Sergio Costa and Anderson Amancio da Silva.

7.4 COMMENTS AND RECOMMENDATIONS

- Absence of a pressure pliers adapted for adhesion test, thus allowing displacement of the coating strip by the
extremity in which the distance in millimetres was marked, allowing the execution of the test with accuracy.

- Absence of a calibrated contact thermometer for the substrate, thus meeting item 8.2 of procedure PR - 4717.11 -
6521 -954-NEE-016.

- Absence of MSDS (Material Safety Data Sheet) at the chemical storage location, guiding the hazards and risks
existing in each chemical substance or mixture (as per photo 15)

- Use of laser pyrometer with emissivity set only for coated surface.

- Field sieve unsuitable for grit G-40 grit, used in the field.

- It is recommended to carry out a control of the G-40 shot used in the field, mixing the new one with the shot used
from the previous day, ensuring a standard of cleanliness and roughness within compliance.

- Recommended application of the DENSOLEN – AS50 tape with the DENSOMAT machine, due to the compliance
standard obtained. Using the Manual System only under conditions that make the Mechanical Delivery System
impossible.

- Adequacy in work instruction ITS.8.5.45, for use of the Sa 2 ½ standard in joints that are removed from the old
coating in the field, thus eliminating all old paint or coating, corrosion products, oils, greases, dust and other
contaminants such as item 8.3 of procedure PR - 4717.11 - 6521 -954-NEE-016.

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

TRANSPORTADORA ASSOCIADA DE
Customer:
GÁS SA - TAG
GASFOR II - HORIZONTE CAUCAIA
Project:
SECTION
Report No.: RY-IR-TAG0059-22 - OIS-RN-045
Inspector/s: Fabio Vasconcelos
Visit Date/s: 22 to 26/08/2022
Inspection Report Report Date: Page 4of 7

Detailed here below, in a clear and concise way, the activities performed and the results:

8. HSE

Check and comment on results (as applicable)

Any Incidents
X PPE in Use Boots, helmet, ear protectors, leggings, goggles and gloves
X HSE Induction Given briefing
Child Labour Seen
Poor Working Conditions
Unfair / Forced Labour
Waste Recycling Practiced
Other

9. Attachments Section

Document Number Rev. Title


PR-4717.11-6521-954-NEE-016 THE APPLICATION OF DENSOLEN COATING - AS50
ITS 8.5.45 0 WORK INSTRUCTION

10. Pictures Section

Picture 1
Picture 2

abrasive blasting Sa 2 ½ Primer application

Picture 3 Picture 4

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

TRANSPORTADORA ASSOCIADA DE
Customer:
GÁS SA - TAG
GASFOR II - HORIZONTE CAUCAIA
Project:
SECTION
Report No.: RY-IR-TAG0059-22 - OIS-RN-045
Inspector/s: Fabio Vasconcelos
Visit Date/s: 22 to 26/08/2022
Inspection Report Report Date: Page 5of 7

Tape application (manual) 50% overlap

Picture 5 Picture 6

Temperature measurement of adhesion test adhesion test

Picture 7 Picture 8

Tape application (DENSOMAT Machine) Discontinuity Test (Holiday Detector)

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

TRANSPORTADORA ASSOCIADA DE
Customer:
GÁS SA - TAG
GASFOR II - HORIZONTE CAUCAIA
Project:
SECTION
Report No.: RY-IR-TAG0059-22 - OIS-RN-045
Inspector/s: Fabio Vasconcelos
Visit Date/s: 22 to 26/08/2022
Inspection Report Report Date: Page 6of 7

Picture 9 Picture 10

Joint identification date / batch / coaters / km joint finished

Picture 11 Picture 12

Identification Tag: Analog Rough Gauge Identification tag: Infrared Thermometer

Picture 13 Picture 14

Identification tag: Thermal hygrometer Identification tag: Digital Dynamometer

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01


Security level: RINA/CL/SENSITIVE

TRANSPORTADORA ASSOCIADA DE
Customer:
GÁS SA - TAG
GASFOR II - HORIZONTE CAUCAIA
Project:
SECTION
Report No.: RY-IR-TAG0059-22 - OIS-RN-045
Inspector/s: Fabio Vasconcelos
Visit Date/s: 22 to 26/08/2022
Inspection Report Report Date: Page 7of 7

Picture 15 Picture 16

Consumables storage bay Consumable material storage container

11. Checklist
ITEM INSPECTED ITEMS YEA NO AT
1 Clean surface, without any contaminating elements? x
two Used suitable solvent? x
3 Existing cladding with bevelled edge? x
4 Existing coating with detached parts? x
5 Sandblasted surface features minimal Sa pattern2 ½? x
6 Is the roughness profile within the compliance standard? x
7 Was weather protection provided? x
8 Is there evidence of monitoring weather conditions? x
9 Are all instruments properly calibrated? x
10 Do you have a checklist of instrument calibration certificates? x
11 Is the report issued by a qualified inspector? x
12 Are all applicators qualified? x
13 List of employees suitable for the application of the DENSOLEN System – AS50? x
14 Is the tape application free of detachment or air bubbles? x
15 Was an even coat of DEKOTEC-EP Primer applied? x
16 Has the Primer cured completely until it reached dry to the touch? x

Place: Gives you:

Signature and Stamp Inspector

Report Reviewed by:


Name: Title: Gives
you:

RINA Inspection Report Form FO-INSP-IR-01 Rev. 01