Bill of Supply of Electricity: You Can Pay Using NEFT/RTGS

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

www.tpcentralodisha.

com
Bill of Supply of Electricity
Consumer Name : RABINDRA DAS. Rebate Date : 06/03/2023
Due Date : 06/03/2023
Address Details : PLOT NO - 39/507 BIJAYA BIHAR, NUAGAON Consumer A/C : 80031303011
-751002
Consumer ID : 0361173112357
: 103S04387337
Bill Number : 1513187407
Bill Issue Date : 27/02/2023
Email Id :
Bill Basis : Estimated
Mobile No : 9427438963 Last Bill Issue Date : 29/01/2023
Bill Month : 2023/02

Area Details Connection Details Supply and Meter Details


DIV : BED,BHUBANESWAR Tariff Category : Domestic Power Status : Active
Power Factor : 0.00
SUBDIV : TEMPLE Power on Hour : 696
SECTION : OLD TOWN 1 Contract Demand : 5.00 KW Billed Demand : 5.00KW
DT No. : Supply Voltage : 0.23 Meter Sl. No. : TVIS3955686
Pole No. : Own Transformer : Col. Meter No :
MRU No. : BED10111 ED Exemption : NIL Bill Period : 30.01.2023 - 27.02.2023
Walking Sequence : Date of Connection : 12/04/2016 Bill Days/Months : 29/1.0288
Organization : Security Deposit : 3,380.00 Load Factor : 0.00
Connection Type : Metering : LV Meter Reading : PL
Meter Reading Details - Estimated Due Date
Parameter Previous Current Reading M.F. Diff T.F Loss Total 06/03/2023
Reading ((Immediate for Arrears))
KWH 0.00 0.00 1.00 0.00 0.00 448.00 Total Amount Payable
MDI-KW 0.00 0.00 1.00 0.00 0.00 0.00 Rs. 2,398.00

Last Bill Amount Payment made Rebate Net Arrear Current bill DPS Adj/Inst Net Payable Amount(Rs.)
Amount Before Rbt. Dt. After Rbt. Dt.
4,069.00 4,069.00 -122.07 -121.93 2,520.70 0.00 0.00 2,354 2,398

Current Bill Details


a. Energy Charges 2,327.60 Adjustment Details for Information
1. Sundry Adjustment
Slab - 1- 50@3.00 150 Debit 0.00
Slab - 2- 150@4.80 720 Credit 0.00
Slab - 3- 200@5.80 1160
Slab - 4- 48@6.20 297.6 2. Interest on SD(After TDS) 0.00
b. Incentive on TOD 0.00
c. Demand Charge / MMFC 100.00 3. Others
d. Overdrawal penalty 0.00 Cross Subsidy Charges 0.00
e. Penalty for Fall in PF 0.00
f. Power Factor Incentive 0.00
g. Colony KWH charge 0.00 Disputed Amount 0.00
h. Load Factor Rebate 0.00
i. Mega Lift Rebate 0.00
j. Electricity Charge (a to i) 2,427.60 4a. Payment 1 14.02.20 4,069.00
k. Electricity Duty (4%) 93.10 4b. Payment 2 0.00
l. Meter Rent 0.00 4c. Payment 3 0.00
m. Customer Service Charge 0.00 4d. Payment 4 0.00
n. Tax Collection at Source 0.00 4. Total Payment 4,069.00
o. Current Total (i to n) 2,520.70
Allowable Prompt Payment Rebate -44.80 5. Last Rebate Allowed 0.00
Net Current payment after Rebate 2,475.90 6. Last digital rebate allowe -122.07

Message
The connection shall be liable for disconnection on non-payment of all dues including arrears of previous bill(s) by due date, after notice as per
Section 56(1) of the Electricity Act, 2003. Disputedamount is to be finalized on the outcome of the order of the respected court and the applicable
charges. ECS opt-in.Now consumer can pay using NEFT/RTGS, Account No - TPCODL (Followed by CA No withoutspace) e.g.
TPCODL8XXXXXXXXXX.
Division Office You Can Pay Using NEFT/RTGS Connect at Contact us
OFFICE OF THE EXECUTIVE Bank Name State Bank of India www.tpcentralodisha.com
ENGINEER(ELECT.) Account No. TPCODL8XXXXXXXXXX 1912
BHUBANESWAR IFSC SBIN0004266
ELECTRICAL Branch Corporate Accounts Group Branch, Mobile 1800 345 7122
DIVISION,INSIDE,33/11 KVA Address Neville House, JN Heredia Marg, App: 0674-2391110
SUB-STATION Ballard Estate, Fort, Mumbai-1 Mail At -
RASULGARH,BHUBANESWA customercare@tpcentralodisha.com

You might also like