Project Chiller Replacement 8000RT FLOOR / SLAB NO. LP+0.1 Slab Name Client Dcap Building Name Chiller Building (East Side)
Project Chiller Replacement 8000RT FLOOR / SLAB NO. LP+0.1 Slab Name Client Dcap Building Name Chiller Building (East Side)
fy ksc 4000
β= ksc 0.85
Effec Depth of Slab. (Req) (cm) 16.748 22.058 16.748 10.009 22.058 10.009
Check depth of Slab (O.K / No) O.K O.K O.K O.K O.K O.K
ρ require = (1- (1-2xRu/ 0.85 fc' ) )/m 1/m 0.0046 0.0016 0.0046 0.0019 0.0017 0.0019
Check As and spacing of Re-bar Pass/ No Pass Pass Pass Pass Pass Pass