Republic of the Philippines

MINDANAO STATE UNIVERSITY – GENERAL SANTOS CITY


DEPARTMENT OF CIVIL ENGINEERING
Fatima, General Santos City
2nd Semester: A.Y. 2022-2023

WORK BREAKDOWN STRUCTURE:


GRAPHICAL AND OUTLINE FORMAT

A Group Activity Submitted to


Engr. Nikol Telen

CVE172 – Construction Methods Project Management

The Royalty & Partners


QUEEN ANN JUMUAD
RUEL A. WENCESLAO JR.
MARJUN CHRISTOPHER A. ATANQUE
MAE CLAIRE C. BEJEC
JEHANA S. JAMEL
BENCELOF C. LANDAYAO
JOWELL LESHNER C. NAVARRO
ELLAINE FE S. PIQUERO
JANAH R. SABORNIDO
NAFEESA RAZIA Z. SINARIMBO
4th Year – Bachelor of Science in Civil Engineering
March 2023

1
OUTLINE FORMAT
MSU UNIVERSITY HOTEL
(7-STORY BUILDING W/ ROOFDECK)

1.0. Engineering Design


1.1. Conceptual Design
1.1.1. Hotel Concept
1.1.2. Hotel Brand
1.1.3. Design Criteria
1.1.4. Structural Systems
1.2. Schematic Design
1.2.1. Site Plan
1.2.1.1. Site Survey
1.2.1.2. Site Analysis
1.2.1.3. Environmental Consideration
1.3. Contract Design
1.3.1. Building A and B
1.3.1.1. Plot and Floor Plan
1.3.1.1.1. Hotel Room Layout
1.3.1.1.2. Public Spaces Layout
1.3.1.2. Architectural Finishes
1.3.1.2.1. Elevations
1.3.1.2.1.1. Building Facade
1.3.1.2.1.2. Materials Selection
1.3.1.2.2. Sections
1.3.1.2.2.1. Building Height
1.3.1.2.2.2. Structural Details
1.3.2. Building C
1.3.2.1. Plot and Floor Plan
1.3.2.1.1. Public Spaces Layout
1.3.2.2. Architectural Finishes
1.3.2.2.1. Elevations
1.3.2.2.1.1. Building Façade
1.3.2.2.1.2. Materials Selection
1.3.2.2.2. Sections
1.3.2.2.2.1. Building Height
1.3.2.2.2.2. Structural Details
1.3.3. Structural
1.3.3.1. Structural Design
1.3.3.1.1. Drawings
1.3.3.1.2. Calculations
1.3.3.2. Foundations
1.3.3.2.1. Soil Bearing Capacity
1.3.3.2.2. Shallow Foundation
1.3.3.2.3. Deep Foundation
1.3.3.3. Structural Frame
1.3.4. Mechanical System
1.3.4.1. HVAC
1.3.4.1.1. Load Requirements
1.3.4.1.2. Heating and Cooling Loads

2
1.3.4.1.3. Energy Analysis
1.3.4.2. Plumbing
1.3.4.2.1. Load Requirements
1.3.4.2.2. Specifications
1.3.5. Electrical System
1.3.5.1. Load Requirements
1.3.5.2. Lighting Requirements
1.3.5.3. Rough-in
1.3.5.4. Finish
1.3.5.5. Communication and Security Design
1.3.5.5.1. Specifications
1.3.6. Fire Protection System
1.3.6.1. Load Requirements
1.3.6.2. Specifications
1.4. Internal Design
1.4.1. On-site Utilities
1.4.1.1. HVAC Design
1.4.1.1.1. HVAC Equipment
1.4.1.1.2. Ductwork and Piping
1.4.1.1.3. HVAC Controls
1.4.1.2. Plumbing
1.4.1.2.1. Domestic Water System
1.4.1.2.2. Sanitary Sewer System
1.4.1.2.3. Stormwater Management System
1.4.1.2.4. Gas System
1.4.1.3. Power Distribution
1.4.1.3.1. Distribution System
1.4.1.3.2. Emergency Power System
1.4.1.4. Lighting Design
1.4.1.4.1. Interior Lighting Design
1.4.1.4.2. Exterior Lighting Design
1.4.1.4.3. Lighting Controls
1.4.1.5. Communication and Security Design
1.4.1.5.1. Telecommunications
1.4.1.5.2. Security and Access Control
1.4.1.6. Fire Protection System
1.4.1.6.1. Fire Alarm System
1.4.1.6.2. Fire Suppression System
1.4.1.6.3. Life Safety Design
1.4.2. Site Work
1.4.2.1. Site Grading and Preparation
1.4.2.2. Site Improvement
1.4.2.2.1. Fencing
1.4.2.2.2. Landscaping
1.4.2.2.3. Irrigation
1.4.2.3. Earthwork
1.4.2.3.1. Excavation and Grading
1.4.2.3.2. Soil Stabilization
1.4.2.3.3. Compaction
1.4.2.3.4. Backfilling
1.4.2.4. Paving

3
1.4.2.4.1. Sub-base
1.4.2.4.2. Concrete
2.0. Procurement
2.1. Overhead Crane
2.2. Site Work Contractor
2.3. Architectural Bid
2.3.1. Commercial Contractor Bid
2.3.2. Industrial Contractor Bid
2.4. Legal and Regulatory Compliance
3.0. Construction
3.1. Site Construction
3.1.1. Utilities
3.1.1.1. HVAC Design
3.1.1.1.1. Ductwork and Piping
3.1.1.1.2. HVAC Controls
3.1.1.2. Plumbing
3.1.1.2.1. Domestic Water System
3.1.1.2.2. Sanitary Sewer System
3.1.1.2.3. Stormwater Management System
3.1.1.2.4. Gas System
3.1.1.3. Power Distribution
3.1.1.3.1. Distribution System
3.1.1.3.2. Emergency Power System
3.1.1.4. Lighting Design
3.1.1.4.1. Interior Lighting Design
3.1.1.4.2. Exterior Lighting Design
3.1.1.4.3. Lighting Controls
3.1.1.5. Communication and Security Design
3.1.1.5.1. Telecommunications
3.1.1.5.2. Security and Access Control
3.1.1.6. Fire Protection System
3.1.1.6.1. Fire Alarm System
3.1.1.6.2. Fire Suppression System
3.1.1.6.3. Life Safety Design
3.1.2. Site Work
3.1.2.1. Site Grading and Preparation
3.1.2.2. Site Improvement
3.1.2.2.1. Fencing
3.1.2.2.2. Landscaping
3.1.2.2.3. Irrigation
3.1.2.3. Earthwork
3.1.2.3.1. Excavation and Grading
3.1.2.3.2. Soil Stabilization
3.1.2.3.3. Compaction
3.1.2.3.4. Backfilling
3.1.2.4. Paving
3.1.2.4.1. Sub-base
3.1.2.4.2. Concrete
3.2. Building A, B, and C
3.2.1. Structural
3.2.1.1. Foundations

4
3.2.1.2. Structural Frame
3.2.2. Mechanical System
3.2.2.1. HVAC
3.2.2.2. Plumbing
3.2.3. Electrical System
3.2.3.1. Rough-in
3.2.3.2. Finish
3.2.4. Fire Protection System
3.2.5. Architectural
3.2.5.1. Room Finishes

5
GRAPHIC FORMAT

MSU UNIVERSITY HOTEL


(7-STORY BUILDING W/ ROOFDECK)