Sequence of Work in Bored Pile Construction
Week 1 Excavation
3
©2006 Gammon Construction Limited. All Rights Reserved.
4
Presentation Scope
• Proactive Approach
©2006 Gammon Construction Limited. All Rights Reserved.
5
©2006 Gammon Construction Limited. All Rights Reserved.
6
Concreting of Bored Pile
General Setup
Concrete
Skip
Truck
Concreting
Platform
Ramp
Tremie
©2006 Gammon Construction Limited. All Rights Reserved.
Pipe
Concrete
7
Stages in Bored Pile Concreting
Tremie
Pipe Drop in
Concrete
Head
Temporary
Casing Concrete
Overbreak
©2006 Gammon Construction Limited. All Rights Reserved.
9
Grout
Cement
Concrete
QA / QC
10
©2006 Gammon Construction Limited. All Rights Reserved.
11
12:00
21:00
14:00
18:00
Concreting Takes Many Hours
Concreting Time Varies With Pile Length
30
25
Time (hours)
20
15
10
5
©2006 Gammon Construction Limited. All Rights Reserved.
0
0 20 40 60 80 100
Pile Length (m)
12
©2006 Gammon Construction Limited. All Rights Reserved.
13
Slump
Time
Slump Varies With Time
Common Problems Encountered
temporary casing
14
©2006 Gammon Construction Limited. All Rights Reserved.
15
Defects
©2006 Gammon Construction Limited. All Rights Reserved.
Honeycomb
16
©2006 Gammon Construction Limited. All Rights Reserved.
17
Air Voids
Entrapped Air Inside Concrete During Pouring
Air
Voids
©2006 Gammon Construction Limited. All Rights Reserved.
19
Remedial Actions
• Grouting
• Stitched pile
©2006 Gammon Construction Limited. All Rights Reserved.
• Additional pile
20
©2006 Gammon Construction Limited. All Rights Reserved.
21
Practice
Deficiencies in Current
First In …. Last Out
1* First few
truckloads
2 need to
3 remain
workable
throughout
concreting
18
©2006 Gammon Construction Limited. All Rights Reserved.
17
16
* Indicate order
of truckload
22
Deficiencies in Current Practice
• Quality control
– Need to control consistency in material
properties
23
The Proactive Approach
environmental restrictions)
– Site location (travel time to site from
batching plant)
24
Route to Pile Acceptance
Pile
Acceptance
Concrete
Performance
©2006 Gammon Construction Limited. All Rights Reserved.
Material
Time
Consistency
Delivery
~ 3 hours
©2006 Gammon Construction Limited. All Rights Reserved.
Grade 45/20
•Designed slump
200mm
•Workability 5 hours
26
SUCCESS STORY
Hong Kong – Shenzhen Western Corridor
27
©2006 Gammon Construction Limited. All Rights Reserved.
28
Way Forward
Concrete Triangle
Constructability
Designer
Concrete
Contractor
Supplier
29
©2006 Gammon Construction Limited. All Rights Reserved.
30
The End