Inspection of Fabrication of Structural Steelwork out Hong Kong for the Project -
Columbarium at Cape Collison Road in Chai Wan (Programme No. 023NB)
Dear Sir,
Enclosed herewith please find our inspection report No.220196NT221312 Dated: 23/08/2022 for
Final inspection at Dongguan Qiaotou Zhude Hardware Processing Factory
Should you need further information on this report, please feel free to contact us.
V.K. Babu
Manager - NDT/Welding Dept.
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 2 of 13
Report No. : 220196NT221312 Date Inspected: 23-08-2022
Inspection Report (Galvanization)
Summary of Inspection
The total number of members that has been blast cleaned, the number of members that has been
1 inspected for blast cleaning in this visit, since the last inspection visit and the remaining number of
members that has not yet been blast cleaned; and
N/A
2 Identification of steel members for blast cleaning that has been inspected in the visit.
Ref to Appendix: 1
Record all the defects Galvanized surface is smooth without zinc slag Appendix: 2
Recommendation: Nil
Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 3 of 13
Report No. : 220196NT221312 Date Inspected: 23-08-2022
Inspection Report (Painting)
Summary of Inspection
The total number of members that has been blast cleaned, the number of members that has been inspected
1 for blast cleaning in this visit, since the last inspection visit and the remaining number of members that
has not yet been blast cleaned; and
N/A
2 Identification of steel members for blast cleaning that has been inspected in the visit.
Metal Railing : T5-5,T6-2,T8-3(3pcs),T5-6,T7-6,T8-5,T8-9,T7-10,T5-8,T6-9,T7-3,T1-1,T1-1,T1-4,T1-1,T1-5,A41,A9-
1,A9-2,A36-1,A36-2,D20-7,D17-4
Follow up of the Recommendation of the previous report No such activity during visit N/A
Witness T-wash process and application of primer No such activity during visit N/A
Check the dry film thickness of the paint coats Paint thickness is acceptable Appendix:4,7
Carry out other tests as appropriate No such activity during visit N/A
Recommendation: Nil
Conclusion: Rejected the delivery of railing and reported to the factory for repair.
Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 4 of 13
Report No. : 220196NT221312 Date Inspected: 23-08-2022
Inspection Report (Final Inspection)
Summary of Inspection
The total number of members that has been final check and pack up, the number of members that has
1 been inspected forfinal check and pack up in this visit, since the last inspection visit and the
remaining number of members that has not yet been final check and pack up; and
Refer to attached inspection progress
2 Identification of steel members for final check and pack up that has been inspected in the visit.
Ref to Appendix: 1
Check welds and stud welds according to approved Weld type and dimensions are in accordance
Appendix :2,3
shop drawings with approved construction drawings
Recommendation: Nil
Conclusion: Nil
Remark: Nil
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 5 of 13
Inspection Summary
- Finding:
1 QA/QC documents and records have not been provide during the visit.
Small amount of damage was found on paint surface. The painting peeled off easily because
of failure of paint adhesion issue and unacceptable.
2
(Metal Railing : T5-5, T6-2, T8-3(3pcs), T5-6, T7-6, T8-5, T8-9, T7-10, T5-8, T6-9, T7-3, T1-
1, T1-4, T1-5, A41, A9-1, A9-2, A36-1, A36-2, D20-7, D17-4)
2 Rejected the delivery of railing and reported to the factory for repair.
• Inspected by:
Name: Xu Chunyu Qualification: CSWIP3.1 Certified Welding Inspector
NACE level 1 coating inspector
Any attachment: Yes ■ No □
Appendix 1 to 8
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 6 of 13
Appendix: 1
Page 7 of 13
Appendix: 2
Page 8 of 13
Appendix: 3
Page 9 of 13
Appendix: 4
Page 10 of 13
Appendix: 5
Photo 26 to 33: Small amount of damage was found on paint surface. The painting peeled off easily because of failure of paint
adhesion issue and unacceptable.
FUGRO TECHNICAL SERVICES LIMITED
Tel : +852-2450 8233
Fugro Development centre, Fax : +852-2450 6138
5 Lok Yi Street, 17 M.S. Castle Peak Road, E-mail : matlab@fugro.com
Tai Lam, Tuen Mun, N.T., Hong Kong. Website : www.fugro.com
Page 11 of 13
Appendix: 6
Page 12 of 13
Appendix: 7
Page 13 of 13
Appendix: 8