Reaction Summary: The Maximum Load On Bore Pile Dia500mm, (Service Load)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Job No Sheet No Rev

1
Software licensed to Shinryo Corporation Part
CONNECTED User: Khun Rashaton
Job Title Ref

By Date02-Apr-22 Chd

Client File 24KV_Switchgear_12_MA Date/Time 14-Mar-2023 08:52


The maximum load on
Bore pile Dia500mm,
Reaction Summary (service load )
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kg) (kg) (kg) (kg-m) (kg-m) (kg-m)
Max FX 100 118:0.6DL+0.7E 807.13 11.4E+3 -245.49 0 -74.75 0
Min FX 801 105:DL+0.7EQX -806.54 18.9E+3 -245.53 0 14.96 0
Max FY 915 99:DL+LL -0.46 26.8E+3 -0.11 0 -8.00 0
Min FY 591 114:0.6DL+W-X -791.53 8028.81 -0.12 0 45.75 0
Max FZ 100 108:DL+0.7EQ -248.87 17.9E+3 804.46 0 -86.66 0
Min FZ 591 107:DL+0.7EQ -248.08 17.5E+3 -803.99 0 61.50 0
Max MX 99 99:DL+LL -0.84 24.9E+3 0.84 0 -9.37 0
Min MX 99 99:DL+LL -0.84 24.9E+3 0.84 0 -9.37 0
Max MY 591 124:DL+0.75(L -181.71 21.6E+3 614.11 0 120.07 0
Min MY 100 112:DL+0.75(LL 29.86 22.4E+3 -182.20 0 -190.74 0
Max MZ 99 99:DL+LL -0.84 24.9E+3 0.84 0 -9.37 0
Min MZ 99 99:DL+LL -0.84 24.9E+3 0.84 0 -9.37 0

Print Time/Date: 14/03/2023 08:53 STAAD.Pro CONNECT Edition 22.12.00.142 Print Run 1 of 1